Nunobiki Plateau Wind Farm

The Nunobiki Highlands Wind Farm (郡山布引高原風力発電所, Kōriyama Nunobiki Fūryoku-hatsudensho) is a wind farm operated by the electric utility company J-Power alongside Lake Inawashiro in Kōriyama, Fukushima, Japan. It is approximately 1,080 meters above sea level.

Nunobiki Plateau Wind Farm
A view of Mount Bandai from the wind farm
Nunobiki Plateau Wind Farm
Official name郡山布引高原風力発電所
CountryJapan
LocationKōriyama, Fukushima
Coordinates37°20′04″N 140°02′47.9″E
StatusOperational
Commission dateFebruary 2007
Owner(s)J-Power
Operator(s)J-Power
Wind farm
TypeOnshore
Hub height100 m
Rotor diameter30 m
Site elevation
  • 1,080 m (3,540 ft)
Power generation
Make and modelEnercon: E-70
Units under const.33 units
Annual net output65,980 KW
External links
Websitewww.jpower.co.jp/wind/win01000.html
CommonsRelated media on Commons

The wind farm produces 65.98 megawatts of power using a total of 33 type Enercon E-70, wind turbines, and generates enough power for approximately 35,000 houses.[1]

The facility began operating in February 2007. Each wind turbine is about 100 meters high, and each turbine blade is about 30 meters long.

See also

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.