Mariveles Coal-Fired Power Plant
Mariveles Coal-Fired Power Plant is a coal power plant in Mariveles, Bataan. The 600-MW facility was connected to the Luzon power grid in 2013.[1] The facility was a joint project of GN Power Mariveles Coal Plant Ltd Co. and AC Energy.[2]
Mariveles Coal-Fired Power Plant | |
---|---|
Country | Philippines |
Location | Mariveles, Bataan |
Coordinates | 14°25′29″N 120°32′12″E |
Status | Operational |
Commission date | 2013 |
Owner(s) | GN Power Mariveles Coal Plant Ltd Co. |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Nameplate capacity | 650 MW |
External links | |
Website | www |
Commons | Related media on Commons |
Two additional units are under construction, both with 600-MW capacity. It is scheduled in early 2016 that the construction of the first unit which will cost P1 billion will commence.[2]
Aboitiz Power Corporation (AP), through their wholly owned subsidiary Therma Power, Inc. acquired 66.1 percent ownership interest. It was completed on December 27, 2016.
References
- Flores, Alena Mae (14 February 2013). "600-MW coal plant connected to the grid". Manila Standard Today. Retrieved 6 December 2015.
- Rivera, Danessa (14 October 2014). "GN Power raising $1 B for Bataan coal power plant". The Philippine Star. Retrieved 6 December 2015.