Stelco Lake Erie Works
Stelco Lake Erie Works is a greenfield steel mill located in Nanticoke, Ontario, Canada.[4]
Lake Erie Works | |
Stelco Lake Erie Works; image current as of September 3, 2011 | |
Steel | |
---|---|
Greenfield steel mill | |
Location | 2330 Haldimand 3 Nanticoke, Ontario N0A 1L0 |
Serving canal | Welland Canal |
Serving railway | Southern Ontario Railway |
Further ownership |
|
Coordinates | 42.821180°N 80.089445°W |
Construction | |
Completed | June 1, 1980[1] |
Employees | 1250[2] |
Main contractor | Peter Gordon[3] |
References | |
Stelco Lake Erie Works |
All the employees who work for this operation are unionized by United Steelworkers Local 8782; which is a local that is exclusive to the employees of the former Stelco Lake Erie Works.[5] The site has been a source of jobs for many people in both Haldimand County and Norfolk County for more than 30 years. Ever since the first elements of steel were manufactured during the summer of 1980, this steel mill has produced materials for major industrial workplaces like General Motors and the other major North American manufacturing companies. A lockout and resulting lay-off of non-striking workers shut the plant down completely in 2009, with the plant not reopening until near the end of April 2010. Another lockout occurred on April 28, 2012 that finally ended on September 1 of that year with the steelworkers having a contract until 2018.
Summary
In 2017 Bedrock Industries purchased Stelco renaming it to its original name after bringing it out of CCAA status.[6] U.S. Steel Canada purchased Stelco in 2007 for an exact sum figure of $1,100,000,000 ($1,356,331,246.99 in today's money).[7] The merger between the final independent Canadian company and the American steel conglomerate was finalized on August 27 of that year.[8] This operation has a focus on making steel for the automotive sector. As North America's newest greenfield steel mill it is one of the most efficient mills in North America.
Stelco Lake Erie Works was powered by the Nanticoke Generating Station, but since that plant's closure in 2015 and subsequent demolition[9] the plant has been powered by the hydroelectric grid centered around Niagara Falls at the Sir Adam Beck Hydroelectric Power Stations. In 2020 Stelco announced a partnership with DTE Energy to build a 65MW cogeneration on its site using waste heat from its facility to further meet its energy demands.[10]
Lockouts
2009-10 lockout
The drastic move to move all U.S. Steel operations back to the United States ended up costing about 1500 Canadian jobs.[11] Both the Nanticoke Lake Erie Works and its sister Hamilton Works were shut down in 2009 due to lock-out;[12] leaving many people in the area with little or no disposable income to spend on consumer goods and items. A tentative agreement at Lake Erie Works was made on April 8, 2010 after an eight-month lockout[13][14] and a vote ratification was made on April 15, 2010 at 11:15 P.M.[15]
Lake Erie Works finally re-opened after the eight-month lockout on April 23, 2010,[15] re-employing about 1100 people. Approximately 400 people never got their jobs back at Stelco Lake Erie Works simply because they were either too old, moved on to other careers, turned to welfare, or went back to college. Most other local jobs lost during the global recession of the period were eventually restored; resulting in a major drop in the local unemployment rate for the summer of 2010.[16]
2013 lockout
Negotiations to extend the union contract for workers of Stelco Lake Erie Works failed on April 25, 2013. As a result, the company made their official decision to lock out all workers starting on the morning of April 28, 2013.[17] Unlike the previous lockout, failure to accept changes in wage structure was the primary reason for causing the lockout rather than the unhealthy global economy.[18] Stelco Lake Erie Works was very profitable prior to the lockout and was far from being the "bankrupt" company that U.S. Steel wanted to portray the company as to members of the mainstream media.[19]
Reduced vacation time, consolidated pay schedules and the eradication of pay raises consistent with inflation are the secondary reasons behind the lockout. One thousand people are affected by this lockout and are free to seek Employment Insurance at home through the Internet. The parent company (U.S. Steel) offered some information about "getting tough on Canadian labor during a soft economic climate." Haldimand County has been affected by this turn of events because they failed to diversify their mix of industries.[20] Norfolk County, however, has managed to mitigate some of the employment issues by becoming increasingly reliant on the economy of the Greater Toronto Area instead of the industrial muscle of the Hamilton area. Employers from that region have started to use innovative business venture plans from the globalized economy to bring 2600 residents back into the labor force.[21] Even as the lockout reaches the status of a "provincial labor dispute," certain members of the Canadian Parliament have indicated that the motives of U.S. Steel directly violate the Investment Canada Act; which prevents foreign companies from investing beyond a certain size if they do not present a "net benefit to Canada." As of 2010, Canadian policy is to consider over a foreign investment of more than $299 million to be a "significant" amount for the Canadian economy.[22]
Threatening the cost of living allowance with the changing of the base year from 1971 to 2002 was also one of the main reasons that the Stelco Lake Erie Works employees went on lockout.[23] Earning a $45,000 per year paycheck on the 1971 base year for the company's "cost of living allowance" (which would be $287,224.88 in today's money) is more substantial than a yearly paycheck using the 2002 base year for the same plan. The adjusted paycheck with inflation for the 2002 base COLA year would be $60,030 for an entire year of labor. Since the 1970s was a rather inflationary era[24] and the 2000s were an era of light inflation, it helps to consider that the cost of gas rose faster from 1971 to 1980 than it did from 2001 to 2010.
