Baishan Dam

The Baishan Dam (Chinese: 白山水库, meaning: "White Mountain Dam") is an arch-gravity dam on the Second Songhua River near the town of Baishanzhen, Huadian, Jilin Province, China. The purpose of the dam is hydroelectric power generation and flood control. The dam supplies water to five turbine-generators in two different powerhouses for an installed capacity of 1,500 megawatts (2,000,000 hp) while it can also control a design 19,100 cubic metres per second (670,000 cu ft/s) flood. Additionally, it has a 300 megawatts (400,000 hp) pumped-storage hydroelectric generation capacity. It is named after Baekdu Mountain (White Mountain), near the city of Baishan.

Baishan Dam
Location of Baishan Dam in China
CountryChina
LocationHuadian, Jilin Province
Coordinates42°43′35″N 127°13′28″E
StatusIn use
Construction began1975
Opening date1984
Dam and spillways
Type of damArch gravity
ImpoundsSecond Songhua River
Height149.5 m (490 ft)
Length677.5 m (2,223 ft)
Dam volume1,663,000 m3 (58,728,291 cu ft)
Spillways4
Spillway typeService, crest overflow
Reservoir
CreatesBaishan Reservoir
Total capacity6,500,000,000 m3 (5,269,636 acre⋅ft)
Catchment area19,000 km2 (7,336 sq mi)
Power Station
Commission datePhase I: 1984
Phase II: 1992
PS: 2006
TypeConventional and Pumped-storage
Hydraulic head110 m (361 ft) (design)
Turbines5 x 300 MW (400,000 hp) Francis turbines conventional
2 x 150 MW (200,000 hp) Pumped-storage
Installed capacity1,800 MW (2,400,000 hp)

Construction

Construction on the dam began in May 1975, the reservoir began to fill on September 16, 1982 and by the end of 1984, the first phase of three generators was operational. Another two generators in the project's second phase were operational by 1992.[1] The dam submerged an area of 17.67 square kilometres (6.82 sq mi), displacing about 10,300 people.[2]

In March 2000, a feasibility study report on a pumped-storage capability for the dam was approved. In August 2002, construction started on installing two 150 MW reversible pump generators and by July 2006, they were operational.[3]

Design

The Baishan Dam is a 149.5 metres (490 ft) tall and 677.5 metres (2,223 ft) long arch gravity dam composed of 1,663,000 cubic metres (58,700,000 cu ft) of concrete.[4] It withholds a 6,500,000,000 cubic metres (5,300,000 acre⋅ft) reservoir of which 3,540,000,000 cubic metres (2,870,000 acre⋅ft) is active or "useful" storage and 950,000,000 cubic metres (770,000 acre⋅ft) is flood storage. The dam's spillway contains four 12 by 13 metres (39 ft × 43 ft) openings and three 6 by 7 metres (20 ft × 23 ft) mid-level openings on its orifice.[1] All the dam's openings can discharge a design of 19,100 cubic metres per second (670,000 cu ft/s), check standard of 26,200 cubic metres per second (930,000 cu ft/s) and maximum of 32,200 cubic metres per second (1,140,000 cu ft/s) of water.[2]

The dam powers three separate power stations. The first station to be constructed is located underground and contains 3 x 300 MW Francis turbine generators while the second, located on the left bank slightly downstream contains 2 x 300 MW Francis turbine generators.[1] The third portion of the dam's power station is 2 x 150 MW pump-generators. The dam's current reservoir serves as the upper and the Hongshi Dam's reservoir downstream serves as the lower.[3]

See also

References

  1. "Hydropower Stations in Northeast China". Embassy China. 2004-07-29. Retrieved 9 January 2011.
  2. "Baishan Hydropower Station" (in Chinese). Water Pub. Archived from the original on 14 March 2012. Retrieved 9 January 2011.
  3. "吉林白山抽水蓄能电站顺利通过验收 (Jilin Baishan Pumped Storage Power Station passed acceptance)" (in Chinese). Polaris Power News Center. May 27, 2008. Retrieved 9 January 2011.
  4. "Dams Overview". Geokon, Inc. Archived from the original on 1 December 2010. Retrieved 9 January 2011.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.