Shaktinagar Terminal–Tanakpur Express

Triveni Express is an express train belonging to Northern Railway zone that runs between Shaktinagar Terminal and Tanakpur in India. It is currently being operated with 15075/15076 train numbers on four days in week basis.[1][2]

Triveni Express
Overview
Service typeExpress
Current operator(s)North Eastern Railway zone
Route
StartShaktinagar Terminal (SKTN)
Stops39
EndTanakpur (TPU)
Distance travelled860 km (534 mi)
Service frequencyFour days [lower-alpha 1]
Train number(s)15075/15076
On-board services
Class(es)AC 2 tier, AC 3 tier, Sleeper Class, General Unreserved
Seating arrangementsNo
Sleeping arrangementsYes
Catering facilitiesOn-board Catering
E-Catering
Observation facilitiesICF Coaches
Entertainment facilitiesNo
Baggage facilitiesNo
Technical
Rolling stock2
Track gauge1,676 mm (5 ft 6 in)
Operating speed36 km/h (22 mph), including halts

The name Triveni signifies the Triveni Sangam or the meeting pointing of three rivers of the Ganges, the Yamuna and the Saraswati at Prayag in Allahabad which is a station on the train's route.

Service

The 24369/Triveni Express has an average speed of 36 km/hr and covers 741 km in 20h 50m. The 24370/Triveni Express has an average speed of 37 km/hr and covers 741 km in 19h 55m.

Route and halts

The important halts of the train are:

Coach composite

The train has standard ICF rakes with max speed of 110 kmph. The train consist of 15 coaches :

  • 1 AC II Tier
  • 1 AC III Tier
  • 4 Sleeper Coaches
  • 7 General
  • 2 Seating cum Luggage Rake

Traction

Both trains are hauled by a Lucknow Loco Shed based WDM 3A or WDP-4 diesel locomotive from Shaktinagar to Bareilly and vice versa.

Rake Sharing

The train shares its rake with 14369/14370 Triveni express

Direction Reversal

Train Reverses its direction 1 times:

See also

Notes

  1. Runs four days in a week for every direction. Departs @ 15:25 SKTN/Shaktinagar Platform# 1 SUNDAY, MONDAY, WEDNESDAY, FRIDAY Arrives @ 16:15 +1 night TPU/Tanakpur Platform# 1 MONDAY, TUESDAY, THURSDAY, SATURDAY

References

  1. "Pushpak Express delayed by 23 hours". The Times of India. 24 June 2015. Retrieved 27 September 2018.
  2. Triveni will now run two hours ago


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.