Bathinda–Rajpura line

The Rajpura–Bathinda line is a railway line connecting Bathinda and Rajpura in the Indian state of Punjab. The line is under the administrative jurisdiction of Northern Railway.[1]

Rajpura–Bathinda line
Overview
StatusOperational
OwnerIndian Railways
LocalePunjab
TerminiBathinda Junction
Rajpura Junction
Service
SystemDiesel operated (electrification and doubling) electrified till patiala from Rajpura end
Operator(s)Northern Railway
Technical
Track length173 km (107 mi)
Number of tracks1 (single)
Track gauge1,676 mm (5 ft 6 in) broad gauge
Electrificationdoubling in progress with electrification
Highest elevation
  • Rajpura 274 m (899 ft)
  • Bathinda 207 m (679 ft)
Route map

to Delhi–Fazilka line
to Shri Ganganagar
0
Bathinda Junction
to
Bathinda–Rewari line
Delhi–Fazilka line
9
Bathinda Cantt
to Delhi–Fazilka line
17
Bhuchchu
22
Lahira Khana
25
Lehra Muhabbat
33
Ramphura Phul
41
Jethuke
46
Tapa
51
Ghunas
59
Hadiyaya
65
Barnala
74
Sekha
82
Alal
90
Rajomajra
to Ludhiana–Jakhal line
96
Dhuri Junction
to Ludhiana–Jakhal line
103
Kaulseri
109
Chhintanwala
117
Kakrala
123
Nabha
130
Kalhe Majra
136
Dhabian
144
Patiala Cantt
148
Patiala
151
DMW Halt Patiala
157
Daun Kalan
164
Kauli
176
Rajpura Junction
on Ambala–Attari line

Main stations

History and key developments on the route

The Maharaja of Patiala was built the railway station in the perpendicular orientation as he had hoped that one day the Ambala–Ludhiana would be diverted via Patiala, but that never happened. One reason was the trains would have to pay the taxes levied by the Pepsu state.[2]

In February 2015, doubling of track between Rajpura–Patiala–Bathinda was sanctioned.[3]

In 2016, electrification of the single broad-gauge railway line from Rajpura to Dhuri junction is under progress which is being executed by Rail Vikas Nigam Ltd.[4]

Patiala railway station on the line is also one of the 400 stations to be redeveloped under the Government of India's AMRUT scheme. In 2016, the work for the platform-1 extension is in progress which shall be extended to another 200 meters to accommodate the longest possible train.

In March 2017, work for doubling of Rajpura–Patiala–Bathinda line was partly given to Northern railway construction but later all was allotted and interested in rail Vikas Nigam limited. As it is also a feeder route for Eastern Dedicated Freight Corridor. It has capacity utilization to the peak. The doubling is scheduled to start for December 2018.[5]

Electrification

The rail link has been approved by the rail board for electrification to the Lehra Mahabat railway station and doubling to Bathinda junction. The electrification trail between Rajpura and Dhuri was completed on 10 September 2019.[6] Commission of Railway Safety(CRS) has given clearance to electrification up to Dhuri Junction.[7]

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.