Milton line
The Milton line is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto to Milton, by way of Mississauga.
Milton | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
GO Train south of Queen Street West, travelling eastbound to Union Station | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Canadian Pacific Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Toronto; Mississauga; Milton | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 9 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Commuter rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | GO Transit rail services | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | GO Transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 30,000 (2014)[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | October 27, 1981 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 50.2 km (31.2 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
History
The Canadian Pacific Railway strongly resisted all efforts to put passenger trains on what is now called the Milton line. If it hadn’t been for the 1979 Mississauga train derailment and Mississauga Mayor Hazel McCallion, there might be no service on the line to this day. After the derailment, McCallion and Mississauga city council threatened to sue CP for the huge emergency services bill caused by the derailment on the CPR line near Mavis Rd. As part of the compromise that got the suit dropped, CP agreed to drop its long-standing objection to passenger service on its freight line.[2]
Following a promotional opening on Sunday October 25, 1981, regular service began the following Monday.[3] Six trips were operated from 2002–2009 and five before this. From 2009–2011, there were seven inbound and seven outbound train trips daily. An eighth train was added to the morning and afternoon runs in 2011 and a ninth train started on January 5, 2015.[4] On February 25, 2016, a tenth train was announced for the 2016–17 fiscal year, as part of the 2016 Ontario budget process.
The Ontario government is working with Metrolinx to have more train service along the Milton line, known as GO Transit Regional Express Rail over the next decade. During peak hours, trains would run in peak direction every 15 minutes along this line.[5]
Waterloo Region
Bus service was expanded into the cities of Cambridge, Kitchener and Waterloo in October 2009. Several bus routes operate between the University of Waterloo and Wilfrid Laurier University in Waterloo, the Charles Street Transit Terminal in Kitchener, and the Cambridge SmartCentre shopping centre to the Square One Bus Terminal in central Mississauga, including a small number of trips connecting with the train service at Milton GO Station.
The Regional Municipality of Waterloo funded a study indicating that a $110 million extension of the Milton line could bring trains to Cambridge by 2012, with possible stations at Guelph Line in Campbellville, Highway 6 in Puslinch, and at Franklin Boulevard (a park-and-ride) and Water Street (downtown with transit connections) in Cambridge.[6] However, the plans didn't come to fruition when an environmental assessment became a victim of budget cuts. GO Transit expects expansion of train service to Cambridge to happen in the 15 to 25 year time frame, after passenger capacity upgrades at Milton to relieve current train overcrowding.[7]
In September 2016, GO Transit created a new bus service to connect Cambridge and Milton on weekday mornings during peak travel times, with six return trips in the evening.[8] This bus route averaged only five passengers per trip and was cancelled in June 2019 due to low demand.[9]
Town of Milton
Regional Express Rail (RER) is part of the Province’s ‘Big Move’, a $50-billion public transit expansion adopted in 2008 to reduce traffic congestion in the GTHA. Part of the original plan announced in 2008 was the implementation of two-way, all-day rail service to Milton, slated to be in place within 15 years of the announcement (2023). In the 2012 ‘Big Move Update’, this timeline shifted to a 16-to-25-year planning horizon.[10] As a result of this deferral to a longer-term timeline for the improvements, Milton town councillor Rick DiLorenzo has referred to the Milton line as the "orphan" of Metrolinx.[10] Regional Chair Gary Carr said it feels like the rug was being pulled from underneath them with these sudden changes that affected Halton towns Milton and Georgetown. "If the Big Move projects benefiting Halton are delayed, Halton will not be able to meet provincial growth plan targets. The transportation system mode split and level of service objectives will not be met," said Tim Dennis, Halton's regional transportation services director.[11]
Making matters worse for Town of Milton residents, the 2012 Big Move update document indicates that RER all-day, two-way service will only extend as far west as Meadowvale station in Mississauga, and will not service Lisgar station in Mississauga, nor Milton's station, service which had been promised by the provincial Liberals Halton candidate during the 2011 election.[12][13][14][15] This change was approved in February 2013.[16]
The discrepancy appears to come between conflicting stated goals between the Big Move (full two-way, all-day service to Milton within 15 years) and GO 2020 (two-way, all-day service only to Meadowvale station in 15 years, and to Milton and Lisgar within 25 years). An objective of The Big Move Update is to align the GO 2020 plan and The Big Move. Reports cited "significant infrastructure and operational challenges that mean it will not be possible to deliver two-way, all-day service all the way to Milton in the 15-year time horizon. Additional tracks and potentially numerous grade separations are necessary are a prerequisite to the expansion of service to Milton. The construction is especially challenging through built-up areas. This rail corridor is largely owned by CPR, a private third party operating freight rail. Their approval is required for any service and infrastructure expansion. Two-way, all-day service can be delivered to Meadowvale in the 15-year timeframe, but the full extension to Milton can only be delivered over the 25-year horizon."[16]
The new proposal in the 2020 strategic plan includes these new revised service levels, with buses extending service westward:[17]
- Peak Service: 15-minute or better train service for Meadowvale, with express service during high-demand periods. Counter-peak service every 30 minutes.
