Robert C. Byrd Lock and Dam
The Robert C. Byrd Lock and Dam, formerly the Gallipolis Lock and Dam, is the 10th lock and dam on the Ohio River, located 280 miles downstream from Pittsburgh. There are 4 locks: one for commercial barge traffic, 1,200 feet long by 110 feet wide; the auxiliary lock is 600 feet long by 110 feet wide; and there are 2 smaller parallel locks.[1]
Locks and dams of the Ohio River | ||
---|---|---|
Upstream: Racine Lock and Dam |
Downstream: Greenup Lock and Dam |
Robert C. Byrd Lock and Dam | |
---|---|
Official name | Robert C. Byrd Lock and Dam |
Location | Ohio/West Virginia border |
Coordinates | 38.6816°N 82.1900°W |
Construction began | August 25, 1937 |
Opening date | October 1937 |
Construction cost | Lock Replacement $244,550,000 Dam Rehabilitation $46,700,000 |
Operator(s) | |
Dam and spillways | |
Type of dam | 8 Roller gates |
Impounds | Ohio River |
Length | 1,132 feet |
Reservoir | |
Normal elevation | 538 feet above sealevel |
See also
External links
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.