Erfurt Hauptbahnhof

Erfurt Hauptbahnhof (Erfurt Hbf) or Erfurt Central Station[3][4][5] is the central railway station at Erfurt in Germany.[6] It is an important junction on the German rail network, served by numerous local and long-distance rail services. Immediately north of the station is Erfurt's city centre. The station was used by approximately 12.5 million passengers in 2006, an average of about 34,000 per day. The station lies on the Thüringer Bahn, which connects Halle to Bebra. It is served also by the Erfurter Bahn.

Erfurt Hauptbahnhof
Through station
Entrance hall of station building
LocationWilly-Brandt-Platz 12, Erfurt, Thuringia
Germany
Coordinates50°58′22″N 11°2′16″E
Owned byDeutsche Bahn
Operated by
Line(s)
Platforms10
Connections
  • ICE
  • IC
  • RE 1RE 2RE 3RE 7RE 10RE 16RE 17STx 45STx 50RE 55RE 56
  • RB 20EB 21EB 23STB 44STB 46RB 52RB 59
Construction
ArchitectGössler Kinz Kreienbaum Architekten BDA (new parts)
Architectural style
  • Historicism (old parts)
  • modern glass architecture (new parts)
Other information
Station code1634[1]
DS100 codeUE[2]
IBNR8010101
Category2[1]
Fare zoneVMT
Websitewww.bahnhof.de
History
Opened1846
Passengers
34,000
Services
Preceding station   DB Fernverkehr   Following station
towards Hamburg or Berlin
ICE 11
via Stuttgart - Frankfurt - Erfurt - Leipzig - Berlin
towards Munich
ICE 15
via Halle (Saale) - Erfurt
Terminus
ICE 18
via Nürnberg - Erfurt - Halle (Saale) - Berlin
towards Munich
ICE 28
via Nürnberg - Erfurt - Leipzig - Berlin
towards Munich
ICE 29
via Nürnberg - Erfurt - Halle (Saale)
towards Munich
towards Wiesbaden
ICE 50
towards Dresden
towards Berlin
ICE 91
towards Vienna
Preceding station   FlixTrain   Following station
towards Stuttgart
FLX 10
via Frankfurt (Main) - Erfurt
towards Berlin
Preceding station   DB Regio Südost   Following station
toward Göttingen
RE 1
via Mühlhausen - Erfurt - Jena - Gera
Döllstädt
RE 2
via Eichenberg - Leinefelde - Mühlhausen
Terminus
TerminusRE 3
via Jena - Gera
toward Altenburg or Greiz
TerminusRE 7
Mainfranken-Thüringen-Express
via Ebenhausen (Unterfr)
toward Nordhausen
RE 55
via Straußfurt
Terminus
toward Nordhausen
RE 56
via Straußfurt - Sondershausen
Terminus
toward Leinefelde
RB 52
via Mühlhausen - Döllstädt
Terminus
Preceding station   Abellio Rail Mitteldeutschland   Following station
TerminusRE 10
via Sangerhausen
Stotternheim
TerminusRE 16
via Naumburg (Saale) - Weimar
TerminusRE 17
via Weimar - Bad Sulza
toward Eisenach
RB 20
via Gotha - Erfurt - Weimar - Naumburg (Saale)
Vieselbach
toward Leipzig Hbf
TerminusRB 59
via Sömmerda
toward Sangerhausen
Preceding station   Erfurter Bahn   Following station
TerminusEB 21
Elster Saale Bahn
Vieselbach
toward Gera Hbf
TerminusEB 23
Elster Saale Bahn
Preceding station   Süd-Thüringen-Bahn   Following station
toward Ilmenau
STx 45Terminus
toward Meiningen
STx 50Terminus
toward Meiningen
STB 44Terminus
toward Ilmenau
STB 46Terminus
Location
Erfurt Hauptbahnhof
Location within Thuringia
Erfurt Hauptbahnhof
Location within Germany
Erfurt Hauptbahnhof
Location within Europe

It was rebuilt from 2002 to 2008 for the completion of the Nuremberg–Erfurt high-speed railway and the Erfurt–Leipzig/Halle high-speed railway and connects the Berlin–Munich and Frankfurt–Dresden long-distance routes.

