2027 in rail transport
This article lists events related to rail transport that are currently scheduled to occur in 2027. Please be aware that the actual dates on which these events occur may differ substantially from what is shown here.
Years in rail transport |
Events
Unknown date
- – Expected opening of Semmering Base Tunnel.[1]
- – Calgary Green Line opening.[2]
- – Estimated completion of the Metrolinx Ontario Line in Toronto.[3]
- – Planned service commencement of the Dublin MetroLink.[4]
- – JR Central will start operating the Chūō Shinkansen Maglev between Shinagawa Station (Tokyo) and Nagoya Station (Nagoya).[5]
- – Planned completion of the Yangon Urban Mass Rapid Transit system.[6]
- – Second phase of the Jurong Region MRT line expected to open.[7]
- – Lausanne Metro Line M2 New Lausanne-Gare extension.[8]
- – Lausanne Metro Line M3 opening.[9]
- – Estimated opening of the Chiang Mai light rail transit system.[10]
- – Bangkok Purple Line Southern Extension opening.[11]
- – Altamont Corridor Express services are expected to be extended to Merced.[12][13]
- – Los Angeles Metro Purple Line Extension Phase III is planned to open, extending the D Line to Westwood/VA Hospital.
- – Planned opening of the Los Angeles Metro East San Fernando Valley Transit Corridor.[14]
- – Los Angeles Metro C Line extension to Torrance is planned to be completed under an accelerated schedule.[14]
- – Earliest estimated opening of Tri-Valley-San Joaquin Valley Regional Rail Authority services.[15]
- – Earliest estimated opening of the New York City Subway Second Avenue Subway Phase 2.[16]
References
- "Semmering-Tunnel kommt ein Jahr später". steiermark.orf.at.
- "Green Line Stage One". Calgary Engage. Retrieved June 23, 2020.
- Pelley, Lauren; Crawley, Mike (April 10, 2019). "Doug Ford commits $11.2B for 4 major GTA transit projects, including new 'Ontario Line'". CBC News. Archived from the original on April 10, 2019. Retrieved April 10, 2019.
- "Revealed: Preferred route for €3bn MetroLink from city centre to Dublin Airport unveiled". independent.ie. Independent News & Media. 22 March 2018. Retrieved 30 March 2018.
- Archived November 19, 2011, at the Wayback Machine
- "Mayangone residents oppose transit project". Myanmar Times. 14 January 2020. Retrieved 14 January 2020.
- "Jurong Region Line to open from 2026 in three phases". thenewpaper. Archived from the original on 12 May 2018. Retrieved 12 May 2018.
- Emmanuelle Birraux (24 October 2019). "Lausanne:Le premier tronçon du métro m3 mis à l'enquête" (in French). 24 heures. Archived from the original on 25 October 2019. Retrieved 21 November 2019.
- Etat de Vaud (June 2019). "Développement des métros automatiques m2-m3". www.vd.ch. Retrieved 2019-10-12.
- Jotikasthira, Om (29 July 2018). "Cranking up the train plan". Bangkok Post. Retrieved 29 July 2018.
- Theparat, Chatrudee (30 October 2020). "Tangled lines". Bangkok Post. Retrieved 31 October 2020.
- "ACE expansion report released". Tracy Press. 31 May 2017. Retrieved 2 June 2017.
- Holland, John (27 April 2018). "Expanded train service coming to Modesto, Merced; what it means for commuters". Modesto Bee. Retrieved 28 April 2018.
- Sharp, Steven (27 November 2018). "Here are the 28 Projects that Metro Could Complete Before the 2028 Olympics". Urbanize. Retrieved 2 July 2018.
- "Valley Link Final Feasibility Report" (PDF). Dropbox. Tri-Valley-San Joaquin Valley Regional Rail Authority. Retrieved 17 October 2019.
- "New York City 2nd Ave Subway Phase 2 Profile" (PDF). FTA. December 27, 2016. Archived from the original (PDF) on January 5, 2017. Retrieved January 4, 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.