M6 heavy tank

The Heavy Tank M6 was an American heavy tank designed during World War II. The tank was produced in small numbers and never saw combat.

Heavy Tank M6
T1E1 prototype
TypeHeavy tank
Place of originUnited States
Service history
In servicetrials only
Used byUnited States Army
WarsWorld War II
Production history
DesignerUS Army Ordnance Corps
ManufacturerBaldwin Locomotive
No. built40
Variants6
Specifications (M6)
Mass126,500 lb (57.4 tonnes) combat loaded
Length27 ft 8 in (8.43 m) gun forward
Width10 ft 3 in (3.12 m) over track armor
Height9 ft 10 in (3.0 m) to turret roof
Crew6 (commander, gunner, driver, assistant driver, loader, assistant loader)

Armor25–83 mm
Main
armament
1 × 3 in (76.2 mm) gun M7 (75 rounds)
1 × 37 mm (1.46 in) gun M6 (202 rounds)
Secondary
armament
2 × .50 cal (12.7mm) Browning M2HB machine guns, hull (6,900 rounds)
2 × .30 Browning M1919A4 machine guns, one fixed (bow), one flexible AA (5,500 rounds)
Engine1,823 in3 (29.88 L) Wright G-200 9-cylinder gasoline
825 hp at 2,300 rpm
Power/weight15.7 hp/tonne
TransmissionTimken mechanical model 16001, three speeds (two forward, one reverse); rear drive sprocket
SuspensionHorizontal volute spring
Ground clearance20.5 in (52 cm)
Fuel capacity477 US gallons (1,810 L)
Operational
range
100 miles (160 km)
Maximum speed 22 mph (35 km/h)

Development

Because of limited budgets for tank development in the interwar years, at the outbreak of World War II the US Army possessed few tanks, though it had been keeping track of the use of tanks in Europe and Asia. Successful employment of armored units in 1939–40, mostly by the Germans, gave momentum to a number of US tank programs, including a heavy tank. The United States possessed a massive industrial infrastructure and large numbers of engineers that would allow for mass production of tanks.

Following the Chief of Infantry recommendation from May 1940, the US Army Ordnance Corps started to work on a 50-ton heavy tank design. The project was approved in June and the vehicle received the designation Heavy Tank T1.

Initially, a multi-turreted design was proposed, with two main turrets each armed with a low-velocity T6 75 mm (2.95 inch) gun, a secondary turret with a 37 mm gun and a coaxial .30 caliber (7.62 mm) machine gun, and another secondary turret with a 20 mm gun and a coaxial .30 caliber machine gun. Four .30 caliber machine guns were to be installed in ball mounts, two in the glacis (front) plate and two in the rear corners of the hull. The design was somewhat similar in concept to multi-turreted breakthrough tanks developed in Europe in the 1920s and throughout the 1930s, such as the 1925 British Vickers A1E1 Independent or the Soviet T-35 of the early 1930s, albeit on a much more powerful scale: the older tank designs were typically armed with a single light or medium-caliber main gun and multiple machine guns, and had armor only sufficient to protect from small arms fire. Later in the decade, however, European tank developers switched to single-turret designs.

Front view of M6, with several early M3 light tanks in the background
Side view

By October, the US developers reached the same conclusion as their European counterparts. The armament was changed to a single vertically stabilized 3-inch (76.2 mm) gun and a coaxial 37 mm gun in a single three-man turret with both manual and electric traverse. The turret had a commander's cupola identical to that of the M3 Medium Tank. Additional armament consisted of two .50 caliber machine guns in a bow mount (operated by the assistant driver), two .30 caliber machine guns in the front plate (fired electrically by the driver), one .30 caliber in the commander's cupola and one .50 caliber in a rotor mount for anti-aircraft use in the right rear of the turret roof (operated by the loader). The crew consisted of commander (seated in the turret left), gunner to the right of the gun, gun loader (turret), driver and assistant driver in the front left and right of the hull respectively, and another crewman in the hull to pass ammunition to the turret.

One of the main challenges was developing a powerpack for such a heavy vehicle. The Wright G-200 air-cooled radial gasoline engine was selected by a committee formed by the Society of Automotive Engineers, but no suitable transmission was available. The committee recommended developing a hydramatic transmission, while a possibility of using a torque converter or an electric transmission was also to be checked.

The project was first publicly disclosed in August 1940 when the Army awarded Baldwin Locomotive Works in Pennsylvania a $5.7 million contract for the production of 50 tanks. The Army envisioned building 500 of this type.[1]

The first T1E1 was delivered to the Army in December 1941.[2] From 1941 to 1942, three prototypes were built. One with electric transmission and two with torque converter transmission. Variants with hydramatic transmission were never completed. The prototypes also differed in hull assembly method— one had a welded hull and two had cast hulls.

On 26 May 1942, two variants with torque converter transmission were standardized as M6 and M6A1. Standardization of the electric transmission equipped T1E1 as the M6A2 was never approved, but the manufacturing of the vehicle was nevertheless recommended. It was proposed by the Ordnance Corps that 115 T1E1s would be built for the US Army for "extended service tests", between that and Services of Supply instruction to increase production with the balance going to aid US allies, this would mean 50 M6s and 65 M6A1s built for the British.[3] Production started in December 1942.

Some minor changes were introduced in the production vehicles: the cupola was replaced by a double-door hatch with a ring mount, the machine gun in a rotor mount and the left front machine gun were removed.

