Avenio

Avenio is a low floor tram family produced by Siemens Mobility, a subsidiary of the German conglomerate Siemens.[1] It is the successor to the Combino family. The first generation was sold as the Combino Supra /ˈsprə/, Combino MkII, or Combino Plus. With the introduction of the second generation in 2009 the Combino brand was dropped and Siemens have referred to Combino Plus trams in Almada (Portugal) and Budapest (Hungary) as part of the Avenio range.[2]

Combino Supra 2036 in Budapest

The Avenio is made of stainless steel instead of light materials, and is manufactured at a new assembly line in Vienna. Like the Combino it utilizes a modular design with standardised components, with resulting reduced costs.

Differences between the original Combino and the Combino Supra

Unlike the Combino, the Combino Supra is designed in nine-metre (29 ft 6 in) fixed sections. Each section has a bogie, either powered or unpowered. The length can be anywhere from two sections (18 metres or 59 feet 1 inch) to eight (72 metres or 236 feet 3 inches). In Budapest and Almad, modules are in two-car blocks, each connected by a double articulation joint. In the Combino and other articulated low-floor trams, the modules are suspended between the bogies. Siemens claims the axle load is 10 tonnes (9.8 long tons; 11 short tons) for a width of 2.65 metres (8 ft 8 38 in), such as the Almada.[3]

For Budapest, the length went from nine modules of the Combino to six for the Combino Supra.[4]

The Combino had a half-width door near the driver's cab, where the Combino Supra has a full double-leaf door.

Combino Plus

Budapest

The city transport company of Budapest ordered 40 Combino Supra Budapest NF 12B units for the city's tram network. The six-module trams (three units of two sections) are 53.99 meters long, exceeded only by the 59.4 m CarGoTrams in Dresden, thus making them the longest passenger trams in the world at the time of their introduction. (In 2016 56 meters long CAF Urbos 3 trams entered service in Budapest.) The first two units were delivered on March 14, 2006, and the rest was delivered by the summer of 2007.

In the summer of 2006 problems arose. On August 1, 2006 Budapest mayor Gábor Demszky ordered all six trams to be withdrawn from service until technical problems were cleared up.[5] There were problems with the doors, caused by sensitive fail-safe systems that brought trams to a halt for reasons including luggage or the odd leg getting stuck in a door.[6] Siemens AG reportedly admitted the door problem to be a "design fault".[7]

Another problem was the overhead wires, rebuilt in April and June for the new trams. This was done in a hurry and of poor quality, causing the Ganz trams still running to have problems with their pantographs. On July 15 one traction mast fell to the road on the Margaret Bridge, causing tram services to be suspended between Jászai Mari tér and Moszkva tér till July 25.[8] In the last week of August the overhead was adjusted to prevent new problems from occurring.[9]

The teething problems were eventually sorted out, and all 40 trams were in regular service by the summer of 2007. But Siemens realises further improvements in the ventilation (the vehicles were ordered without air conditioning), and door closing signals will be changed, after inhabitants of the streets passed complained that they are too loud by night.

Almada

Avenio tram in Corroios.

Metro Transportes Sul de Tejo (MST) ordered 24 four-module Combino Plus vehicles for a new light rail system in Almada, south of Lisbon. The first unit was delivered by the end of May 2005, but after the problems with the Combino surfaced the order was converted to stainless steel-bodied Combinos, to be delivered by 2007.

Melbourne

Siemens leased Almada tram C008 to Melbourne's tram network for research and development purposes.[10] It entered service on Grand Prix shuttles on route 96 shuttles on 18 March 2007, before commencing a three-month stint on route 16 the following day, running alongside the classic Combino and other tram models.[11]

Toronto

The Combino Plus was offered by Siemens in August 2007 in its bid to deliver 204 articulated, low-floor vehicles for the Toronto streetcar system as replacements for aging CLRVs and ALRVs, both based on the highly successful PCC design. These three-module units were supposed to be 28 metres in length, have a width of 2.5 metres, and carry 183 passengers. Siemens withdrew their first bid, citing an inability to meet the TTC's 25-percent Canadian content requirement.[12] When tenders were reopened in August 2008, Siemens bid again using the same model, but their price was 50 percent higher than that of Bombardier's locally built Flexity Outlook model, who subsequently won the bid.[12]

Avenio

The Avenio brand was introduced at the UITP 2009 trade fair in Vienna, marketed as the "longest tram in the world" with 100% low floor (referring to the 72 meter version with eight modules).[13][14]

Avenio is based on the Combino Plus but is simplified. There is now one secondary spring which now seemingly can do the work of two. There are more seats over the bogies. There are no more hydraulics and the tram is made of CorTen steel. So in fact it is a completely new design.

Tel Aviv

It was announced that the first production series would go to Tel Aviv in Israel for its upcoming light rail network,[14] but the project was delayed and the construction of the first line, the Red Line, started in September 2011. It will be in operational in 2016-2017 with the majority of stations underground.