Location in the city centre

Erfurt Hauptbahnhof is located in the district of Altstadt (old town), 500 metres south of the Anger (the Erfurt central square, literally, the village green), on the former fortress established in the 15th century. To the south, it borders on the districts of Löbervorstadt and Daberstedt. The marshalling yard and freight yard as well as the operating facilities of the Hauptbahnhof are located to the east in the Krämpfervorstadt. There and in Daberstedt there used to be numerous apartments for railwaymen. The station itself is bordered to the south by the Flutgraben (flood channel) and to the north by Willy-Brandt-Platz. Underneath the railway station is the station road, which is used by the city's public transport. It is used by tram lines 1, 3, 4, 5 and 6 as well as bus routes. Other buses run to the bus station located 150 metres northeast of the station in Bürgermeister-Wagner-Straße. In the adjacent Kurt-Schumacher-Straße there is car access to the station, parking lots, taxis ranks and the InterCityHotel. The old station hotel, the Erfurter Hof, was the location in March 1970[7] of the Erfurt Summit between Willy Brandt and Willi Stoph, the first meeting between leaders of East Germany and West Germany. Today it is used as a business centre.

History

Erfurt Hauptbahnhof has experienced several new developments and reconstructions in the course of its history.

1846–1890 station

The location of the first Erfurt station was controversial. Inside the Erfurt city walls there were only a very limited area available and outside the fortifications a suitable area was available in the Krämpfer field to the east of the Schmidtstedter Tore (gate). The Erfurt Mayor, Karl Friedrich Wagner, however, argued in favour of a location within the city fortification and the Prussian authorities and the military also demanded that the route of the railway line pass through the fortress ramparts, so that they could stop railway operations in crisis situations. In July 1845, the decision was finally taken to build the station within the fortifications, north of the hohen Batterie (high battery).[8]

First station (1847–1890), late site of Erfurt marshalling yard

The first railway station was built in 1846 during the construction of the Thuringian Railway by the Thuringian Railway Company (Thüringische Eisenbahn-Gesellschaft). The location chosen meant that the construction of two double tunnels through the fortress wall and several wooden bridges across the moat would be required. It was opened with the Weimar–Erfurt line on 1 April 1847 with all buildings finished except for the entrance building, which was completed in 1852.[9] Apart from the unfinished entrance building, the station had at its opening a locomotive building, a goods shed, a carriage shed, a coke shed, a shed for reserve locomotives and an operations workshop. Within a few years of its opening, the infrastructure was no longer sufficient for the growing needs. Two buildings, an additional goods sheds and a carriage shed, were planned in 1850 and completed in 1854. An enlargement of the locomotive shed was necessary in 1852 and the freight yard was expanded from 1855. One year later, the side wing of the workshop received another floor; the coke shed was converted into a locomotive shed together with a large turntable after the conversion of locomotive operations to coal.[10]

A further expansion of freight transport facilities followed in 1860. The two existing freight sheds were expanded and a third was built. However, the lack of space within the fortifications grew increasingly noticeable, and the Thuringian Railway Company purchased a large area in front of the Schmidtstedter gate in 1865 to erect a freight yard. Due to the Austro-Prussian War of 1866, the start of construction was delayed and work only began in the following year. Freight sheds were built in 1871, allowing the freight yard to be opened in 1872, but it was only finally completed five years later in 1877.[11]

The timetable at the opening of Erfurt Hauptbahnhof showed four trains running daily between Halle and Erfurt with a journey time of three to three and a half hours. Ten years later, in the summer of 1857, two express trains, three ordinary passenger trains, and one mixed train ran daily between Halle and Eisenach via Erfurt.[12]

The Nordhausen-Erfurt Railway Company (Nordhausen-Erfurter-Eisenbahn-Gesellschaft) opened the Nordhausen–Erfurt railway on 17 August 1869. The Erfurt terminus was originally at the Nordhäuser Bahnhof (Nordhausen station) on the Schmidtstedter field; there existed from the outset a transfer railway to the station of the Thuringian Railway Company and from 1872 passenger trains continued through to its station. The Nordhäuser Bahnhof served freight traffic from then on and its entrance building is now used as a residential house. The Sangerhausen–Erfurt railway also originally ended at its own station, the Sangerhäuser Bahnhof, after the opening of the section to Erfurt on 24 October 1881. It was not far from the Nordhäuser Bahnhof and was integrated into the Thuringian station a few years later via the branch line of the Thuringian Railway to the Royal Salt Mine at Ilversgehofen. After that the Sangerhäuser Bahnhof was also exclusively used for freight transport.[11]

The three-storey entrance building of the first Erfurt station is still preserved and is now used by Deutsche Bahn AG. It is located west of today's Hauptbahnhof and has a white/olive colour scheme. Previously, with the low buildings on Bahnhofstraße (station street), its tower was widely visible. The building operated from 1847 to 1890 and later became the seat of the railway division (Reichsbahndirektion) of Erfurt.