However, by the time the M6 was ready for production, the Armored Corps had lost interest in the project. The advantages the M6 offered over medium tanks – its much thicker armor and slightly more powerful gun – were offset partly by the shortcomings of the design – such as very high silhouette, awkward internal layout and reliability problems – and partly by logistical concerns due to its weight.

In early 1942, the Ordnance Department set a production target of 250 a month, with Fisher as a second contractor to meet a planned expansion in the size of the army.[4] However, by September, the focus had changed, with tank production scaled back and more aircraft for the USAAF. Under this new "Army Supply Program", the M6 production was cut from 5,000 to a little over 100.[4]

By the end of 1942, the Armored Corps were of the opinion that the new M4 Sherman gave adequate solution for the present and the near future, while being reliable, cheap and much easier to transport and they had no need for a heavy tank. In 1943, the production target was reduced again, down to 40,[4] being an economic cut-off.[5]

Production M6 and pilot M6A1 examples were evaluated at Fort Knox in the early part of 1943. The reports were critical of the awkward and inefficient crew stations, and the superfluous 37mm gun.[6] However, in October, the tank had performed well enough at Aberdeen Proving Ground to proceed.[7]

The Ordnance Corps had expected the 75 mm gun to be lacking, and the T1E1 prototype was tested with a T7 90 mm gun and was found to be a satisfactory gun platform, although the poor turret layout was again noted. By this point, the M6 had been cancelled.[8]

In August 1944, the Ordnance Corps recommended modifying the T1E1s to build 15 specially armored and armed tanks to meet a need for attacking heavily fortified areas. These 77-ton vehicles – designated M6A2E1 – with thicker (equivalent to 7.5-inch (190 mm) vertical protection) glacis armor and a turret developed for the T29 Heavy Tank, armed with a T5E1 105 mm gun but no increase in engine power. Ordnance believed they could be delivered by November. The proposal was put to the supreme commander in Europe General Eisenhower, who rejected them as impracticable. Two tanks were used to test the T29 turret and gun, but their armor was not modified.[9]

On 14 December 1944, the M6 was declared obsolete. Only 40 had been produced and they never left US soil. Several toured the United States for propaganda purposes, where they gave performance displays (such as car crushing) at War Bond drives and the like. All were eventually scrapped except for a single T1E1, which was put on display at the United States Army Ordnance Museum, Aberdeen, Maryland.

The British used the suspension of the M6 in the first of their two A33 Heavy Assault Tank "Excelsior" prototypes.

Variants

M6A1; note the angular welded hull
T1E1
M6A2E1 at Aberdeen Proving Ground, June 1945
  • T1 – Cast hull, hydramatic transmission. Never built.
  • T1E1 – Cast hull, General Electric electrical transmission.[10] Standardization proposed as M6A2 but not accepted. 20 units built.
  • T1E2 / M6 – Cast hull, torque converter transmission. 8 units built.
  • T1E3 / M6A1 – Welded hull, cast turret, torque converter transmission. 12 units built.
  • T1E4 – Welded hull, hydramatic transmission. Four GM engines.[10] Cancelled 1942. Never built.
  • M6A2E1 – Uparmored T1E1 fitted with a new turret with a T5E1 105 mm gun. Used for testing T29 heavy tank project armament system. Project cancelled at 22 August 1944.[11] 2 units built.

See also

Tanks of comparable role, performance and era
  • British Excelsior – prototype heavy tank, two built, did not enter service
  • British Churchill – heavy tank, entered service in 1941
  • American-British T14 – prototype heavy tank with similar specifications
  • Soviet KV-1 – heavy tank, entered service in 1939
Contemporaries to M6A2E1 variant
  • German Tiger II – late-war heavy tank, entered service in 1944
  • United States T26E4 "Super Pershing" heavy tank – single prototype M26 Pershing with extra armor and improved gun; fought in Western Europe during 1945
  • Soviet IS-2 model 1944 – heavy assault tank, entered service in 1944
  • Soviet IS-3 – heavy tank, entered service in 1945, did not see combat

References

  1. "$5,689,725 Contract to Baldwin Locomotive Works Calls for 60 to 70-Ton Machines Capable of 50-Mile-an-Hour Speed". The New York Times. The United Press. 9 August 1940. Retrieved 2 October 2018.
  2. "First Heavy Tank Passes Army Test". The New York Times. 8 December 1941. Retrieved 2 October 2018.
  3. Hunnicutt, pp. 47–48
  4. Chamberlain & Ellis, p. 155
  5. Hunnicutt, p. 49
  6. Hunnicutt, pp. 50–54
  7. Baldwin, Hanson W. (7 October 1943). "Monster Tanks and Light Rifles Among Arms Tested at Aberdeen". The New York Times. Retrieved 2 October 2018.
  8. Hunnicutt, p. 55
  9. Hunnicutt, p. 57–59
  10. Hunnicutt p37
  11. "M6A2E1: Heavy Clownshoe". Retrieved 26 June 2017.

Sources

  • Chamberlain, Peter & Ellis, Chris (1969), British and American Tanks of World War II, Arco Publishing
  • R.P. Hunnicutt – Firepower: A History of the American Heavy Tank, 1988 Presidio Press, ISBN 0-89141-304-9.
  • Icks, Robert J. (1971), No. 32: The M6 Heavy and M26 Pershing, AFV Weapons, Profile Publishing

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.