INS Arihant

INS Arihant (SSBN 80)[7] (Sanskrit: Vanquisher of Enemies), designated S2 Strategic Strike Nuclear Submarine,[8] is the lead ship of India's Arihant class of nuclear-powered ballistic missile submarines.[9][10] The 6,000 tonne vessel was built under the Advanced Technology Vessel (ATV) project at the Ship Building Centre in the port city of Visakhapatnam.[11][12]

INS Arihant
History
India
Name: INS Arihant
Builder: Shipbuilding Centre (SBC), Visakhapatnam, India
Launched: 26 July 2009
Acquired: 13 December 2014
Commissioned: August 2016[1]
Homeport: Visakhapatnam
Status: in active service[2]
General characteristics
Class and type: Arihant-class ballistic missile submarine
Displacement: surface: 6,000 tonne (estimated) [3]
Length: 111 m (364 ft)[4]
Beam: 15 m (49 ft)[4]
Draft: 11 m (36 ft)[4]
Propulsion: PWR using 40% enriched uranium fuel (83 MWe);[4] one turbine (47,000 hp/70 MW); one shaft; one 7-bladed, high-skew propeller (estimated)
Speed:
  • Submerged: 24 knots (44 km/h; 28 mph)[5]
  • Surfaced: 15 knots (28 km/h; 17 mph)
Range: unlimited except by food supplies
Test depth: 350 m (1,150 ft) (estimated)[6]
Complement: 95–100 officers and men
Sensors and
processing systems:
  • USHUS sonar
  • Panchendriya unified submarine sonar, control system and underwater communication system [5]
Armament:

Arihant was launched on 26 July 2009, the anniversary of Vijay Diwas (Kargil War Victory Day) by then Prime Minister of India, Dr Manmohan Singh. After fitting out and extensive sea trials, on 23 February 2016, she was confirmed as ready for operations,[13][14] and was commissioned in August 2016.[1]

Design

INS Arihant is to be the first of the expected five in the class of submarines designed and constructed as a part of the Indian Navy's secretive Advanced Technology Vessel (ATV) project. The Arihant-class submarines are reported to be based on the Akula-class submarine.[15] Their crew will have the opportunity to train on INS Chakra, an Akula-class submarine, which the Indian Navy leased from Russia.[16][17] Arihant will be more of "a technology demonstrator", rather than a fully operational SSBN according to Admiral Nirmal Verma.[18]

The vessel will be powered by an 83 MW pressurised light-water reactor[19] with enriched uranium fuel.[20] A land-based prototype of the reactor was first built at Kalpakkam and made operational in September 2006. Successful operation over a period of three years yielded the data that enabled the production version for Arihant.[21][22] It was reported that an 80 MW nuclear reactor was integrated into the hull of the ATV in January 2008.[23]

The hull for the vessel was built by L&T's Hazira shipbuilding facility. Tata Power Strategic Engineering Division (SED) built the control systems for the submarine. The systems for the steam turbine integrated with the reactor are supplied by Walchandnagar Industries.[24] The consultancy for this project was provided by Russia.[25] Russia was also reported to have provided assistance to Bhabha Atomic Research Centre (BARC) scientists in miniaturising the reactor to fit into the hull of the nuclear submarine[26]

Armament

Conceptual drawing of INS Arihant

Arihant has four vertical launch tubes, which can carry 12 (three per launch tube) smaller K-15 missiles or four larger K-4 missiles. The K-4 has a longer range of 3,500 km (2,200 mi) and has commenced trials.[27][28][29]

Launch

INS Arihant was introduced to the public on 26 July 2009 at a symbolic launch ceremony by Prime Minister Manmohan Singh's wife Gursharan Kaur.[30] The launch coincided with the 10th anniversary of the conclusion of the Kargil War[31] and consisted of floating the vessel by flooding the dry dock. Defence Professionals Daily claimed Arihant was launched without key systems including its nuclear reactor, surveillance equipment, and ordnance. As per naval tradition, Gursharan Kaur cracked a coconut on the hull to mark the launch of the submarine at the secret naval base in Visakhapatnam.[32] Photography was prohibited and photos showing the complete vessel are not available.[33][34] In his address to the crowd, Prime Minister Singh billed the submarine as an outcome of a public-private partnership. He also thanked Russia in his address, stating, "I would also like to express our appreciation to our Russian friends for their consistent and invaluable cooperation, which symbolises the close strategic partnership that we enjoy with Russia".[35] The launch of Arihant strengthens India's endeavour to build a credible nuclear triad – the capability to fire nuclear weapons from air, land and sea.