1890–2002 station

The second station building was built as an island station from 1887 to the plans of the railway construction inspector (Eisenbahnbauinspektor) Eduard Keil and the government architect Otto Erlandsen and put into operation in 1893. It is located 30 metres east of the first station building and consisted of a station entrance hall on the station forecourt with shops and the ticket offices as well as the actual entrance building, which was located between the tracks. The buildings were designed in the style of Historicism, with yellow veneer walls and red sandstone walls and ceilings. The tracks were located on an embankment, the former fortress wall.

South-side 1990
Track plan in 1957
Platform numbers from 1975 to 2005

The station had a track on the south side of platform 5 and 6 for the through track for the main line from Bebra to Halle and on the north side of platform 1 and 2 for the track for the opposite direction. In 1912, an additional set of points was installed at platform 1, which made it possible to process two trains one after the other at platforms 1 and 2. In addition, there were two tracks, which were on the north side and served as transit routes for freight transport from Erfurt freight yard to Neudietendorf. The eastern bay platform 4 was used by trains to and from Sangerhausen and the adjacent bay platform 3 by trains to and from Nordhausen and Bad Langensalza. The western bay platforms 2 and 6 mostly served trains to and from Arnstadt and towards Suhl, Ilmenau or Saalfeld. In addition, on the south side, there was the island platform 7, with through tracks for trains heading east to Weimar, which was built in 1940/1941. The platform designation was valid until 1975. After that there was a new numbering system, giving each track at a platform its own number. In 1992, Deutsche Bundesbahn finally changed to using the term Gleis (track) instead of Bahnsteig (platform). This was, however, a bit problematic because the in-house track numbers used in the signalling technology did not correspond to the adopted track numbers.

The station had the "Ew" signal box on the southern side at its western entrance and the elevated "Er" signal box at the eastern exit. In addition between the tracks 5 and 8 there were the "mushroom" signal box "Es" as well as the small "Ev" signal box (Vogelnest—"bird’s nest") in the entrance hall. The station tracks were electrified in 1967.

This second station building operated in its original form until 2000. Only the entrance hall, which has been integrated into the new, third station, still stands.

Station reconstruction

Construction in August 2007 (aerial photo)

The Zentrale Hauptverwaltung (ZHvDR—central headquarters) of Deutsche Reichsbahn was given the task of carrying out preliminary planning work at the Erfurt node on 18 August 1992. Planning work was then started. The preliminary planning documents were provided to ZHvDR for confirmation in mid-1993. They proposed a new electronic signalling centre, the renewal of 44 km tracks and 143 sets of points. 11 bridges in the urban area of Erfurt would be replaced or rehabilitated. The estimated cost of these measures was DM 439 million.[13]

The station was comprehensively modernised from 2002—after the demolition of the historical island building, which gave the station its appearance until then—and was officially handed over to the traffic on 13 December 2008, although not all reconstruction work had yet been completed. The cost of the reconstruction would amount to about €260 million.[14] The Free State of Thuringia and the City of Erfurt would contribute €44 million of this.[14]

The planning approval for the reconstruction was given in the mid-1990s. The official groundbreaking was celebrated on 22 September 2001.[14] The newly constructed track layout comprise 21 platform tracks at 12 platforms as well as 67 sets of points. Six railway bridges were built during the construction work. Underneath the station a shopping arcade has been built on an area of around 3,000 m². Underneath this shopping arcade is an underground car park. Both facilities were reduced in size during the planning phase.[15]

An open competition was held for the design of the new station.[16] In the autumn of 1995, an eleven-member jury selected the winning plan for the station from a total of 123 submissions.[17] Civil protests against the demolition of the historic island building, which was supported by a building historian of the Bauhaus University, Weimar, were not considered.

