Kiel Canal

The Kiel Canal (German: Nord-Ostsee-Kanal, literally "North-[to]-East [Baltic] Sea canal", formerly known as the Kaiser-Wilhelm-Kanal) is a 98-kilometre-long (61 mi) freshwater canal in the German state of Schleswig-Holstein. The canal was finished in 1895, but later widened, and links the North Sea at Brunsbüttel to the Baltic Sea at Kiel-Holtenau. An average of 250 nautical miles (460 km) is saved by using the Kiel Canal instead of going around the Jutland Peninsula. This not only saves time but also avoids storm-prone seas and having to pass through the Danish straits.

Nord-Ostsee-Kanal
Current map of Kiel Canal in Schleswig-Holstein
Specifications
Length98.26 km (61.06 miles)
Maximum boat length235 metres (771 ft)
Maximum boat beam32.5 metres (107 ft)
Maximum boat draft9.5 metres (31 ft)
History
Construction began1887
Date completed1895 (1895)
Date extended1907–14
Geography
Start pointBrunsbüttel (North Sea)
End pointKiel (Baltic Sea)
Locks at Brunsbüttel connecting the canal to the River Elbe estuary, and thence to the North Sea

Besides its two sea entrances, the Kiel Canal is linked, at Oldenbüttel, to the navigable River Eider by the short Gieselau Canal.[1]

History

The first connection between the North and Baltic Seas was constructed while the area was ruled by Denmark–Norway. It was called the Eider Canal, and used stretches of the Eider River for the link between the two seas. Completed during the reign of Christian VII of Denmark in 1784, the Eiderkanal was a 43-kilometre (27 mi) part of a 175-kilometre (109 mi) waterway from Kiel to the Eider River's mouth at Tönning on the west coast. It was only 29 metres (95 ft) wide with a depth of 3 metres (10 ft), which limited the vessels that could use the canal to 300 tonnes.[2]

After 1864, the Second Schleswig War put Schleswig-Holstein under the government of Prussia (from 1871 the German Empire). A new canal was sought by merchants and by the German navy, which wanted to link its bases in the Baltic and the North Sea without the need to sail around Denmark.[2]

Construction and expansion

In June 1887, construction started at Holtenau (de), near Kiel. The canal took over 9,000 workers eight years to build. On 20 June 1895 Kaiser Wilhelm II officially opened the canal for transiting from Brunsbüttel to Holtenau. The next day a ceremony took place in Holtenau, where Wilhelm II named the waterway the Kaiser Wilhelm Kanal (after his grandfather, Kaiser Wilhelm I), and laid the final stone.[3] British director Birt Acres filmed the opening of the canal; the Science Museum in London preserves surviving footage of this early film.[4] The first vessel to pass through the canal was the aviso SMS Jagd, sent through in late April (before the canal officially opened) to determine if it was ready for use.

The first trans-Atlantic sailing ship to pass through the canal was Lilly, commanded by Johan Pitka. Lilly, a barque, was a wooden sailing ship of about 390 tons, built 1866 in Sunderland, U.K. She had a length of 127.5 feet (38.9 m), beam 28.7 feet (8.7 m), depth of 17.6 feet (5.4 m) and a 32-foot (9.8 m) keel.[5]

In order to cope with the increasing traffic and the demands of the Imperial German Navy, between 1907 and 1914 the canal width was increased. The widening of the canal allowed the passage of a Dreadnought-sized battleship. This meant that such battleships could travel between the Baltic Sea and the North Sea without having to go around Denmark. The enlargement was completed with the installation of two larger canal locks in Brunsbüttel and Holtenau.[6]

The canal as shown in a nautical chart published in 1920

After World War I

After World War I, the Treaty of Versailles required the canal to be open to vessels of commerce and of war of any nation at peace with Germany, while leaving it under German administration.[7] (The United States opposed this proposal to avoid setting a precedent for similar concessions on the Panama Canal.[8]) The government under Adolf Hitler repudiated its international status in 1936, but the canal was reopened to all traffic after World War II.[6] In 1948, the current name was adopted.

The canal was partially closed in March 2013 after two lock gates failed at the western end near Brunsbüttel. Ships larger than 125 metres (410 ft) were forced to navigate via Skagerrak, a 450-kilometre (280 mi) detour. The failure was blamed on neglect and a lack of funding by the German Federal Government, which has been in financial dispute with the state of Schleswig-Holstein regarding the canal. Germany's Transport Ministry promised rapid repairs.[9]

Operation

There are detailed traffic rules for the canal. Each vessel in passage is classified in one of six traffic groups according to its dimensions. Larger ships are obliged to accept pilots and specialised canal helmsmen, in some cases even the assistance of a tugboat. Furthermore, there are regulations regarding the passing of oncoming ships. Larger ships may also be required to moor at the bollards provided at intervals along the canal to allow the passage of oncoming vessels. Special rules apply to pleasure craft.[10]

All permanent, fixed bridges crossing the canal since its construction have a clearance of 42 metres (138 ft).

