Paris Métro Line 3

Paris Métro Line 3 (French: Ligne 3 du métro de Paris) is one of the sixteen lines of the Paris Métro. It connects Pont de Levallois – Bécon station in the near northwestern suburbs to Gallieni in the east, where Paris's international bus station is located. After opening as the network's third line in 1904, it was the subject of a number of extensions, with a major restructuring occurring in the eastern section in 1971, with an extension to Gallieni and the conversion of the original terminal branch to Line 3bis.

Line 3
MF 67 stock train departing Villiers
Overview
LocaleLevallois-Perret, Paris, Bagnolet
TerminiPont de Levallois – Bécon
Gallieni
Connecting lines


Stations25
Service
SystemParis Métro
Operator(s)RATP
Rolling stockMF 67 (48 trains as of 31 October 2010)
Ridership101.4 million including Line 3bis (avg. per year)
10th/16 (2017)
History
Opened19 October 1904 (19 October 1904)
Technical
Line length11.665 km (7.248 mi)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification750 V DC third rail
Conduction systemConductor (OCTYS)
Average inter-station distance486 m (1,594 ft)
Route map

Pont de Levallois – Bécon
Anatole France
Louise Michel
Porte de Champerret
Pereire
Wagram
Malesherbes
Villiers/Van Dick sidings
Villiers
Europe
Saint-Lazare
Havre – Caumartin
Opéra
Quatre-Septembre
Bourse
Sentier
Réaumur – Sébastopol
Arts et Métiers
Temple
République
Parmentier
Rue Saint-Maur
Père Lachaise
Gambetta
St Fargeau shops
Porte de Bagnolet
Gallieni

With a length of 11.7 km (7 mi), Line 3 crosses Paris from west to east completely on the Rive Droite, serving the residential areas of the 17th arrondissement, the Gare Saint-Lazare, important stores and shopping centres, the area around the Place de l'Opéra, as well as the east of the city, around République station. In 2017, it carried 101.4 million passengers, making it the tenth busiest line of the Métro network.

History

Chronology

  • 10 October 1904: The first portion of line 3 was opened between Père Lachaise cemetery and Villiers. Work took longer than expected because of existing infrastructure.
  • 25 January 1905: The line was extended in the east from Père Lachaise to Gambetta.
  • 23 May 1910: The line was extended westbound from Villiers to Pereire.
  • 15 February 1911: The line was extended from Pereire to Porte de Champerret.
  • 27 November 1921: The line was extended eastbound from Gambetta to Porte des Lilas.
  • 24 September 1937: The line was extended from Porte de Champerret to Pont de Levallois.
  • 1967: Line 3 was the first metro line to receive new MF67 rolling stock. It still uses this stock which has been recently renovated.
  • 23 August 1969: Gambetta station is remodelled, absorbing nearby Martin Nadaud station.
  • 23 March 1971: The branch between Gambetta and Porte des Lilas was separated from the line to become the independent Line 3bis.
  • 2 April 1971: The line was extended from Gambetta to Gallieni.

A second east–west axis

A 300-series Thomson at République in 1904

The infrastructure works for Line 3 were auctioned off in six sections on 24 May 1902. The concession was granted to the CMP by the municipal government of Paris on 13 March 1903, but the declaration of public utility was only granted on 26 February 1907.

A display of Line 3's cut-and-cover construction technique at Opéra. The vault heading underneath Rue Auber is visible

The works were rendered difficult due to the necessary displacement of existing underground infrastructure such as water, gas, and electricity lines, but also because the Line 3 was to cross a number of Métro lines, particularly at Opéra, where a special pit was built to house the intersection of Lines 3, 7, and 8. This masonry pit was 20 m (66 ft) and constructed fully so as to avoid any problems when building subsequent lines. Since the work was situated at the water table, it required concrete pillars made by sinking caissons with compressed air. The work lasted eleven months, from March 1903 to February 1904.

Another difficult point of construction was the crossing of the Canal Saint-Martin. To build underneath it, the canal was dried and its vault hanged. In the area of the Place Gambetta, because of the instability of the subsoil, which consisted of waterlogged sand balls, made it necessary to drain the soil, a very delicate operation considering the number of buildings that could be destabilised. Then the side walls were built from masonry shafts that are dark from the outside.

Future plans

Although no funded plans for an extension of Line 3 currently exist, Line 3bis may be merged with Line 7bis to form a new line, possibly named Line 19, which Line 3 would then connect to.

Map and stations

Renamed stations

  • 15 October 1907: Rue St-Denis renamed Réaumur-Sébastopol.
  • 1926: Caumartin renamed Havre-Caumartin
  • 1 May 1946: Vallier renamed Louise Michel in honour of the leader of the "La Commune".
  • September 1998: Saint-Maur is renamed Rue Saint-Maur in order to avoid confusion with the suburb of Saint-Maur-les-Fossées.

Facts

  • Due to connections with other adjacent stations, it is possible to walk between three stations on the line without heading to the surface. This is done by starting at Saint-Lazare (Métro 3, 12, 13 and 14), then transferring to Hausmann Saint-Lazare station (RER E), from there going to Havre – Caumartin (Métro 3 and 9) then connecting to Auber (RER A) and finally walking from there to Opéra (Métro 3, 7 and 8). The journey can also be made the other way round (Opéra to Saint-Lazare)

Tourism

Line 3 passes near several places of interest :

See also

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.