GBU-53/B StormBreaker

The GBU-53/B StormBreaker, previously known as the Small Diameter Bomb II, is an American air-launched, precision-guided glide bomb.[8]

GBU-53/B StormBreaker
Stormbreaker mockup at Dubai Air Show 2019
TypeBomb
Place of originUnited States
Service history
In serviceSept 2020[1]
Used byUnited States Air Force
United States Navy
Production history
DesignerRaytheon
ManufacturerRaytheon
Unit costUS$195,000[2] (FY 2021)
US$128,771[3](FY15)
US$227,146 inc R&D (FY15)[3]
ProducedJanuary 2014–present[4]
No. built17,143 planned[3]
Specifications
Mass204 lb (93 kg)
Length69 in (176 cm)
Diameter6–7 in (15–18 cm)

Warhead105 lb (48 kg)[5]

Operational
range
69 miles (110 km),[6] 45 miles (72 km) against moving targets[7]
Guidance
system
Millimeter wave Active radar homing / Semi-active laser guidance / Infrared homing (using an uncooled imaging infrared camera) / GPS coupled Inertial guidance / Data-link

Development was started in 2006 for a 250 pounds (113 kg) class bomb that can identify and strike mobile targets from standoff distances in all weather conditions. It will be integrated on the McDonnell Douglas F-15E Strike Eagle, F/A-18 Hornet and F-35 Lightning fighters.[9] Its first flight was announced on May 1, 2009.[10] A contract to start low-rate production LRIP was awarded to Raytheon in June 2015.

A Boeing/Lockheed Martin team attempted to develop it but lost in a U.S. Air Force competition. Boeing won the original competition but the project was on hold for several years due to a corruption scandal involving Darleen Druyun. The competition was reopened in September 2005.[11]

Usage

The bomb can use GPS/INS to guide itself into the general vicinity of a moving target during the initial search phase, with course correction updates provided using a Link 16 over UHF data link. The bomb has three modes of target acquisition: millimeter-wave radar, infrared homing using an uncooled imaging seeker, and semi-active laser homing. The weapon is capable of fusing the information from the sensors to classify the target and can prioritize certain types of targets as desired when used in semi-autonomous mode.

The shaped charge warhead in the bomb has both blast and fragmentation effects, which makes it effective against infantry, armor (including MBTs), unhardened structures and buildings, as well as patrol craft sized boats and other soft targets. The bomb would be the first purpose-built no-drive zone enforcement weapon.

The use of uncooled imaging infrared has been cited as innovative and effective in reducing costs. An important feature of the new weapon is maximizing the number of bombs carried by the strike aircraft. A total of 28 GBU-53/B can be carried by the F-15E Strike Eagle using seven BRU-61/A suspension units, each carrying four bombs. Eight bombs along with two AIM-120 AMRAAM missiles can be carried in the weapons bay of the F-22 Raptor or the F-35 Lightning II (even the STOVL F-35B).[12] The F-35 will not be able to operate the bomb until the aircraft receives the Block 4 software package in 2022. The SDB II bomb rack originally did not fit inside the smaller F-35B weapons bay. A modification will be provided to coincide with the software package.[13] An F-35 can carry 24 total bombs, 8 internally and 16 externally.[14]

Planned deployment

The United States Air Force plans to use the bomb on the F-15E Strike Eagles as a no-drive zone enforcement weapon. The U.S. Navy and U.S. Marines plan to use it on their versions of the F-35 Joint Strike Fighter. Delivery for the first batch is planned for late 2014. Government requirements specify a 2016 delivery date. In October 2020, the Air Force approved the weapon for operational flight on the F-15E.[15]

The Navy plans to first integrate the SDB II onto their F/A-18 Super Hornet jets, then onto the F-35B and C fighters.[16] With the F-35 program experiencing continued delays from a naval perspective, the United States Department of the Navy (DON) has decided to change their integration strategy by using the L3Harris BRU-55 smart multiple carriage racks on F/ A-18 E/F[17] to store and fire the SDB II for the United States Navy.