Planning approval was given for the reconstruction of the railway node in September 1995. The planned measures included five kilometres of track, 46 kilometres of overhead wires and the renewal of eight railway bridges.[7]

The financing agreement for the reconstruction was concluded on 26 March 1998. The planned total costs were around DM 207 million. Work would start in the autumn of 1999 and be completed in 2003.[18] An electronic interlocking for controlling the Erfurt rail node was put into operations before the start of the large-scale construction work on 14 March 1999. This replaced the eight[14] relay, electro-mechanical and mechanical signal boxes, which were up to 92 years old and controlled by up to three train dispatchers, 155 sets of points, 154 signals and 119 repeater signals.[19][20] This early completion had become necessary, as there was a ban had been placed on refurbishing the old signalling technology. Conceptually, the plan provided for a safety-related longitudinal separation of the station, in order to be able to carry out the rebuilding in stages.[21] The electronic interlocking is now remote-controlled from the Leipzig signalling centre.[22]

In October 2001, Vieselbach and Hopfgarten stations and three block posts were also connected to the Erfurt electronic interlocking.[19]

The renovated entrance building went into operation on 21 August 2002 after eight months of construction. The construction works, which were then estimated to cost around €250 million were expected to be completed by 2006.[23]

The extensive reconstruction of Erfurt Hauptbahnhof started in 2002. A comprehensive redesign of the track layout was carried out as well as the demolition of part of the existing entrance building and the underpass of Bahnhofstraße. As a result of the rebuilding, Erfurt Hauptbahnhof will be able to operate as a junction between the Nuremberg–Erfurt and Erfurt–Leipzig/Halle high-speed lines. A major goal of the planning was to link the ICE line between Munich and Berlin with the ICE line between Frankfurt am Main and Dresden and to reduce travel times by means of interchange.

In the meantime, the construction work was suspended for two years, when it was unclear whether the two high-speed lines projects connecting with Erfurt would be realised.

Inside the station
Erfurt Hbf. looking towards Halle in 2014

The new station was built in several stages, as train operations had to be fully maintained. A provisional platform for the additional track 7a was first built on the south side of the station. An island platform with nine through tracks and four bay platforms were built. The two outside located long-distance platforms 1/2 and 9/10 have a length of 420 metres.

The two-aisled, 154 metre long hall roof consists of one side aisle that has a 20 metre wide span and another side aisle that has 65 metre wide span, with a maximum height of around 20 metres. The originally planned length was 190 metres.[15] During the rebuilding of the around 2.5 kilometre-long rail junction area, soundproof walls with a total length of around 3.0 kilometres were also installed.

The converted entrance hall was opened in 2005 as a first part of the new railway station.

The north side of the main station was officially put into operation at the timetable change in December 2005.[24] It consisted of a "half" glass hall on the upper floor, which spans the newly opened northern island platform with tracks 1 and 2 and partly the middle platform, as well as a shopping arcade on the ground floor and an underground car park.

At this time, the planned total costs were €260 million. These funds were supplied by the state of Thuringia, the city of Erfurt and Deutsche Bahn.[24]

The next section was opened on 3 June 2007. Working to a 44-hour limit, the northern part of the platform with track 3 as well as the four new tracks 4 and 5 on the eastern platform and 6 and 7 on the western platform were put into operation. In the last phase of construction, the old southern part of the track area (old tracks 5, 6, 7 and 7a), including the old pedestrian overbridge, were demolished by March 2008. Then the rest of the glass roof construction and the platforms underneath were built with tracks 8, 9 and 10. Commissioning took place on 30 November 2008 after a 27-hour total blockade. In the process, the southern long-distance platform 9 was put into operation, first as a 320-metre-long bay platform without overhead wire, and platform 10 was opened with a provisional connection until two subsequent bridge structures were completed in the eastern exit.

At the end of May 2012, in a 64-hour possession, additional tracks for the high-speed lines were integrated east and west of the station with a length of 12 kilometres. The platforms 9/10 were now connected in both directions and its full length of 420 metres was usable as an ICE platform. In addition, the new southern entrance to the Flutgraben was handed over and the waiting room was redesigned.

A crossing structure was built east of the station in Daberstedt to allow trains on the high-speed to Leipzig to pass over the tracks of the lines from Sangerhausen and Wolkramshausen. At Pentecost 2013, the structure was put into operation during a further blockade of the node. The commissioning of five tracks in the western part of the station took place at that time.[25]

A total of nine full possessions are planned for the integration of the two new lines.[25] A total of €336 million had been invested up to May 2012 of the total estimated cost of €480 million.[26] Several dozen companies and more than 300 people were involved in the project (as of August 2014).[27] The station was fully blockaded from 20 to 22 November 2015 for the commissioning of additional tracks. Two further construction stages, each requiring a full possession, are still outstanding.[28] At the end of November 2017, there was a blockade to allow the installation of a new software version of the ETCS.[29]

After the completion of the work, the running speed will be raised to 100 km/h. In a second stage of construction, the line from Eisenach is to be connected with the high-speed lines to Leipzig. Due to a lack of funds, this is only an option for which appropriate land has been reserved.