On September 1, 2013, 71% of voting union members acceded to the company's way of thinking and signed a five-year contract that would guarantee work until September 1, 2018. While basic salaries have remained the same, there has been a cut in vacation premiums that allowed them to get paid while on vacation.[25]
References
- Canadian Geographic. June 1980. Missing or empty
|title=
(help) - Steve Arnold (2012-08-24). "U.S. Steel recalls workers, plans hiring blitz". Hamilton Spectator. Retrieved 2013-01-02.
U.S. Steel has recalled all of its laid-off Hamilton workers and is posting plans to hire another 72 staff for its Canadian operations. The good news, however, doesn’t include restarting the Hamilton blast furnace.
- The Hamilton Spectator. "Not a typical steel boss". Retrieved 31 August 2012.
- Lake Erie Steel (11 January 2007). "Profile of Lake Erie Steel". Archived from the original on 14 March 2012. Retrieved 29 March 2012.
- United Steelworkers. "Profile of United Steelworkers Local 8782". Retrieved 31 August 2012.
- "BEDROCK INDUSTRIES COMPLETES ACQUISITION OF STELCO". Stelco. Retrieved 2020-08-14.
- Joe Mandak (August 2007). "U.S. Steel Buying Canada's Stelco For $1B". Manufacturing.net. Retrieved March 1, 2012.
- CBC News (27 August 2007). "Then there were none: Stelco agrees to U.S. Steel takeover". Retrieved 29 March 2012.
- "Media release > Nanticoke powerhouse safely demolished". OPG. Retrieved 2020-08-14.
- "Stelco Announces Selection of Strategic Co-Generation Partner". Stelco. Retrieved 2020-09-03.
- Financial Post (May 06, 2009)
- Toronto Star (March 4, 2009) Archived June 16, 2010, at the Wayback Machine
- U.S. Steel and locked-out workers reach an agreement (April 8, 2010)
- The Global and Mail (14 April 2010). "U.S. Steel, union reach deal to end lockout". Retrieved 29 March 2012.
- Steel Market Update (15 April 2010). "USW Ratifies Contract with U.S. Steel". Archived from the original on 2011-08-09. Retrieved 29 March 2012.
- Daniel Pearce (July 2010). "Major drop in Norfolk unemployment rate". Simcoe Reformer. Archived from the original on 2012-03-25. Retrieved March 1, 2012.
- Jodi L. Koch (U.S. Steel Canada). "Signed Letter of Intent to Lock Out" (PDF). Retrieved 26 April 2013.
- Simon Clarke (U.S. Steel Canada). "Company's final proposal" (PDF). Retrieved 26 April 2013.
- Bill Ferguson (USW 8782). "Who is Trevor Harris Anyway?" (PDF). Retrieved 4 May 2013.
- The Hamilton Spectator. "U.S. Steel locking Nanticoke workers out Sunday". Retrieved 30 April 2013.
- Daniel Pearce (June 2013). "Optimism being felt in Norfolk". Simcoe Reformer. Retrieved June 1, 2013.
- "Thresholds - Investment Canada Act". 2002-12-02.
- U. S. Steel Canada wants fair agreement at The Simcoe Reformer
- Frum, David (2000). How We Got Here: The '70s. New York: Basic Books. pp. 292–293. ISBN 0-465-04195-7.
- Steelworkers head back to work after agreeing to five-year deal with U.S. Steel Archived 2015-09-23 at the Wayback Machine at the Brantford Expositor