The L3Harris BRU-55/A smart rack enables the aircraft to carry two MIL-STD-1760 smart weapons, such as the SDB II, on each weapon station. The electronic control assembly and digital communications from the aircraft to the weapon are handled by the BRU-55 canted vertical ejector rack,[17] which in turn is attached to a BRU-32/A bomb ejector rack connected to SUU-79 pylons, and then to the aircraft fuselage.[18] The BRU-55/A is an upgrade, largely on the electronics, to the BRU-33 CVER (Canted Vertical) bomb ejection rack. The BRU-55 was developed as part of the Mk-82 Joint Direct Attack Munition (JDAM) program.[19]

BRU-61 with four GBU-39 Small Diameter Bombs I

Current testing of this configuration will only be performed using the F/A-18 E/F mid-board weapon stations, followed by testing SDB II and BRU-55 on in-board stations. The subsequent step will be to perform testing of the BRU-61/A Type 2 Universal Armament Interface (UAI) pneumatic rack, which will be the primary stores system for the F-35.[20]

For US Navy and United States Marine Corps integration with the F-35B and F-35C, the BRU-61/A will be utilized.[19] The BRU-61/A is a pneumatic Multi-Stores Carriage System produced by Cobham Mission Systems. Each weapon station will be able to carry 4 SDB IIs. The BRU-61/A utilizes pneumatic ejection, which ejects the stores using compressed air, as opposed to previous systems which rely on pyrotechnic cartridges.[21]

History

The original Small Diameter Bomb (SDB) was developed by Boeing and made for non-moving targets. The SDB II is designed to destroy moving targets in dust and bad weather. The Raytheon version was deployed successfully in 26 missions over 21 days. Raytheon was awarded the contract in August, 2010.[22] The North American division of MBDA continues to produce the wings.[23] The Raytheon contract is worth US$450 million. Boeing announced that it would not protest the Raytheon award.

On July 17, 2012 the SDB II successfully engaged and hit a moving target during a flight test at the White Sands Missile Range. The bomb was dropped from an F-15E Strike Eagle, then acquired, tracked, and guided itself onto a moving target using its tri-mode seeker, scoring a direct hit.[24]

In January 2013 four SDB IIs were loaded into the weapons bay of an F-35 Lightning II alongside an AIM-120 AMRAAM missile. The successful fit check validated that the SDB II was compatible with the F-35 and gave adequate clearance in sweeps of inboard and outboard bay doors.[25]

Two SDB IIs successfully conducted live fire tests against moving targets, one in September 2014 and the other in February 2015. Successful live fire tests qualified the weapon for the Air Force to make a Milestone C decision, leading to entering low-rate initial production (LRIP).[26]

The SDB II received Milestone C approval in early May 2015, completing a five-year development program and clearing it for production and deployment with the F-15E. A handful of failed test shots prolonged development from four years to five, but per-unit cost was reduced from the goal of $180,000 to $115,000.[16] Raytheon was awarded a $31 million contract on 12 June 2015 for the first LRIP lot of 144 SDB IIs.[27][28]

Raytheon considered offering the SDB II to the United Kingdom for their Spear Capability 3 requirement to arm the Royal Air Force Eurofighter Typhoon and Royal Navy F-35B.[29] To compete with MBDA's offer of a powered weapon, Raytheon considered a powered SDB II variant.[30] In May 2016, the UK awarded a contract to MBDA to develop the SPEAR 3 missile, confirming it "as the only weapon to meet the UK’s operational requirement" and rejecting the unpowered and shorter-range SDB II.[31]

The Republic of Korea Air Force is considering adopting the SDB II for use on its F-15K aircraft, as the bomb's capability to destroy moving targets more than 60 km away in all kinds of weather is useful to strike North Korean mobile missile launchers.[32] In October 2017, the U.S. approved the sale of 3,900 SDBs to the Royal Australian Air Force for use on their F-35As.[33]

In July 2018, Raytheon announced that the SDB II, recently renamed StormBreaker, had entered operational testing; the weapon had achieved a 90% success rate during developmental testing.[14][34][35] The Air Force planned to declare the SDB II operational in September 2019, but a problem with the bomb's backup fin storage clips, other hardware and software issues, and the COVID-19 pandemic delayed its introduction.[36] The StormBreaker was approved for operational use onboard the F-15E in September 2020.[1]