Located in the area of the station are two of the three electronic interlocking subcentres (Erfurt and Erfurt NBS),[30] Erfurt Knoten and Erfurt Neubaustrecke, as well as two of the five ETCS Radio Block Centres of the new high-speed lines, being built under German Unity Transport Project No. 8 (Verkehrsprojekt Deutsche Einheit Nr. 8).[31] These facilities are housed in a modular building on the north side of the freight station.

Traffic services

The unique position of the station at the Willy-Brandt-Platz combines the regional and long-distance trains with perfect connections to the regional bus station, tram services, local buses, taxi cabs, long-distance buses, an underground car park and two bike stations.

Long-distance trains

The following tables show the status of time table 2021:

Line Route Frequency (min)
ICE 11 MunichStuttgartMannheimFrankfurt (Main)FuldaEisenachErfurtLeipzigLutherstadt WittenbergBerlin 120
ICE 15 Berlin GesundbrunnenBerlin CentralHalle (Saale)ErfurtFrankfurt (Main)120 (Sprinter)
ICE 18 MunichNurembergErfurtHalle (Saale)BitterfeldBerlin CentralBerlin-SpandauHamburg CentralHamburg-Altona 120
ICE 28 MunichNurembergErfurtLeipzigLutherstadt WittenbergBerlin CentralBerlin-SpandauHamburg CentralHamburg-Altona 120
ICE 29 MunichNurembergErfurtHalle (Saale)Berlin CentralBerlin Gesundbrunnen 5 Train couples (Sprinter)
ICE 50 Dresden – Riesa – LeipzigErfurtGothaEisenachFuldaFrankfurt (Main) CentralFrankfurt AirportMainzWiesbaden120 (Lufthansa Express Rail)
ICE 91 Berlin Central – Halle (Saale) – ErfurtCoburgNuremburgPassauLinzSt. PoeltenVienna One train couple
EC 62 GrazSalzburg – Munich – Stuttgart – Heidelberg – Frankfurt (Main) – Eisenach – Gotha – Erfurt Single train
IC 51 Duesseldorf/CollogneDortmundKasselEisenachErfurtWeimar – Jena – Gera Two train couples
Kassel – Bebra – Eisenach – ErfurtWeimar – Jena – Gera One train couple
LeipzigWeimarErfurtGothaEisenachFuldaHanau – Frankfurt (Main) Single trains (Fr, Su)
Collogne/Duesseldorf – Essen – Bochum – Dortmund – Kassel – Bebra – Eisenach – Erfurt – Weimar – Leipzig

Regional trains

Due to the central position, Erfurt has connections to all regions inside Thuringia. Red highlighted trains have fewer stops. Blue highlighted trains are stopping services.