Development phases

On the condition of anonymity, a nuclear scientist familiar with the project echoed this report in response to the media coverage that India had successfully launched a completed nuclear submarine.[36] It was also expected that the duplication of India's land based reactor, integration of systems, and sea trials are expected to take three to five years.[37]

Admiral Verma told reporters on 7 August 2012 that sea trials of Arihant are commencing in coming months and she is steadily progressing towards operationalisation.[38] On 27 January 2013, Sagarika, the primary armament of Arihant, completed its final developmental test and was later integrated with the submarine.[39] On 10 August 2013, the nuclear reactor of the submarine went critical;[19] this was done after several months of system checks using shore-based high-pressure steam.[19][40] The reactor's power was raised in increments of 5 to 10% until it reached full power.

Sea and weapons trials

K-15 Sagarika SLBM

On 13 December 2014, Arihant sailed north along the Bay of Bengal coast off for its extensive sea trials.[41] The sea trials included the firing of the indigenous submarine-launched Sagarika ballistic missile.[42]

On 25 November 2015, a dummy or unarmed Sagarika missile was successfully test fired from Arihant.[43] The submarine then underwent further extensive sea trials, which were completed by early February 2016. Though it had initially been expected Arihant would be commissioned in time to participate in the International Fleet Review 2016, her participation was subsequently ruled out due to security concerns. On 23 February, Arihant was officially confirmed as ready for operations.[14]

According to The Economic Times, several weapons trials of INS Arihant have been undertaken secretly.[8]

Operational history

PM Modi addressing the crew of Arihant after its first patrol

In August 2016, Prime Minister Narendra Modi commissioned INS Arihant into the Indian Navy.[1][2]

In January 2018, it was reported that hatch on the rear side of the submarine was left open by mistake while the Arihant was at harbor in 2017 lead to saltwater flooding the propulsion area while the submarine was docked, rendering it inoperative for ten months while pipes were replaced.[44][45][46]

First deterrence patrol

It was announced on 5 November 2018 that INS Arihant had completed its first deterrent patrol.[47] The 20 day long patrol ended on 4 November 2018.[48] PM Narendra Modi felicitated the crew of Arihant after the patrol.[49] This marked the completion of India's nuclear triad.[50]

See also

References

[51]

