The Tehri Dam is the tallest dam in India. It is a multi-purpose rock and earth-fill embankment dam on the Bhagirathi River near Tehri in Uttarakhand, India. It is the primary dam of the THDC India Ltd. and the Tehri hydroelectric complex. Phase 1 was completed in 2006. The Tehri Dam withholds a reservoir for irrigation, municipal water supply and the generation of 1,000 megawatts (1,300,000 hp) of hydroelectricity. The dam's 1,000 MW variable-speed pumped-storage scheme is currently under construction with expected commissioning in May 2018.[1][2]

Tehri Dam
The dam in 2008; dam depth is 800 feet
Location of Tehri Dam in Uttarakhand
CountryIndia
LocationUttarakhand
Coordinates30°22′40″N 78°28′50″E
StatusOperational
Construction began1978
Opening date2006
Construction costUS $2.5 billion
Owner(s)THDC INDIA LIMITED
Dam and spillways
Type of damEmbankment, earth and rock-fill
ImpoundsBhagirathi River
Height260.5 m (855 ft)
Length575 m (1,886 ft)
Width (crest)20 m (66 ft)
Width (base)1,128 m (3,701 ft)
Spillways2
Spillway typeGate controlled
Spillway capacity15,540 m3/s (549,000 cu ft/s)
Reservoir
Total capacity4.0 km3 (3,200,000 acre⋅ft)
Surface area52 km2 (20 sq mi)
Power Station
Commission date2006
TypeP no
TurbinesFrancis pump turbines
Installed capacity1,000 MW (1,300,000 hp)
Max. planned: 2,400 MW

History

Tehri dam in November 2004

A preliminary investigation for the Tehri Dam Project was completed in 1961 and its design was completed in 1972 with a 600  MW capacity power plant based on the study. Construction began in 1978 after feasibility studies but was delayed due to financial, environmental and social impacts.

In 1986, technical and financial assistance was provided by the USSR, but this was interrupted years later with political instability. India was forced to take control of the project and at the first, it was placed under the direction of the Irrigation Department of Uttar Pradesh. However, in 1988 the Tehri Hydro Development Corporation was formed to manage the dam and 75% of the funding would be provided by the federal government, 25% by the state. Uttar Pradesh would finance the entire irrigation portion of the project.

Technical description

The main power house of Tehri Dam that houses four generators each capable of producing 250 MW of power.

Tehri Dam is a 260.5 m (855 ft) high rock and earth-fill embankment dam. Its length is 575 m (1,886 ft), crest width 20 m (66 ft), and base width 1,128 m (3,701 ft). The dam creates a reservoir of 4.0 cubic kilometres (3,200,000 acre⋅ft) with a surface area of 52 km2 (20 sq mi). The installed hydrocapacity is 1,000 MW along with an additional 1,000 MW of pumped storage hydroelectricity. The lower reservoir for the pumped-storage plant is created by the Koteshwar Dam downstream.

The Tehri Dam and the Tehri Pumped Storage Hydroelectric Power Plant are part of the Tehri Hydropower Complex which also includes the 400 MW Koteshwar Dam.[3] Tehri pumped storage plant (4 X 250 MW) has variable speed features which can optimize the round trip efficiency under varying water levels in its reservoirs.[4] Power is distributed to Uttar Pradesh, Uttarakhand, Punjab, Delhi, Haryana, Jammu and Kashmir, Chandigarh, Rajasthan and Himachal Pradesh . The complex will afford irrigation to an area of 270,000 hectares (670,000 acres), irrigation stabilization to an area of 600,000 hectares (1,500,000 acres), and a supply of 270 million imperial gallons (1.2×10^6 m3) of drinking water per day to the industrialized areas of Delhi, Uttar Pradesh and Uttarakhand.

The total expenditure for this project was USD 1 billion.

Scheduling and generation dispatch

The scheduling and dispatch of the Tehri Hydro Power plant is done by Northern Regional Load Dispatch Center(NRLDC)

which is the apex body to ensure the integrated operation of the power system grid in the Northern region and comes under Power System Operation Corporation Limited (POSOCO). At present, THDC India Ltd. is generating around 3,000 GWh annually from this dam.

Environmental issues

Tehri dam in July 2008

The Tehri Dam has been the object of protests by environmental organizations and local people of the region. Virendra Dutt Saklani, lawyer and founder of the Anti-Tehri Dam Struggle Committee, was quick to point out the consequences associated to the large project.[5] Environmental activist Sunderlal Bahuguna led the Anti-Tehri Dam movement from 1980s till 2004.[6][7] The protest was against the displacement of town inhabitants and environmental consequence of the weak ecosystem.[5]

In addition to the human rights concerns, the project has spurred concerns about the environmental consequences of locating such a large dam in the fragile ecosystem of the Himalayan foothills. There are further concerns regarding the dam's geological stability.[5] The Tehri dam is in the Central Himalayan Seismic Gap, a major geologic fault zone. This region was the site of a 6.8 magnitude earthquake in October 1991, with an epicenter 53 km (33 mi) from the dam. Dam proponents claim that the complex is designed to withstand an earthquake of 8.4 magnitude, but some seismologists say that earthquakes with a magnitude of 8.5 or more could occur in this region. Were such a catastrophe to occur, the potentially resulting dam-break would submerge numerous towns downstream, whose populations total near half a million.

A protest message against Tehri dam, which was steered by Sundarlal Bahuguna for years. It says "We don't want the dam. The dam is the mountain's destruction."

The relocation of more than 100,000 people from the area has led to protracted legal battles over resettlement rights and, ultimately, resulted in the project's delayed completion.[8]

Since 2005, filling of the reservoir has led to the reduced flow of Bhagirathi water from the normal 1,000 cu ft/s (28 m3/s) to a mere 200 cu ft/s (5.7 m3/s). This reduction has been central to local protest against the dam, since the Bhagirathi is considered part of the sacred Ganges whose waters are crucial to Hindu beliefs. At some points during the year, the tampering with Bhagirathi waters means this tributary stops flowing. This has created resentments among many Hindus, who claim that the sanctity of the Ganges has been compromised for the generation of electricity. The officials say that when the reservoir is filled to its maximum capacity the flow of the river will again become normal. In spite of concerns and protestation, operation of the Tehri Dam continues.

NTPC Limited Takeover

On 21st of November 2019, the Government of India approved the take over of Tehri Hyrdo Development Corporation (THDC) by NTPC Limited.

References

  1. "Variable Speed Pumped Hydroelectric Storage". Retrieved 5 October 2017.
  2. "Projects: Current Status". Tehri Hydro Development Corporation. Retrieved 5 October 2015.
  3. Tehri Dam: An Engineering Marvel, by Basistha Raj Adhikari
  4. "A Review of Power Electronic Converters for Variable Speed Pumped Storage Plants" (PDF). Retrieved 5 July 2020.
  5. Nachowitz, Todd (June 1988, Vol 12, No 2). "THE TEHRI DAM, INDIA - STUMBLING TOWARD CATASTROPHE". Cultural Survival Quarterly. Retrieved 2020-07-23. Check date values in: |date= (help)
  6. "Protectors of Nature". The Hindu. 23 June 2016. ISSN 0971-751X. Retrieved 3 July 2016.
  7. Dutta, Ratnajyoti (8 March 2016). "Save earth for next generation: Chipko legend". BigWire. Retrieved 3 July 2016.
  8. Terminski, Bogumil (2013). "Development-Induced Displacement and Resettlement: Theoretical Frameworks and Current Challenges", Indiana University, available at http://dlc.dlib.indiana.edu/dlc/handle/10535/8833?show=full
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.