Dasmariñas–Las Piñas Transmission Line
The Dasmariñas–Las Piñas Transmission Line (abbreviated as 8LI1DAS-LPI and 8LI2DAS-LPI) is a 230,000 volt, double-circuit transmission line in Metro Manila and Calabarzon, Philippines that connects Dasmariñas and Las Piñas substations of National Grid Corporation of the Philippines (NGCP).
Dasmariñas–Las Piñas Transmission Line | |
---|---|
![]() | |
Location | |
Country | Philippines |
Province | Cavite Metro Manila |
Coordinates | 14°18′41″N 120°57′9″E 14°28′38″N 120°58′25″E |
From | Dasmariñas Substation |
To | Las Piñas Substation |
Ownership information | |
Owner | National Power Corporation (2001–2003) National Transmission Corporation (2003–present) |
Operator | National Power Corporation (2001–2003) National Transmission Corporation (2003–2009) National Grid Corporation of the Philippines (2009–present)[lower-alpha 1] |
Construction information | |
Commissioned | November 30, 2001 |
Technical information | |
Type | Overhead transmission line |
Type of current | HVAC |
No. of transmission towers | 210 (209 steel poles and 1 lattice tower) |
AC voltage | 230 kV |
No. of poles | 209 |
No. of circuits | 2 |
Route description
_-_Flickr.jpg.webp)
The Dasmariñas–Las Piñas Transmission Line went into service on November 30, 2001.[1] Originally commissioned by the government-owned National Power Corporation (NAPOCOR), it is now operated and maintained by privately owned National Grid Corporation of the Philippines (NGCP). The power line passes through the cities of Dasmariñas, Imus, and Bacoor in Cavite, and Las Piñas in Metro Manila. It is located within the service area of NGCP's South Luzon Operations and Maintenance (SLOM) District 1 (South Western Tagalog).
The transmission line starts at Dasmariñas substation, turns left into Ramon Tirona Avenue, and run parallel with Aguinaldo Highway until Bacoor. Upon approaching Bacoor Junction, it will parallel with Aguinaldo Boulevard until Bacoor Exit of Manila-Cavite Expressway (CAVITEX). It then utilize the eastern side of CAVITEX until its terminus at Las Piñas substation.
Statistics
The transmission line consists of 209 steel poles (1–209) and 1 lattice tower (208A).
Expansion and improvements
In order to protect the steel poles from corrosion, several poles are being painted with aluminum paint.
In 2016, NGCP constructed lattice tower 208A that connects to 3rd 300 MVA transformer at Las Piñas Substation on a location where a water tower was once located.
Notes
- As stated on High Voltage sign placed on tower 208A.
References
- "Project Completion Report on the Power Transmission project (Loan 1288-PHI) to the Philippines (December 2002)" (PDF). www.adb.org. Retrieved August 3, 2020.