- Off-Peak Service: All-day service twice hourly to Meadowvale with bus service to Milton.
2015 developments
In April 2015, Metrolinx in partnership with the Town of Milton launched a pilot project through an app called Rideco which allows GO riders to book transportation to and from the Milton GO Station. This is due to the Milton station's parking lot being full by the time the second morning train arrives. As North America's fastest growing community for the last decade, the parking lot has increasing been in demand by new residents and those driving in from Cambridge.[18]
2017 developments
In 2017, at a Region of Halton planning and public works committee meeting Halton Region director of planning and chief planning official Ron Glenn said, "The timing for the Milton two-way, all-day GO is in the post 25-year horizon. Interestingly enough, we had a discussion with Metrolinx this week about creating a focus group on getting a defined time for the two-way, all-day GO service in Milton as a priority." The information was shared with regional councillors at a February 8 planning and public works committee. On February 17, Metrolinx, through Halton MPP Indira Naidoo-Harris, challenged that assertion, saying, "Metrolinx is not aware of any sources that would lead to the information that was posted in the Milton Canadian Champion article. We are still working toward better service on the Milton GO line."[19]
Connections
The Milton line makes connections with:
Future
In 2015, Metrolinx released a list of potential sites for construction of new GO train stations. For the Milton line, the sites include:[20]
- Bathurst/Spadina, between Bathurst Street and Spadina Avenue in Toronto
- Liberty Village, near King Street West
- Queen West, at the intersection of Queen Street West and Dufferin Street
- Dundas West, near the intersection of Dundas Street West and College Street
- The East Mall
- The West Mall
- Cawthra/Dundas, near the intersection of Cawthra Road and Dundas Street West
- Trafalgar, southeast of Highway 401 at Trafalgar Road
Selection of some station sites would preclude other sites. Only one of The East Mall and The West Mall sites would result in a potential future station, as would only one of the Liberty Village, Queen Street West-Dufferin, and Dundas West sites. The potential site for The East Mall or The West Mall is south of Dundas Street West near its intersection with Highway 427. After a business case, none of these stations were determined to have a positive economic impact and thus were removed from the Regional Express Rail plan.[21]
See also
References
- "Regional Express Rail" (PDF). Metrolinx. 5 September 2014. Retrieved 2 September 2014.
- "Riding the rails into Mississauga's past". Mississauga.com. Retrieved 13 January 2018.
- Daniel Garcia; James Bow. "GO Transit's Milton Line". Transit Toronto. Retrieved February 25, 2019.
- "Extra GO train added". The Milton Canadian Champion. 2009-06-24.
- "Ontario Improving GO Transit Service Along All Corridors". News.ontario.ca. Retrieved 13 January 2018.
- "TheRecord.com - Local - Study supports $110M GO train plan from Milton to Cambridge". 6 October 2009. Archived from the original on 6 October 2009. Retrieved 13 January 2018.CS1 maint: bot: original URL status unknown (link)
- "Waterloo Region Breaking News - Waterloo Region's Online Newspaper - TheRecord.com". TheRecord.com. Retrieved 13 January 2018.
- "New GO bus service between Cambridge, Milton starting Sept. 6". CBC.ca. Retrieved 13 January 2018.
- Draaisma, Muriel (5 June 2019). "GO Transit to cut 3 bus routes, reduce service on 2 others to save $3.7M yearly". CBC.ca. Retrieved 10 September 2019.
- Williams, Rachael (7 April 2015). "Milton to press Metrolinx for two-way, all-day GO service". Insidehalton.com. Retrieved 13 January 2018.
- "Mayor says Metrolinx's Big Move is now 'Big Stall'". Theifp.ca. 17 April 2013. Retrieved 13 January 2018.
- "The Big Move: Next Wave Projects" (PDF). Metrolinx. Archived from the original (PDF) on 2016-03-04. Retrieved 2015-11-26.
- "Halton candidates state their election platforms". Insidehalton.com. 15 September 2011. Retrieved 13 January 2018.
- "Liberals promise increased GO train service". Insidehalton.com. 15 September 2011. Retrieved 13 January 2018.
- "Final debate". Inside Halton Sep 30, 2011
- "The Big Move Update – Recommended Changes" (PDF). Metrolinx.com. Retrieved 13 January 2018.
- "GO Transit Strategic Plan 2020" (PDF). Archived from the original (PDF) on 2012-01-03. Retrieved 2011-06-07.
- "Metrolinx, Milton launching pilot project to deal with parking overflow: report - CityNews Toronto". Citynews.ca. 25 March 2015. Retrieved 13 January 2018.
- O’Hara, Catherine (17 February 2017). "Metrolinx challenges Champion story about all-day, two-way GO train service to Milton". Insidehalton.com. Retrieved 13 January 2018.
- Woo, Leslie (22 September 2015). "New station analysis: Methodology and process" (PDF). Metrolinx.com. Retrieved 26 November 2015.
- "Regional Express Rail: Stations for Consideration" (PDF). Metrolinx. Retrieved February 3, 2019.