Aberdeen Tunnel is a two-tube tunnel linking Happy Valley and Wong Chuk Hang near Aberdeen on the Hong Kong Island, Hong Kong. It shortens the travel time between Wong Chuk Hang and Causeway Bay of the Hong Kong Island. It connects the Wong Chuk Hang Road and Canal Road Flyover in the Hong Kong Island. The toll plaza is at the Wong Chuk Hang end.

Aberdeen Tunnel
Inside of northbound bore.
Overview
Other name(s)香港仔隧道
LocationHong Kong Island, Hong Kong
Coordinates22.26086°N 114.18108°E / 22.26086; 114.18108
StatusActive
Route Route 1
StartWong Chuk Hang
EndHappy Valley
Operation
Opened12 March 1982 (1982-03-12)[1]
OwnerHong Kong Link
OperatorTransport Infrastructure Management Ltd.
TrafficVehicular
CharacterLimited-access
TollHK$5
Vehicles per day64,114 (May 2015)[2]
Technical
Length1.9 kilometres (1.2 mi)
No. of lanes4 lanes (2 lanes per direction)
Operating speed70 kilometres per hour (43 mph)
Aberdeen Tunnel
Chinese香港仔隧道
Aberdeen Tunnel, Happy Valley entrance
Toll plaza

The toll is HK$5.[1] The tunnel is 1.9 kilometres (1.2 mi) long[1] and was used by 64,114 vehicles daily in 2015.[2]

Aberdeen Tunnel is currently managed by Transport Infrastructure Management Limited.

History

A tunnel was planned in the long-term development plan for Aberdeen approved by the Governor-in-Council in 1964.[3][4][5] Support for the tunnel grew following the closure of the Wong Nai Chung Gap by landslides.[5] In 1970, Aberdeen kaifong leaders and industrialists called on the government to build the tunnel.[6] A pilot tunnel was dug in the mid-1970s to examine underground rock conditions.[7] Official approval for the full project, comprising the tunnel and the Canal Road flyover extension, was granted in late 1975.[8] The opening of the tunnel was much delayed by both difficult tunneling conditions, and the late arrival of communications equipment from overseas.[9] The contractor was Dragages Hong Kong.[10]

The tunnel opened on 12 March 1982. From the very beginning, the tunnel suffered from congestion at the approach roads.[11][12] In 1991, the toll was raised from $3 to $5.[13]

The Aberdeen Tunnel's operations and management were privatised in 1991. It was contracted out to the Cross Harbour Tunnel Company initially.[14] Tunnel management was contracted out to Serco Group (HK) Ltd. on 29 September 1998, and then to Transport Infrastructure Management Ltd. on 29 September 2014.[2]

Bus routes

As of 2017, there are 46 bus routes passing through the tunnel.

Underground laboratory

The Aberdeen Tunnel Underground Laboratory between the two tunnel tubes was appended by the University of Hong Kong during construction. The laboratory facilitates particle physics research.

Current developments

The South Island line, a new Mass Transit Railway (MTR) link that opened in December 2016, roughly parallels the Aberdeen Tunnel. Upon commissioning, it was expected that 7% of peak hour Aberdeen Tunnel traffic would divert to the new railway.[15]

See also

References

  1. "Transport in Hong Kong - Tunnels and Bridges". Transport Department of the Government of Hong Kong. Retrieved 3 November 2012.
  2. "Table 3.2(b) : Aberdeen Tunnel" (PDF). Monthly Traffic and Transport Digest. Transport Department. May 2015. Retrieved 5 August 2015.
  3. "Aberdeen tunnel planned". South China Morning Post. 30 March 1963. p. 1.
  4. "New Town Centre on Reclaimed Isthmus in Aberdeen". South China Morning Post. 12 April 1963. p. 6.
  5. "Tunnel link 'vital' to Aberdeen". South China Morning Post. 23 July 1971. p. 4.
  6. "Aberdeen wants tunnel to Wanchai". South China Morning Post. 23 April 1970. p. 9.
  7. "Aberdeen tunnel plan gets $2m more". South China Morning Post. 15 January 1975. p. 24.
  8. Choi, Barry (29 October 1975). "Go-ahead for tunnel at Aberdeen, flyover". South China Morning Post. p. 10.
  9. Chugani, Michael (1 February 1982). "Watchdogs monitor Aberdeen Tunnel progress". South China Morning Post. p. 8.
  10. "Aberdeen Tunnel". Dragages Hong Kong Limited. Retrieved 5 August 2015.
  11. Gaffney, Ann (19 March 1982). "Roadblocked by old problems in new tunnel". South China Morning Post. p. 22.
  12. "Drivers delayed at new tunnel". South China Morning Post. 16 March 1982. p. 11.
  13. "Tunnels put tolls up to $5". South China Morning Post. 30 March 1991. p. 3.
  14. Godfrey, Paul (19 February 1992). "Jobs at risk as tunnels go private". South China Morning Post. p. 3.
  15. "LCQ4: Traffic congestion along the link roads to the Aberdeen Tunnel". Legislative Council. 10 June 2009
Preceded by
Wong Chuk Hang Road
Hong Kong Route 1

Aberdeen Tunnel
Succeeded by
Canal Road Flyover
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.