St. Croix Crossing
The St. Croix Crossing is an extradosed bridge that spans the St. Croix River, between Oak Park Heights, Minnesota and St. Joseph, Wisconsin. Connecting Minnesota State Highway 36 and Wisconsin State Highway 64, the bridge carries four lanes of traffic (two lanes in each direction), and includes a bike/pedestrian path on the north side.[1]
St. Croix Crossing | |
---|---|
The St. Croix Crossing, as seen from Oak Park Heights, Minnesota. | |
Coordinates | 45.042230°N 92.784948°W |
Carries | 4 lanes of MN 36 / WIS 64 |
Crosses | St. Croix River |
Locale | Oak Park Heights, Minnesota and St. Joseph, Wisconsin |
Official name | St. Croix Crossing |
Maintained by | MnDOT and WisDOT |
Characteristics | |
Design | Extradosed bridge |
Total length | 4,660 feet (1,420 m) |
Clearance below | 150 feet |
History | |
Opened | August 2, 2017 |
Statistics | |
Toll | None |
Location | |
History
MnDOT, WisDOT, and the Federal Highway Administration were seeking a replacement for the nearly 90 year old Stillwater Bridge, which was frequently congested, inadequate for modern traffic, and was deteriorating from its age. The St. Croix River Crossing Project called for the construction of a new four-lane bridge less than a mile downriver, followed by the conversion of the Stillwater Bridge to pedestrian and bicycle use. Originally, construction of this bridge was planned to start in 2024, but legislation was passed requiring the Department of Transportation to address aging bridges by 2018, and the start date was moved up to 2013.[2] However, on March 11, 2010, a federal judge ruled that the government had violated its rules in approving the bridge design, which sent the process back to an earlier stage.[3] Because the bridge traverses the Saint Croix National Scenic Riverway, construction could only proceed following federal legislation which granted an exemption to the Wild and Scenic Rivers Act.[4]
Construction on the bridge began with the piers in 2014. The bridge was opened to vehicle traffic following a ribbon-cutting ceremony on August 2, 2017.[5][6]
References
- "St. Croix Crossing" (PDF). Minnesota Department of Transportation. August 2, 2017. Retrieved August 3, 2017.
- "St. Croix River Crossing Project: Revised Construction Dates" (PDF). Minnesota Department of Transportation. June 2008.
- "Plans for new St. Croix bridge headed back to drawing board". Minnesota Public Radio. March 2010.
- "Obama gives his approval to bridge across St. Croix River". Star Tribune. Retrieved 2017-08-06.
- "St. Croix Crossing Background" (PDF). Minnesota Department of Transportation. August 2, 2017. Retrieved August 3, 2017.
- "Thousands celebrate as new St. Croix River bridge opens, Lift Bridge closes". Star Tribune. Retrieved 2017-08-06.