  1. "Now, India has a nuclear triad". The Hindu. Archived from the original on 24 September 2015. Retrieved 17 October 2016.
  2. Singh, Ashish (17 October 2016). "NewsX Exclusive: India completes 'nuclear triad' with INS Arihant". NewsX. Archived from the original on 18 October 2016. Retrieved 17 October 2016.
  3. "India to Construct Two More Arihant Nuclear Submarines for Navy". DefenceNow. Archived from the original on 12 July 2015. Retrieved 2 June 2015.
  4. Subramanian, T.S. (15 August 2009). "Nuclear Arm". The Frontline. Vol. 26 no. 17. Archived from the original on 26 May 2013. Retrieved 2 June 2015.
  5. "Retrieved on 2016-10-21". Archived from the original on 2 May 2013. Retrieved 29 December 2012.
  6. "20 years after Pokhran II, India makes giant nuclear leap". Hindustan Times. 6 November 2018. Archived from the original on 26 November 2018. Retrieved 15 September 2019.
  7. "INS Arihant completes India's nuclear triad, PM Modi felicitates crew". The Economic Times. 6 November 2018. Archived from the original on 26 May 2019. Retrieved 30 June 2019.
  8. "INS Arihant: What India's new nuclear submarine could mean for the world - Times of India". indiatimes.com. Archived from the original on 28 June 2016. Retrieved 24 August 2016.
  9. "India Nears Completion Of Nuclear Triad With Armed Submarine". ndtv.com. Archived from the original on 13 December 2016. Retrieved 24 August 2016.
  10. Unnithan, Sandeep; December 10; December 18, 2017 ISSUE DATE; November 5, 2017UPDATED; Ist, 2018 15:09. "From India Today magazine: A peek into India's top secret and costliest defence project, nuclear submarines". India Today. Retrieved 29 June 2019.CS1 maint: numeric names: authors list (link)
  11. Anandan, S. (20 December 2014). "INS Arihant may be of limited utility". The Hindu. ISSN 0971-751X. Retrieved 30 June 2019.
  12. "INS Arihant not to feature at International Fleet Review: Indian Navy chief - The Economic Times". The Economic Times. Archived from the original on 9 February 2016. Retrieved 5 February 2016.
  13. "India's first nuclear submarine INS Arihant ready or operations, passes deep sea tests - The Economic Times". The Economic Times. Archived from the original on 24 February 2016. Retrieved 23 February 2016.
  14. "SSBN Arihant Class Submarine, India". naval-technology.com. Archived from the original on 2 May 2013. Retrieved 2 June 2015.
  15. "Arihant – Advanced Technology Vessel (ATV)". Global Security. Archived from the original on 26 December 2010. Retrieved 2 June 2015.
  16. "Leased Russian n-submarine to set sail for India this month end". indiatoday. 15 December 2011. Archived from the original on 5 January 2012. Retrieved 2 June 2015.
  17. Pandit, Rajat (3 December 2009). "Home-made nuke sub INS Arihant to be inducted in 2 years". The Times of India. Archived from the original on 13 June 2016. Retrieved 2 June 2015.
  18. Pandit, Rajat (10 August 2013). "Reactor of India's first indigenous nuclear submarine INS Arihant goes 'critical'". The Times of India. Archived from the original on 17 January 2016. Retrieved 2 June 2015.
  19. Pandit, Rajat (17 July 2009). "India set to launch nuclear-powered submarine". The Times of India. Archived from the original on 13 June 2016. Retrieved 2 June 2015.
  20. Subramanian, T.S. (2 August 2009). "PWR building shows indigenous capability, says Kakodkar". The Hindu. Chennai, India. Archived from the original on 8 August 2009. Retrieved 2 August 2009.
  21. Venkatesh, MR (2 August 2009). "Arihant propulsion reactor unveiled". Hindustan Times. Retrieved 2 June 2015.
  22. "The secret undersea weapon". indiatoday. 17 January 2008. Retrieved 2 June 2015.
  23. Joseph, Josy (27 July 2009). "Private sector played a major role in Arihant – India – DNA". Daily News and Analysis. Archived from the original on 16 September 2012. Retrieved 2 June 2015.
  24. Bagla, Pallava (3 August 2009). "Russians helped with INS Arihant's heart: Kakodkar". NDTV. Archived from the original on 20 December 2014. Retrieved 2 June 2015.
  25. Malhotra, Jyoti (12 August 2013). "How India's pride INS Arihant was built". Business Standard. Archived from the original on 11 February 2017. Retrieved 2 June 2015.
  26. Subramanian, T.S. (8 May 2014). "Success on debut for undersea launch of missile". The Hindu. Archived from the original on 29 November 2014. Retrieved 2 June 2015.