Line Route Frequency (min) Vehicle type Railway company
RE 1GöttingenLeinefelde – Gotha – ErfurtJena-GöschwitzGeraGößnitzGlauchau (Sachs)120BR 612DB Regio
RE 2Erfurt – Bad Langensalza – Mühlhausen (Thür) – Leinefelde – Eichenberg – Kassel Wilhelmshöhe120BR 642DB Regio
RE 3Erfurt – Weimar – Jena-Göschwitz – Hermsdorf-Klosterlausnitz – Gera – Altenburg/Greiz – Elsterberg120BR 612DB Regio
RE 3VErfurtWeimarJena WestJena-Göschwitz120BR 612DB Regio
RE 7ErfurtArnstadtPlaue (Thür) – Zella-Mehlis – Suhl – Grimmenthal – SchweinfurtWürzburg120BR 612DB Regio
RE 10ErfurtSömmerda – Artern – Sangerhausen – Hettstedt – Güsten – Staßfurt – Magdeburg120BR 642DB Regio
RE 16Erfurt – Weimar – Apolda – Großheringen – Bad Kösen – Naumburg (Saale)120BR 9442Abellio
RE 17Erfurt – Weimar – Apolda – Bad Sulza – Bad Kösen – Naumburg (Saale) – Weißenfels – Leipzig120BR 9442Abellio
RE 45Erfurt – Arnstadt – Plaue (Thür) – Zella-Mehlis – Suhl – Grimmenthal – MeiningenSingle trainsBR 612DB Regio
RE 55Erfurt – Straußfurt – Greußen – Sondershausen – Wolkramshausen – Nordhausen120BR 642DB Regio
RE 56Erfurt – Straußfurt – Greußen – Sondershausen – Wolkramshausen – Nordhausen120BR 642DB Regio
RB 20Eisenach – Gotha – Erfurt – Weimar – Apolda – Naumburg (Saale) – Merseburg – Halle (Saale)060BR 9442Abellio
RB 23ErfurtNeudietendorf – Arnstadt – Stadtilm – Rottenbach – Saalfeld (Saale)120BR 650Erfurter Bahn
RB 44Erfurt – Neudietendorf – Arnstadt – Plaue (Thür) – Zella-Mehlis – Suhl – Grimmenthal – Meiningen120BR 650Süd-Thüringen-Bahn
RB 46Erfurt – Neudietendorf – Arnstadt – Plaue (Thür) – Ilmenau (– Rennsteig)060BR 650, ITINOErfurter Bahn
RB 52Erfurt – Bad Langensalza – Mühlhausen (Thür) – Leinefelde120BR 642DB Regio
RB 59Erfurt – Sömmerda – Artern – Sangerhausen – Lutherstadt Eisleben – Halle (Saale) – Bitterfeld120BR 9442Abellio
RB 59Erfurt – Erfurt Ost – Stotternheim – Großrudestedt – Sömmerda060BR 9442Abellio

City tram

The station is served by five of six tram lines and also by many bus lines. The central bus station is directly opposite to the entrance hall. All tram lines are operated by low floor vehicles. With the trams you can reach the university in the north of the city and also the international airport in the western district called Bindersleben.

LineRoute
1Europaplatz - Rieth - Lutherkirche(Luther church) - Augustinerkloster(Augustinian monastery) - Anger - Hauptbahnhof - Thüringenhalle
3Europaplatz - Universität(University) - Klinikum(Clinical centre) - Domplatz(Cathedral square) - Anger - Hauptbahnhof - Urbicher Kreuz
4Bindersleben - Flughafen(Airport) - Bundesarbeitsgericht(Federal labour court) - Domplatz(Cathedral square) - Anger - Hauptbahnhof - Wiesenhügel
5Zoopark(Zoo) - Grubenstraße - Lutherkirche(Luther church) - Augustinerkloster(Augustinian monastery) - Anger - Hauptbahnhof
6Rieth - Universität(University) - Domplatz(Cathedral square) - Rathaus(City hall) - Anger - Hauptbahnhof - Steigerstraße

