Çanta Wind Farm

Çanta Wind Farm (Turkish: Çanta Rüzgar Enerji Santrali) is a wind power plant consisting of 19 wind turbines with a total installed capacity of 47.5 MW. The wind farm is situated in Çanta town of Silivri district in Istanbul Province, northwestern Turkey. It went in production by end May 2014.

Çanta Wind Farm
Çanta Wind Farm.
Official nameÇanta Rüzgar Enerji Santrali
CountryTurkey
LocationÇanta, Silivri, Istanbul Province
Coordinates41°06′50″N 28°03′30″E
StatusOperational
Construction began2012
Commission dateMay 31, 2014 (2014-05-31)
Owner(s)Boydak Enerji
Operator(s)Boydak Enerji
Wind farm
Typeonshore
Power generation
Units operational19
Make and modelNordex N100/2500
Nameplate capacity19 X 2.5 MW
Annual net output151 GWh
External links
CommonsRelated media on Commons
Office building of Boydak Energy Co. at the wind farm.

The wind farm was initially projected by Bora Wind Energy Company in 2011. After Boydak Energy Company took over Bora Co., the construction began in 2012. The farm went in production by end May 2014 with six turbines of each 2.5 MW. By end June the same year, eight more turbines increased the total installed capacity to 35 MW.[1][2]

Location

The wind farm is located on a 240 m (790 ft)-high hill northwest of Çanta town,[2] just east of the provincial border between Tekirdağ and Istanbul. It is at a distance of 27 km (17 mi) to Çorlu,[3] 17 km (11 mi) to Silivri and 83 km (52 mi) to Istanbul.

Technical details

Maximum power output of each of the 19 turbines supplied by Nordex in Germany is 2.5 MW,[4] and the total annual energy production is about 151 GWh.[2] The turbines of type N100/2500 have 100 m (330 ft) rotor diameter.[3][5]

Average annual wind speed at the site is given with 7.5–8.5 m/s (25–28 ft/s).[3][4]

See also

  • List of wind farms in Turkey

References

  1. "Boydak Enerji" (in Turkish). Boydak. Retrieved 2015-01-19.
  2. "Çanta Rüzgar Enerji Santrali (RES)" (in Turkish). Enerji Atlası. Retrieved 2015-01-19.
  3. "Nordex liefert 19 Windkraftanlagen in die Türkei" (in German). IWR. 2012-06-04. Retrieved 2015-01-19.
  4. "Çanta RES'in türbinleri Nordex'ten" (in Turkish). Yeşil Ekonomi. 2012-06-06. Retrieved 2015-01-19.
  5. "Rüzgar enerji santralinde montaj hız kazandı" (in Turkish). Makina Market. 2013-09-25. Retrieved 2015-01-19.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.