Dukovany Nuclear Power Station

The Dukovany Nuclear Power Station is a nuclear power plant near Dukovany, a village in the Czech Republic.

Dukovany Nuclear Power Station
Dukovany Nuclear Power Station
CountryCzech Republic
Coordinates49°05′06″N 16°08′56″E
StatusOperational
Construction began1974
Commission date
  • 1985
Construction costKčs 25 billion
Owner(s)
Operator(s)CEZ Group
Nuclear power station
Reactor typeVVER-440
Power generation
Units operational4 x 505 MW
Nameplate capacity2020 MW
Capacity factor84.7%
Annual net output14,990 GW·h
External links
WebsiteThe Dukovany Nuclear Power Station
CommonsRelated media on Commons

It was the second nuclear power plant in Czechoslovakia (the Bohunice Nuclear Power Plant in what is now Slovakia was constructed in 1958), and the first one in what is now the Czech Republic. It is situated 30 kilometres (19 mi) from the city of Třebíč, near the Dalešice Reservoir, where the plant sources its water supply. In 1970 Czechoslovakia and the Soviet Union ratified a contract for construction of two nuclear power plants. Actual construction work began four years later. From 1985 to 1987, four power units with pressurized water reactors were commissioned. All four are still in operation.

Dukovany nuclear power plant supplies approximately 14 TWh of electric energy annually to the national power network.[1] The plant is owned and operated by CEZ Group. The power plant modernisation will successively be carried out to the end of its planned service life.[1]

Plant characteristics

The plant has four reactors. As of December 31, 2011 CEZ reported turbine generator output (gross capacity) as listed below. Net capacity is a baseline estimate only.

Unit Type Net capacity Gross capacity Initial criticality Grid date
1VVER-440/213471 MWe505 MWeFeb 1985Aug 1985
2VVER-440/213471 MWe505 MWeJan 1986Sep 1986
3VVER-440/213471 MWe505 MWeOct 1986May 1987
4VVER-440/213471 MWe505 MWeJun 1987Dec 1987

In 2005, Unit 3 was upgraded to 456 MWe gross capacity, and the same upgrade was made to Unit 1 and Unit 4 in 2007. Unit 3 was further upgraded in 2009 to 500MWe. In total an extra 240 MWe of capacity has been or will be added before 2013 in a comprehensive program of improvements including steam plant replacement, addition of instrumentation and fuel changes.

The reactors are fuelled by uranium dioxide UO2. Fuel is placed in the reactor in 312 fuel assemblies. Each assembly consists of 126 fuel rods with a hermetically sealed fuel.

Dukovany Nuclear Power Station has 8 cooling towers, each 125 metres tall.

West of the facility there is a 136 metre tall guyed tower for monitoring air radioactivity.

In 1994, a visitor information centre was opened at the site.

Power distribution

The power lines leaving Dukovany Nuclear Power Station are mainly installed on delta type pylons. They run to Slavetice substation situated at 49°6'15" N and 16°7'10" E. At this substation the powerline to Dürnrohr in Austria starts.

Plant owner CEZ plans to install a district heating circuit to supply heat to homes and businesses in Brno. A pipeline over 40 kilometres in length could be installed after regional officials have considered CEZ's environmental impact statement for the project, submitted in July 2010.

Replacement

In 2019 the Czech government gave preliminary approval for at least one new nuclear power unit for about 2035 to replace the four units expected to shut down between 2035 and 2037. The financial model proposed is a state guarantee so finance can be obtained at government interest rates, but no subsidy on operating costs or above market-price electricity rates.[2] In January 2021 Chinese companies were excluded from bidding for political and security reasons, following advice from the security services of EU and NATO member states. Russia's Rosatom was not excluded.[3]

The Dukovany reactor complex appears in the video game Tom Clancy's EndWar as a potential battlefield.[4]

See also

References

  1. "The Dukovany Nuclear Power Station". cez.cz. Retrieved 2017-02-11.
  2. "Czech state to back new nuclear units". World Nuclear News. 9 July 2019. Retrieved 10 July 2019.
  3. "Czech Republic excludes China from Dukovany tender". Nuclear Engineering International. 1 February 2021. Retrieved 1 February 2021.
  4. Ubisoft (2008). "Locations". Ubisoft. Retrieved 1 April 2011.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.