Jinhua–Taizhou railway

The Jinhua–Taizhou railway is a single-track electrified passenger and freight railway in China.

Jinhua–Taizhou railway
金台铁路
Overview
StatusUnder construction
TerminiYongkang South
Taizhou
Service
TypeHeavy rail
Technical
Line length149 km (93 mi)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed160 km/h (99 mph)

History

Construction on the railway began in 2016.[1] It is expected to be finished by the end of 2020.[2]

Infrastructure

From Yongkang South railway station on the Jinhua–Wenzhou high-speed railway, the railway heads east. After Linhai East, the line splits with one branch continuing east to Toumen Port and the other heading south and terminating at Taizhou. The mainline between Yongkang South and Taizhou is 149 km (93 mi) long. The connecting line from Yongkang South to the existing Fengshan freight station on the Jinhua–Wenzhou railway is 11.1 kilometres (6.9 mi) long. The branch to Toumen Port is 42.5 kilometres (26.4 mi) long.[1]

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.