Italian offshore patrol vessel Marcantonio Colonna

Marcantonio Colonna (P433) is the fourth ship of Paolo Thaon di Revel-class offshore patrol vessel.

History
Italy
Name: Marcantonio Colonna
Namesake: Marcantonio Colonna
Ordered: 2014
Builder: Fincantieri, Muggiano
Cost: €3.9 billion
Laid down: 14 March 2019
Launched: Expected, September 2021
Commissioned: Expected, April 2024
Identification: Pennant number: P433
Status: Under construction
General characteristics
Class and type: Thaon di Revel-class offshore patrol vessel
Displacement:
  • light displacement: 4.994 t (4.915 long tons)
  • full displacement: 6.270 t (6.171 long tons)
Length:
  • 143 m (469 ft 2 in) LOA
  • 133 m (436 ft 4 in) LPP
Beam: 16.5 m (54 ft 2 in)
Draught: 10.5 m (34 ft 5 in)
Depth: 5 m (16 ft 5 in)
Propulsion:
Speed:
Range: 5,000 nmi (9,300 km; 5,800 mi) at 15 knots (28 km/h; 17 mph)
Complement: 173 beds (+ 30 on modular rear zone)
Crew:

PPA Full 120 crew;PPA Light+ + 90;PPA Light 90;(

add 24 crew for two helos on board and other 89/59 beds for optional boarding team, marines team, maritime command staffs, etc.)
Sensors and
processing systems:
Electronic warfare
& decoys:
  • Elettronica-ELT Spa ZEUS System
  • RESM (Radar Electronic Support Counter-Measure)
  • RECM (Radar Electronic Counter-Measure)
  • CESM (Communication ESM)
  • 2 x Oto Melara ODLS-20 decoy launchers
Armament:
Aircraft carried:
Aviation facilities:
  • - double hangar
  • - flight deck 25.5 m (83 ft 8 in) x 16.5 m (54 ft 2 in)

Development and design

Italian Navy ordered the new MBDA TESEO MK/2E heavy-duty missile (TESEO "EVO"), a long-range anti-ship missilewith also strategic land attack capability. The missile will have a new terminal "head" with dual RF seeker (Radio Frequency) and, presumably, date the need to even attack ground targets, IIR (Imaging IR). Compared to the predecessor OTOMAT/TESEO, the TESEO "EVO" MK/2E has a double range or more than 360 km. Former OTOMAT is accredited for a range of action of more than 180 km.[1][2][3]

Construction and career

Marcantonio Colonna was laid down on 14 March 2019 at Fincantieri Muggiano and expected to be launched in September 2021.[4] Expected to be commissioned in April 2024.