Maximum length for ships passing the Kiel Canal is 235.50 metres (772.6 ft), with the maximum width (beam) of 32.50 metres (106.6 ft); these ships can have a draught of up to 7.00 metres (22.97 ft). Ships up to a length of 160.00 metres (524.93 ft) may have a draught up to 9.50 metres (31.2 ft).[11] The bulker Ever Leader (deadweight 74001 t) is considered to be the cargo ship that to date has come closest to the overall limits.[12]


View west-southwest from the aft lounge of the cruise ship Norwegian Dream

Crossings

Several railway lines and federal roads (Autobahnen and Bundesstraßen) cross the canal on eleven fixed links. The bridges have a clearance of 42 metres (138 ft) allowing for ship heights up to 40 metres (130 ft). The oldest bridge still in use is the Levensau High Bridge from 1893; however, the bridge will be replaced in the course of a canal expansion already underway.[13][14] In sequence and in the direction of the official kilometre count from west (Brunsbüttel) to east (Holtenau) these crossings are:

Local traffic is also served by 14 ferry lines. Most noteworthy is the “hanging ferry” (German: Schwebefähre) beneath the Rendsburg High Bridge which needs to be replaced after a collision with a ship in 2016. All ferries are run by the Canal Authority and their use is free of charge.[16]

See also

References

  1. Sheffield, Barry (1995). Inland Waterways of Germany. St Ives: Imray Laurie Norie & Wilson. ISBN 0-85288-283-1.
  2. Gollasch, Stephan; Galil, Bella S.; Cohen, Andrew N. (24 Sep 2006). Bridging Divides: Maritime Canals as Invasion Corridors. Springer Science & Business Media. pp. 14–15. ISBN 978-1-4020-5047-3.
  3. "Kiel-Canal History". UCA United Canal Agency GmbH. Archived from the original on 8 July 2015. Retrieved 20 June 2011.
  4. "Opening of the Kiel Canal". Screenonline. Retrieved 2007-03-30.
  5. Pitka, J., Minu Mälestused II, Laevandus, pp 149–156, Tallinn, Ilutrükk, Tartu, 1938.
  6. "Archived copy". Archived from the original on 2016-08-16. Retrieved 2011-06-20.CS1 maint: archived copy as title (link)
  7. Treaty of Versailles, Article 380. Treaty of Versailles/Part XII  via Wikisource.
  8. Platzöder, Renate; Verlaan, Philomène, eds. (1996). The Baltic Sea: New Developments in National Policies and International Cooperation. The Hague: Nijhoff. ISBN 9789041103574.
  9. "Locked Out: Disrepair Forces Closure of Vital Shipping Lane". Der Spiegel. 8 March 2013. Retrieved 11 March 2013.
  10. "Kiel Canal Regulations | Noonsite". www.noonsite.com. Retrieved 2020-02-15.
  11. § 42 Seeschifffahrtsstraßen-Ordnung [ German Traffic Regulations for Navigable Maritime Waterways] of 22 October 1998, BGBl. Part I, p. 3209
  12. "Nord-Ostsee-Kanal nimmt wieder Fahrt auf - Verkehrszahlen im 3.Quartal 2009" [Kiel Canal – traffic figures 3rd quarter 2009] (PDF). www.wsv.de (in German). Wasser- und Schifffahrtsdirektion Nord. 21 October 2009. Early October the largest cargo ship by the combination of length, beam and draught ever transited the Kiel Canal, the Ever Leader (225 m/32.26 m/7.30 m). IMO: 9182186.
  13. "Alte Levensauer Hochbrücke wird neu gebaut" (PDF) (in German). Wasser- und Schifffahrtsamt Kiel-Holtenau. 14 July 2009. Retrieved 1 July 2020.
  14. Behling, Frank (5 October 2018). "Im Frühjahr wird's ernst". Kieler Nachrichten (in German). Retrieved 1 July 2020.
  15. "Fußgängertunnel Nord-Ostsee Kanal in Rendsburg". Wasserstraßen- und Schifffahrtsamt Kiel-Holtenau. Archived from the original on 2017-03-29. Retrieved 2016-12-03.
  16. "Unsere Fähren" (in German). Wasserstraßen- und Schifffahrtsamt Kiel-Holtenau. Retrieved 1 July 2020.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.