Photogallery

References

Notes

  1. "Stationspreisliste 2021" [Station price list 2021] (PDF) (in German). DB Station&Service. 16 November 2020. Retrieved 3 December 2020.
  2. Eisenbahnatlas 2009, p. 192.
  3. ThüringenCard on the website of Thuringia Tourism. Retrieved 28 Feb 2014.
  4. Traveling to Erfurt at the University of Erfurt website. Retrieved 28 Feb 2014.
  5. Erfurt Central Station at the International Database for Civil and Structural Engineering. Retrieved 28 Feb 2014.
  6. Eisenbahnatlas 2009, p. 132.
  7. Eine neue Bahn für Thüringen, Deutschland und Europa. Die Eisenbahnneubaustrecke Ebensfeld–Erfurt (in German). Erfurt: Planungsgesellschaft Bahnbau Deutsche Einheit mbH. April 1996. pp. 9, 14 f.
  8. Hommel & Thielmann 2000, pp. 12ff..
  9. Fromm 1993, pp. 75ff..
  10. Fromm 1993, pp. 75ff.
  11. Hommel & Thielmann 2000, pp. 12ff.
  12. Fromm 1993, pp. 41ff..
  13. Information zu den Schienenverkehrsprojekten Deutsche Einheit im Land Thüringen (in German). Planungsgesellschaft Bahnbau Deutsche Einheit mbH. June 1993.
  14. DB 2002, pp. 19–22.
  15. Friedrich List (2008). "Die "Unvollendete" wird doch noch gebaut". Eisenbahn-Kurier (in German) (11): 40–45.
  16. "Hauptbahnhof Erfurt". Renaissance der Bahnhöfe. Die Stadt im 21. Jahrhundert (in German). Vieweg Verlag. 1996. pp. 96 f. ISBN 3-528-08139-2.
  17. "Hamburger siegte mit neuem Entwurf". ZUG (in German) (11): 9. 1995.
  18. "Erfurt erhält ICE-Bahnhof". Eisenbahn-Revue International (in German) (5): 172. 1998. ISSN 1421-2811.
  19. Michael Bernhardt; Reinhard Panhans; Eberhard Krauß (2008). "Eisenbahn Ingenieur Kalender". Sicherungstechnische Modernisierung des Knotens Erfurt (in German). Verband Deutscher Eisenbahn-Ingenieure. pp. 137–155. ISBN 978-3-7771-0359-4.
  20. "Erfurt: Elektronisches Stellwerk in Betrieb". Eisenbahntechnische Rundschau (in German). 48 (5): 255. 1999.
  21. Hermann Schmalfuß; Dieter Thormann (2006). "Die Umgestaltung des Bahnknotens Erfurt". Der Eisenbahningenieur (in German) (5): 7–12.
  22. "ESTW Erfurt in Betrieb". Eisenbahn-Kurier (in German) (321): 14 f. June 2001. ISSN 0170-5288.
  23. "Umbau Erfurt". Eisenbahn-Revue International (in German) (10): 442. 2002. ISSN 1421-2811.
  24. "Fortschritte im Erfurter Hauptbahnhof". Eisenbahn-Revue International (in German) (2): 55. 2006. ISSN 1421-2811.
  25. Timo Götz (19 February 2013). "Zwei Stockwerke für den reibungslosen Zugverkehr". Thüringer Allgemeine (in German) (Erfurt ed.). Retrieved 8 June 2017.
  26. Tino Zippel (12 May 2012). "Bereits 336 Millionen Euro investiert: Bahnknoten Erfurt kurz vor Vollendung". Ostthüringer Zeitung (in German). Retrieved 8 June 2017.
  27. Birgit Kummer. "Ist in Erfurt der Fahrplan gestört, wackelt bundesweit das Bahnnetz". Thüringer Allgemeine (in German) (Apolda ed.). 27 August 2014. p. 11. Retrieved 8 June 2017.
  28. "Tagelange Sperrungen in Leipzig, Halle (Saale) und Erfurt". Eisenbahn-Revue International (in German) (1): 6. 2016. ISSN 1421-2811.
  29. Bernd Jentsch (9 December 2016). "ICE: Im August 2017 startet der Probebetrieb". Thüringer Allgemeine (in German): 3. Retrieved 8 June 2017.
  30. Bärbel Jossunek; Vasco P. Kolmorgen; Alexander Wolf (13 August 2015). Bahnkonzept (ed.). Streckenprospekt NBS Erfurt – Leipzig / Halle. DB Netz; Infrastruktur & Technik; Kundeninformationen (in German). p. 8.
  31. "Auch Deutschland mit ETCS Level 2". Eisenbahn-Revue International (in German) (2): 76–78. 2016. ISSN 1421-2811.

Sources

  • Arbeitskreis Öffentlichkeitsarbeit ICE-Bahnhof Erfurt und Umfeld (ed.). Erfurt verbindet [Erfurt connection] (in German). (multi-part series)
  • Hövelmans, Beate (2009). Freie Bahn. Abriss und Neubau des Erfurter Hauptbahnhofes [Free Railway. Demolition and construction of Erfurt Hauptbahnhof] (in German). Erfurt: Sutton Verlag.
  • Die Bahn baut für Thüringen (in German). Halle/Erfurt: Deutsche Bahn AG. c. 2002.
  • Fromm, Günter (1993). Rockstuhl, Harald (ed.). Aus der Geschichte der Thüringischen Eisenbahn und des Bahnhofs Erfurt [From the history of the Thuringian Railway and Erfurt Railway Station] (in German). Bad Langensalza: self-published.
  • Eisenbahnatlas Deutschland (German railway atlas) (2009/2010 ed.). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  • Hommel, Detlef; Thielmann, Georg (2000). Verkehrsknoten Erfurt [Erfurt rail node] (in German). Freiburg: EK-Verlag. ISBN 978-3-88255-273-7.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.