Scope creep
Scope creep (also called requirement creep, or kitchen sink syndrome) in project management refers to changes, continuous or uncontrolled growth in a project’s scope, at any point after the project begins.[1] This can occur when the scope of a project is not properly defined, documented, or controlled. It is generally considered harmful.[2] It is related to but distinct from feature creep, because feature creep refers to features, and scope creep refers to the whole project.
Scope creep can be a result of:
- poor change control
- lack of proper initial identification of what is required to bring about the project objectives
- weak project manager or executive sponsor
- poor communication between parties
- lack of initial product versatility
These aspects can affect the operational efficiencies of companies, especially when involved in long-term relationships.[3] Scope creep is a risk in most projects. Most megaprojects fall victim to scope creep (see Megaprojects and Risk). Scope creep often results in cost overrun. A "value for free" strategy is difficult to counteract and remains a difficult challenge for even the most experienced project managers.
See also
References
- Lewis, James (2002). Fundamentals of Project Management (Second ed.). AMACOM. pp. 29, 63. ISBN 0-8144-7132-3.
- Kendrick, Tom (2015). "Chapter 3. Identifying Project Scope Risk". Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project (3rd ed.). AMACOM. pp. 50–52. ISBN 978-0-8144-3609-7.
- Invernizzi, Diletta Colette; Locatelli, Giorgio; Brookes, Naomi J. (2018-07-04). "The need to improve communication about scope changes: frustration as an indicator of operational inefficiencies" (PDF). Production Planning & Control. 29 (9): 729–742. doi:10.1080/09537287.2018.1461949. ISSN 0953-7287. S2CID 116129580.