Emile Serisier Bridge
The Emile Seriser Bridge is a low-level, four-lane road bridge which crosses the Macquarie River in Dubbo, New South Wales, Australia. The bridge carries the Newell Highway, a major freight corridor, and along with the L.H. Ford Bridge on the Mitchell Highway makes Dubbo a major freight hub.[2]
Emile Serisier Bridge | |
---|---|
Eastern end of the Emile Serisier Bridge | |
Coordinates | 32°14′34″S 148°35′59″E |
Carries | Newell Highway
|
Crosses | Macquarie River |
Locale | Dubbo, New South Wales |
Named for | Jean Emile Serisier |
Characteristics | |
Material | Concrete |
Total length | 90 metres (300 ft)[1] |
Height | 257.6 metres (845 ft) AHD |
No. of lanes | 4 |
History | |
Construction end | 1986[1] |
Location | |
The bridge is prone to flooding, being only 257.6 metres on the Australian Height Datum and lower than the 1-in-10-year recurrence interval flood level of 259.97 metres AHD for the Macquarie River at Dubbo.[2] When the bridge is closed due to flooding, traffic is diverted to the two-lane L.H. Ford Bridge,[3] which can result in congestion and long travel delays due to capacity issues.[4][1]
References
- "Work starts to improve road surface on Emile Serisier Bridge at Dubbo". Roads and Maritime Services. Retrieved 11 September 2020.
- "Costs flowing from disruptions to infrastructure during natural disaster events" (PDF). Australian Business Round Table. Retrieved 28 April 2020.
- Walker, Ben (20 July 2016). "Serisier Bridge expected to close on Thursday". Daily Liberal. Retrieved 28 April 2020.
- "New Dubbo Bridge: Hydrology and hydraulics working paper" (PDF). Roads and Maritime Services. Retrieved 28 April 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.