  27. "India tests new underwater nuclear missile". The Times of India. 26 March 2014. Archived from the original on 1 May 2015. Retrieved 2 June 2015.
  28. Thapar, Vishal (10 May 2014). "India tests 3,000 km range n-missile in secret". The Sunday Guardian. Archived from the original on 20 May 2015. Retrieved 2 June 2015.
  29. "Wife of Indian PM launches home-made nuclear attack submarine". Xinhuanet. 26 July 2009. Archived from the original on 4 March 2016. Retrieved 2 June 2015.
  30. Unnithan, Sandeep (16 July 2009). "Exclusive: PM's wife to launch INS Arihant, India's first nuclear submarine". indiatoday. Archived from the original on 25 July 2009. Retrieved 2 June 2015.
  31. "India inducts nuke submarine into navy". The Hindu. Chennai, India. 26 July 2009. Archived from the original on 29 July 2009. Retrieved 10 September 2009.
  32. "PIB's Latest Photograph". Pib.nic.in. Archived from the original on 4 August 2009. Retrieved 17 August 2009.
  33. "PIB's Latest Photograph". Pib.nic.in. Archived from the original on 17 July 2011. Retrieved 17 August 2009.
  34. Singh, Harmeet Shah (26 July 2009). "India launches nuclear submarine". CNN. Archived from the original on 19 August 2009. Retrieved 17 August 2009.
  35. Jayaraman, KS (13 August 2009). "India's Nuclear Sub Doesn't Have Working Reactor Yet". Daiji World. Archived from the original on 23 September 2015. Retrieved 2 June 2015.
  36. Von Kospoth, Nicolas (28 July 2009). "India's INS Arihant Makes First Contact with Water". Defense Professionals Daily. Archived from the original on 5 September 2009. Retrieved 10 September 2009.
  37. "India's first home-built nuclear submarine INS Arihant set for trials". 7 August 2012.
  38. Mallikarjun, Y.; Subramanian, T. S. (27 January 2013). "India successfully test-fires underwater missile". The Hindu. Chennai, India. Archived from the original on 24 November 2016. Retrieved 2 June 2015.
  39. "Arihant achieves criticality when the boat was "already in the sea"". Jagran Josh. 11 August 2013. Archived from the original on 30 October 2014. Retrieved 2 June 2015.
  40. "India's nuclear submarine Arihant flagged off for sea trials". Economic Times. 13 December 2014. Archived from the original on 13 June 2016. Retrieved 2 June 2015.
  41. "Indigenous n-sub's sea trials by year-end". Business Standard. Indo-Asian News Service. 2 November 2014. Archived from the original on 10 March 2019. Retrieved 9 March 2019.
  42. Luthra, Gulshan (26 November 2015). "Nuclear capable Arihant submarine successfully test-fires unarmed missile". The Economic Times. Retrieved 26 November 2015.
  43. "India Learned One Way How to Sink a $3 Billion Dollar Submarine: Leave a Hatch Open". The National Interest. Retrieved 25 December 2020.
  44. Peri, Dinakar; Joseph, Josy (8 January 2018). "INS Arihant left crippled after 'accident' 10 months ago". The Hindu. Archived from the original on 17 May 2019. Retrieved 29 January 2019.
  45. Pubby, Manu (8 January 2018). "India's only nuclear-armed submarine is back in the water after contamination fears". The Print. Archived from the original on 6 March 2019. Retrieved 5 March 2019.
  46. Siddiqui, Huma (5 November 2018). "INS Arihant: India's first indigenous nuclear-powered submarine completes Nuclear Triad; PM Modi hails crew; top things to know". The Financial Express. Archived from the original on 5 November 2018. Retrieved 5 November 2018.
  47. Unnithan, Sandeep (5 November 2018). "INS Arihant returned yesterday from 20-day deterrent patrol". India Today. Retrieved 13 October 2019.
  48. "Prime Minister felicitates crew of INS Arihant on completion of Nuclear Triad". Press Information Bureau, Government of India. 5 November 2018. Retrieved 17 September 2019.
  49. "India's nuclear triad is complete with INS Arihant ending its first deterrence patrol". The Hindu. Special Correspondent. 5 November 2018. ISSN 0971-751X. Retrieved 4 September 2019.CS1 maint: others (link)
  50. Vibhaas, Sane (18 October 2016). "Nuclear Submarine INS Arihant Inducted 'Quietly' In Indian Navy (Land, Air, and Water)" Archived 19 October 2016 at the Wayback Machine, Dainik Bhaskar. Retrieved on 18 October 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.