Sadarmat Barrage[1][2][3][4] is an under-construction barrage across Godavari River at Ponkal village, Mamda mandal, Nirmal district of Telangana State. This barrage is situated 32 kms downstream of Sriram Sagar Project, on the Godavari river and about 7 kms upstream of Sadarmat Anicut. The project will provide irrigation facilities for an ayacut of 20,000 acres in Nirmal district of Telangana State.

Sadarmat Barrage
Sadarmat Barrage at Ponkal
Sadarmat Barrage (India)
Official nameSadarmat Barrage
CountryIndia
LocationPonkal village, Mamda mandal, Nirmal district, Telangana
Coordinates18°59′27.9852″N 78°34′16.0104″E
PurposeIrrigation
StatusUnder construction
Construction began11 January 2017
Opening date2021
Construction cost520 Crores
Built byBhrunda Infra Private Limited & Siri Constructions Infrastructure Private Limited (Joint Venture)
Owner(s)Government of Telangana
Operator(s)Irrigation & CAD Department, Government of Telangana
Dam and spillways
Type of damBarrage
ImpoundsGodavari River
Spillways55 gates
Reservoir
CreatesSadarmat Reservoir
Total capacity1.6 TMC

History

In 1891[5] under the rule of Prime Minister of Hyderabad, Viqar-ul-Umra, Sadarmat Anicut was constructed by the french engineer JJ Ottley at Khanapur mandal in the erstwhile Adilabad district. It's a masonry structure with 2 meters height with a length of 437.4 metres on the left flank and 23.8 metres on the right flank. The estimated cost for construction, then, was about 1 Lakh Indian rupees.

The Sadarmat Anicut has no reliable storage and thus agricultural lands can be irrigated only when there are flows from upper stretches of Godavari river. Sadarmat Barrage will create a pondage of 1.6 TMC, which will create additional ayacut of 20,000 acres as well as stabilise the existing ayacut of 18,000 acres under Sadarmat Anicut.

The foundation stone for construction of the barrage was laid by the Irrigation Minister for Telangana, T. Harish Rao with an estimated construction cost of 520 crores on January 11th, 2021.[4]

As part of Sri Ram Sagar Project (SRSP) Rejuvenation Scheme,[6] three house pumps will lift 60 TMC water from the Kaleshwaram Lift Irrigation Project and fill the Sriram Sagar Project project in 69 days, through SRSP Flood Flow Canal. Water from Sriram Sagar Project can be released to Sadarmat Barrage and Sadarmat Anicut via Gravity as it is situated at the downstream of the project. This will provide reliable water supply to ayacut of Sadarmat Barrage and Sadarmat Anicut, even during the drought season in the upper stretches of Godavari.

References

  1. "Govt Moots Sadarmat Mini-barrage in A'bad". The New Indian Express. Retrieved 2021-01-25.
  2. India, The Hans (2019-12-24). "Speed up Sadarmat barrage works: CMO Secretary Smitha Sabharwal". www.thehansindia.com. Retrieved 2021-01-25.
  3. "Implementation of Sadarmatt barrage scheme in Adilabad district - PPP in India". Department of Economic Affairs, Ministry of Finance, Government of India. Retrieved January 25, 2021.
  4. "Laying Foundation Stone For Sadarmatt Barrage :Nirmal - Harish Rao Thanneeru". www.facebook.com. Retrieved 2021-01-25.
  5. Santosh, Padala. "Living up to expectations after 127 years". Telangana Today. Retrieved 2021-01-25.
  6. M, Shyam Kumar. "SRSP rejuvenation works on track". Telangana Today. Retrieved 2021-01-25.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.