Hajipur–Muzaffarpur–Samastipur–Barauni section
The Hajipur-Muzaffarpur-Samastipur-Barauni section is a railway line connecting Hajipur to Barauni Via Muzaffarpur, Samastipur the Indian state of Bihar. The 157.37 km (98 mi) line passes through the plains of North Bihar and the Gangetic Plain in Bihar.
Hajipur-Muzaffarpur-Samastipur-Barauni Section | |
---|---|
Overview | |
Status | Operational |
Owner | Indian Railway |
Locale | Bihar |
Termini | Hajipur Barauni |
Stations | 27 |
Service | |
Type | Passenger and Freight Train Line |
Services | |
Operator(s) | Indian Railway, East Central Railway |
Depot(s) | Hajipur and Garhara Yard station in Barauni junction |
Rolling stock | Diesel Locos: WDM-2, WDM-3A, WDS-5, WDP 4 and WDG 4 |
History | |
Opened | 1886 |
Technical | |
Line length | 157.37 km (98 mi) |
Track length | 304 km |
Number of tracks | 1 (electrified Hajipur-Muzaffarpur) 2(electrified Muzaffarpur -Barauni) |
Track gauge | Broad gauge 1,676 mm (5 ft 6 in) |
Electrification | 25 kV 50 Hz AC OHLE (between 2011- December 2014)
|
Operating speed | up to 100 km/ h |
Highest elevation | 57 metres |
References
- "सपना साकार, अब फर्राटे भरेगी विद्युत ट्रेन" [Realizing the dream, now the electric train will fill]. Jagran.com (in Hindi). 22 December 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.