The Hague

Avenio 5023 at Lippe Biesterfeldweg (Loosduinen) on Route 2; December 30, 2015

HTM Personenvervoer of The Hague in the Netherlands, the operator of the city's tram network, announced in November 2011 the purchase of 40 Avenio trams. They will be 35 meters long at a width of 2.55 meters with a seating capacity of 70 and a standing capacity of 168.[15] The contract is worth 100 million euro including driver training and spare parts. They are being built in Wien Simmering, with the bogies in Graz.[16] In March 2014 it was announced a further 20 trams were being ordered.[17] The first (5003) entered service on 2 November 2015 on Route 2.

Doha

A consortium led by Siemens is building a tram system for Education City in Doha, the capital of Qatar.[18][19] The opening was scheduled for autumn 2015[19] but has been delayed to 2016.[18] No overhead wires will be installed, since the 10 Avenio trams will be powered by the Siemens Sitras HES system (Hybrid Energy Storage), a combination of a supercapacitor and a traction battery that will be charged at each stop through an overhead conductor rail.[19] The network will have 25 stops on 11.5 km (7.1 mi) of 1,435 mm (4 ft 8 12 in) standard gauge track; the trams are in three modules with a capacity of 238 passengers.[20]

Munich

On 28 September 2012, Münchner Verkehrsgesellschaft (MVG) of Munich, Germany announced an order of 8 Avenio trams for that city's tramway system.[21] They are 36 m long, 2.3 m wide and have 4 modules. The contract was worth approx. 29 million Euros and it is understood that this allows six units to be built ahead of the Den Haag trams. Due to bad management and ongoing problems with the Stadler Variobahns the Avenios were necessary to deliver the advertised service improvements in the new timetable effective December 2013. They were supposed to be fully operational in little more than a year, however the first entered service on 17 September 2014 on Route 19.[22]

Copenhagen

29 Avenios will operate Hovedstadens Letbane (Greater Copenhagen Light Rail) from its opening in 2025.[23]

See also

References

  1. "Avenio - The new generation of trams from Siemens". Siemens. 30 March 2009. Archived from the original on 25 September 2009. Retrieved 19 April 2009.
  2. "Avenio - The new generation of trams from Siemens promotional sheet" (PDF). Siemens. 30 March 2009. Archived from the original (PDF) on 22 February 2014. Retrieved 19 April 2009. Take, for example, the 24 vehicles near Lisbon, Portugal and the 40 in Budapest, the capital of Hungary, where the longest low-floor trams in the world, namely 54-m-long Avenio vehicles, are in service today. "Archived copy" (PDF). Archived from the original (PDF) on 22 February 2014. Retrieved 19 April 2009.CS1 maint: archived copy as title (link)
  3. Siemens Combino Plus website - 'Flexibility' Archived January 25, 2008, at the Wayback Machine
  4. Combino Budapest Reference brochure Archived July 16, 2011, at the Wayback Machine
  5. Caboodle.hu - Budapest mayor calls for withdrawal of faulty Combino trams Archived September 27, 2007, at the Wayback Machine
  6. The Budapest Sun Online - Mayor touts Budapest as leading regional capital Archived June 5, 2011, at the Wayback Machine
  7. Caboodle.hu - New Combino tram fails shortly after resuming service Archived September 27, 2007, at the Wayback Machine
  8. Railway Market Magazine - Public Transport in Hungary: Combino-Teething Troubles in Budapest Archived September 27, 2007, at the Wayback Machine
  9. Caboodle.hu - Tram service suspended every evening until September Archived September 27, 2007, at the Wayback Machine
  10. Australia Combino Plus Siemens March 29, 2007
  11. "Lisbon demonstrator arrives in Melbourne" Trolley Wire issue 308 February 2007 pages 14/15
  12. Bow, James. "The Toronto Flexity Light Rail Vehicles (LRVs)". Transit Toronto. Retrieved 5 March 2016.
  13. "Kapazität auf höchstem Niveau" (in German). Siemens.
  14. "Die längste Niederflurstraßenbahn der Welt: Siemens stellt Avenio vor" (in German). Siemens. 30 March 2009.
  15. Siemens Avenio, de nieuwe Haagse tram Archived 2012-08-02 at Archive.today auf htmfoto.net, aufgerufen am 20. November 2011.
  16. Premiere: Siemens erhält ersten Auftrag für die neue Straßenbahn-Generation Avenio – Den Haag bestellt 40 Fahrzeuge im Wert von über 100 Millionen Euro Werkstattatlas.info, aufgerufen am 20. November 2011.
  17. "Den Haag bestelt 20 extra trams voor 55 miljoen" (in Dutch). De Volkskrant. 11 March 2014.
  18. "Qatar's first Education City tram rolls out". Railway Gazette International. 11 March 2015.
  19. Qatar Foundation to get turnkey tram system from Siemens Siemens website, 30 July 2012
  20. "Bahnen auf dem neuesten Stand". Elektrische Bahnen (in German). 2012.
  21. "SWM/MVG bestellen 8 zusätzliche Tramzüge" (PDF) (in German). Münchner Verkehrsgesellschaft. 28 September 2012. Archived from the original (PDF) on 14 November 2012.
  22. "First Siemens Avenio tram enters passenger service". Railway Gazette International. 17 September 2014.
  23. https://www.dinletbane.dk/in-english/stations-and-trains/
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.