S86 (Berlin)

The S86 was a line number used by the Berlin S-Bahn.

Overview
LocaleBerlin
Service
SystemBerlin S-Bahn
Operator(s)S-Bahn Berlin GmbH
Technical
Electrification750 V DC Third rail

A Line with many Routes

This line number has been associated with four different routes during the last fifteen years. In June 1991, the line commenced service between Warschauer Straße and Buch. The line was altered in May 1993 to run between Pankow and Hauptbahnhof (now Ostbahnhof). The line was completed removed in May 1994.

The line re-appeared as a night-time shuttle between Hermannstraße and Spindlersfeld in December 1999 before being removed again in June 2002. The line was re-introduced temporarily during construction works between September 2005 and May 2006.

Warschauer Straße to Buch

This service ran for two years and provided an increased daytime service between Warschauer Straße and Buch. The line was extensively altered in May 1993 which effectively removed most of this service. The station listing below provides an overview of what the line looked like. The possible travel connections are correct for the period of operation and do not reflect the current travel connections for these stations.

Hauptbahnhof to Pankow

In May 1993, the line was extended by one station to the Hauptbahnhof (now Ostbahnhof) with the northern section cut back to Pankow. This revised line existed for a single year when the line disappeared off the maps for a period of five years. The station listing below provides an overview of what the line looked like. The possible travel connections are correct for the period of operation and do not reflect the current travel connections for these stations.

S86: Night Line

In December 1999, the line re-appeared as a night-time shuttle service between Spindlersfeld and Hermannstraße. This short line ran between 9pm and 4am to provide Spindlersfeld with a link to the network when the (S85) finished for the night. The line lasted until June 2002 when the new (S47) line started serving Spindlersfeld both day and night rendering the S86 obsolete. The station listing below provides an overview of what the line looked like. The possible travel connections are correct for the period of operation and do not reflect the current travel connections for these stations.

Nordbahnhof to Birkenwerder

During major construction works at Pankow station and in the north–south tunnel between September 2005 and May 2006, the S86 operated between Nordbahnhof and Birkenwerder to maintain a service to the outer railway ring stations. The line joined with the (S26) at Nordbahnhof for 3 weeks to provide a through service to Teltow Stadt from 8 May 2006 until 27 May 2006. The possible travel connections are correct for the period of operation and do not reflect the current travel connections for these stations.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.