See also

References

  1. "Small Diameter Bomb II approved for operational use". - Eglin Air Force Base
  2. "Here Is What Each Of The Pentagon's Air-Launched Missiles And Bombs Actually Cost". - The Drive
  3. "GAO-15-342SP Defense acquisitions Assessments of Selected Weapon Programs" (PDF). US Government Accountability Office. March 2015. p. 123. Retrieved 16 July 2015.
  4. "GAO-13-294SP Defense acquisitions Assessments of Selected Weapon Programs" (PDF). US Government Accountability Office. March 2013. pp. 101–2. Retrieved 26 May 2013.
  5. Small Diameter Bomb II Completes Live Fire Test Destroying T-72 Tank – Military, 25 February 2015
  6. "SDB".
  7. "Stormbreaker Smart Weapon".
  8. "GBU-53/B StormBreaker".
  9. "Air Force picks small diameter bomb". United Press International.
  10. "Raytheon GBU-53/B Small Diameter Bomb II Completes First Flight". Space war.
  11. "Raytheon Wins USAs GBU-53 Small Diameter Bomb Competition". Defense Industry Daily.
  12. "Small Diameter Bomb II – GBU-53/B". Defense Update]. Archived from the original on 2015-02-27. Retrieved 2010-08-25.
  13. F-35 Will Not Reach Full Close-Air-Support Potential Until 2022 – DoDBuzz.com, 10 March 2015
  14. US Fighters May Carry StormBreaker Foul-Weather Bomb by Next Year. Defense Tech. 18 July 2018.
  15. "Moving Target: Raytheon's GBU-53 Small Diameter Bomb II". Defense Industry Daily, LLC. 19 October 2020. Retrieved 8 November 2020.
  16. Raytheon’s Small Diameter Bomb II approved for production, deployment – Flightglobal.com, 15 May 2015
  17. "Smart Multiple Carriage Racks". L3Harris Technologies, Inc. 2020. Retrieved 8 November 2020.
  18. "Suspension, arming, and releasing equipment" (PDF). NRTC. pp. 5–6. Retrieved 8 November 2020.
  19. "Department of Defense Fiscal Year (FY) 2021 aircraft Procurement, Navy (BA 6-7)" (pdf). Department of the Navy. February 2020. p. 129. Retrieved 8 November 2020.
  20. "Department of Defense Fiscal Year (FY) 2021 Research & Development, Navy (BA 7-8)" (pdf). Department of the Navy. February 2020. pp. 713–715. Retrieved 8 November 2020.
  21. "BRU-61/A Small Diameter Bomb Carriage System". Cobham Mission Systems. Retrieved 8 November 2020.
  22. "Raytheon wins USA GBU-53/B small diameter bomb competition". Defense Industry Daily.
  23. "MBDA US Division Corporate". Archived from the original on 2011-07-14. Retrieved 2011-07-29.
  24. Small Diameter Bomb II Successfully Hits Moving Target on the Ground – Deagel.com, July 19, 2012
  25. Small Diameter Bomb II Fit Check on F-35 Aircraft – Airforce-Technology.com, January 23, 2013
  26. SDB II undergoes live fire testing on F-15E – Flightglobal.com, 19 February 2015
  27. Raytheon Wins Small Contract For Huge Program: SDB II Exports By 2018 – Breakingdefense.com, 19 June 2015
  28. "Contracts CR-111-15". US Department of Defense. 12 June 2015. Retrieved 2015-07-15.
  29. Raytheon takes aim at UK Spear deal with SDB II – Flightglobal.com, 23 July 2014
  30. Raytheon Considers Powered SDB for UK F-35s – Defensenews.com, 15 June 2015
  31. UK Confirms Development of New Spear Missile for F-35 – Ainonline.com, 19 May 2016
  32. South Korea plans to buy more Taurus missiles after North Korea's new nuclear test – Airrecognition.com, 4 October 2016
  33. US approves sale of 3,900 SDB IIs for Australia F-35s - Flightglobal.com, 4 October 2017
  34. Raytheon awaits F-35 decisions for StormBreaker integration. Flight International. 15 July 2018.
  35. Raytheon's StormBreaker Bomb Being Integrated into F/A-18. Aviation International News. 17 July 2018.
  36. Production of one of the F-35′s most anticipated bombs has been on hold for almost a year. Defense News. 13 June 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.