Shiraitodai Station

Shiraitodai Station (白糸台駅, Shiraitodai-eki) is a train station in Fuchū, Tokyo, Japan, operated by the private railway operator Seibu Railway.

SW04
Shiraitodai Station

白糸台駅
Shiraitodai Station entrance, 2007
Location2-71-6 Shiraito, Fuchū-shi, Tokyo
(東京都府中市白糸台二丁目71-6)
Japan
Operated by Seibu Railway
Line(s) Seibu Tamagawa Line
Other information
Station codeSW04
History
Opened1917
Previous namesKita-Tama Station(until 2001)
Passengers
FY20145,635 daily

Lines

Shiraitodai Station is served by the Seibu Tamagawa Line, and is 4.1 kilometers from the terminus of the line at Musashi-Sakai in Tokyo.

Station layout

The station has one ground-level island platform, serving two tracks, connected to the station building by a level crossing.

Platforms

1  Seibu Tamagawa Line for Musashi-Sakai
2  Seibu Tamagawa Line for Koremasa

Adjacent stations

« Service »
Seibu Tamagawa Line
Tama - Kyōteijōmae

History

The station opened on October 22, 1917, as Kita-Tama (北多磨) Station and adopted its present name in 2001.[1][2]

Station numbering was introduced on all Seibu Railway lines during fiscal 2012, with Shiraitodai Station becoming "SW04".[3]

Passenger statistics

In fiscal 2014, the station was the 77th busiest on the Seibu network with an average of 5,635 passengers daily.[4]

The passenger figures for previous years are as shown below.

Fiscal yearDaily average
20095,371[5]
20105,267[6]
20115,209[7]
20125,354[8]
20135,519[8]

Surrounding area

References

  1. 駅一覧 [List of stations] (PDF) (in Japanese). Archived from the original (PDF) on 3 September 2014. Retrieved 29 August 2014.
  2. 年譜 [Chronological Record] (PDF) (in Japanese). Japan: Seibu Railway. Archived from the original (PDF) on 3 September 2014. Retrieved 29 August 2014.
  3. 西武線全駅で駅ナンバリングを導入します [Station numbering to be introduced at all Seibu stations] (PDF). News Release (in Japanese). Japan: Seibu Railway. February 23, 2012. Archived from the original (PDF) on 24 September 2015. Retrieved 29 August 2014.
  4. 駅別乗降人員 2014(平成25)年度 1日平均 [Average daily station usage figures (fiscal 2014)] (PDF) (in Japanese). Japan: Seibu Railway. Archived from the original (PDF) on 8 March 2016. Retrieved 6 April 2016.
  5. 駅別乗降人員 2009(平成21)年度 1日平均 [Average daily station usage figures (fiscal 2009)] (PDF) (in Japanese). Japan: Seibu Railway. Archived from the original (PDF) on 24 September 2015. Retrieved 29 August 2014.
  6. 駅別乗降人員 2010(平成22)年度 1日平均 [Average daily station usage figures (fiscal 2010)] (PDF) (in Japanese). Japan: Seibu Railway. Archived from the original (PDF) on 26 June 2011. Retrieved 29 August 2014.
  7. 駅別乗降人員 2011(平成23)年度 1日平均 [Average daily station usage figures (fiscal 2011)] (PDF) (in Japanese). Japan: Seibu Railway. Archived from the original (PDF) on 1 November 2012. Retrieved 29 August 2014.
  8. 駅別乗降人員 2013(平成25)年度 1日平均 [Average daily station usage figures (fiscal 2013)] (PDF) (in Japanese). Japan: Seibu Railway. Archived from the original (PDF) on 14 July 2014. Retrieved 29 August 2014.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.