Sardi Khola Hydropower Station (Nepali: सार्दी खोला जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Kaski District of Nepal. The flow from Sardi River is used to generate 4 MW electricity. The plant is owned and developed by Mandakini Hydropower Pvt. Ltd., an IPP of Nepal. The plant started generating electricity from 2074-08-23BS. The generation licence will expire in 2105-03-12 BS, after which the plant will be handed over to the government. [1] The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.[2]
Sardi Khola Hydropower Station | |
---|---|
![]() ![]() Location of Sardi Khola Hydropower Station in Nepal | |
Official name | Sardi Khola Hydropower Project |
Country | Nepal |
Location | Kaski District |
Coordinates | 28°20′00″N 84°00′35″E |
Purpose | Power |
Status | Operational |
Owner(s) | Mandakini Hydropower Pvt. Ltd. |
Dam and spillways | |
Type of dam | Gravity |
Impounds | Sardi River |
Commission date | 2074-08-23 BS |
Type | Run-of-the-river |
Installed capacity | 4 MW |
See also
References
- "Operating Projects- Hydro (Above 1MW)".
- Annual Report 2019/2039. Nepal Electricity Authority.