Nadym River Bridge

The combined single-level bridge over the Nadym River was opened on September 11, 2015. It is located simultaneously on the SurgutSalekhard highway and on the SalekhardNadym – Korotchaevo railway line . It is an element of the Northern Latitudinal Railway that will connect the Arctic with the center of Russia and the Urals .

Nadym River Bridge

Мост через Надым
Coordinates65°33′11″N 72°43′13″E
Carriescombined(Trains, Motor vehicles)
CrossesNadym
LocaleNadym, Yamalo-Nenets Autonomous Okrug, Tyumen Oblast
Characteristics
Total length1334 m
Longest span110 m
History
Opened2015
Location

The total length of the passage is 3.1 km, including the bridge itself (1334 m) and access areas (1770 m). The length of the superstructure is 110 m. The start of construction is 2011, the opening of the road crossing is 2015. The construction of the railway part of the bridge was postponed..[1]

The construction companies that participated in the construction of the bridge are OJSC Mostostroy-11 , CJSC Kurganstalmost , and LLC Urengoydorstroy[2]