Shyamsundar railway station
Shyamsundar railway station is a railway station of Bankura–Masagram line under the Adra railway division of South Eastern Railway zone. It is situated beside Bardhaman Road, Palasan at Shyamsundar in Purba Bardhaman district in the Indian state of West Bengal.[1][2]
Shyamsundar railway station | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Indian Railway | |||||||||||
Location | Bardhaman Road, Palasan, Shyamsundar, Purba Bardhaman district, West Bengal India | ||||||||||
Coordinates | 23°04′53″N 87°51′38″E | ||||||||||
Elevation | 30 metres (98 ft) | ||||||||||
Owned by | Indian Railways | ||||||||||
Operated by | South Eastern Railway | ||||||||||
Line(s) | Bankura–Masagram line | ||||||||||
Platforms | 1 | ||||||||||
Tracks | 1 | ||||||||||
Construction | |||||||||||
Structure type | Standard (on-ground station) | ||||||||||
Parking | No | ||||||||||
Other information | |||||||||||
Status | Functioning | ||||||||||
Station code | SHMR | ||||||||||
Division(s) | Adra | ||||||||||
History | |||||||||||
Opened | 1916 | ||||||||||
Closed | 1995 | ||||||||||
Rebuilt | 2005 | ||||||||||
Electrified | 2018–19 | ||||||||||
Previous names | Bankura Damodar Railway | ||||||||||
Services | |||||||||||
|
History
Old narrow-gauge Bankura–Damodar Railway (also called as Bankura Damodar River Railway) connecting Bankura and Rainagar in Bankura and Bardhaman districts was opened to traffic in sections between 1916 and 1917.[3] In 2005, the 118 kilometers long railway section known as Bankura–Masagram line was converted to 1,676 mm (5 ft 6 in) broad gauge.[4] The whole track including Shyamsundar railway station was electrified in 2018–19.[5][6]
References
- roy, Joydeep. "Shyamsundar Railway Station Map/Atlas SER/South Eastern Zone – Railway Enquiry". India Rail Info. Retrieved 2019-07-04.
- "Shyamsunder Railway Station (SHMR) : Station Code, Time Table, Map, Enquiry". NDTV. Retrieved 2019-07-04.
- "Bankura's Iron Horses". Retrieved July 4, 2019.
- "Indian Railway History Time line". Archived from the original on 2012-07-14. Retrieved July 4, 2019.
- "Electrification of Masagram-Bankura stretch to cut travel time". business-standard.com. Retrieved July 4, 2019.
- "Electrification of Railway Track". railnews.in. Retrieved July 4, 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.