Tunnel hole-through

Tunnel hole-through, also called breakthrough, is the time, during the construction of a tunnel built from both ends, when the ends meet,[1] and the accuracy of the survey work becomes evident. Many tunnels report breakthroughs with an error of only a few inches, for example:

Dismantling the tunnel boring machine 10 days after the hole-through on the Gotthard Base Tunnel in Switzerland.

See also

References

  1. "Governor Rockefeller and Mayor Lindsay Attend 'Holing Through' of 63d St. Tunnel". The New York Times. October 11, 1972. Retrieved January 24, 2017.
  2. Lotschberg
  3. "ASCE Metropolitan Section - Holland Tunnel". www.ascemetsection.org. Retrieved 2020-11-21.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.