USCGC Penobscot Bay (WTGB-107)

USCGC Penobscot Bay (WTGB 107) is the seventh of nine United States Coast Guard 140-foot Bay-class icebreaking tugs. Homeported in Bayonne, New Jersey, the primary missions of Penobscot Bay and her crew are Domestic Icebreaking and Ports, Waterways, & Coastal Security. During the winter months, Penobscot Bay is responsible for providing search and rescue capabilities to the ice-covered areas in New York City and the Hudson Valley, as well as throughout coastal New England. The cutter also facilitates the safe navigation of commercial product, including gasoline and heating oil, through the ice-choked Hudson River from New York City to Albany. All Bay-class cutters, including Penobscot Bay, use a low-pressure-air hull lubrication or bubbler system that forces air and water between the hull and ice. This system improves icebreaking capabilities by reducing resistance against the hull, reducing horsepower requirements.

USCGC Penobscot Bay (WTGB 107)
History
United States
Builder: Bay City Marine Incorporated
Laid down: July 1, 1983
Launched: July 30, 1984
Commissioned: January 4, 1985
Homeport: Bayonne, NJ
Identification:
Motto: "Performance, Prowess, Pride"
Status: Active
General characteristics
Class and type: 140' Bay-class Icebreaking Tug (WTGB)
Type: Icebreaker
Displacement: 690 tons
Length: 140 ft
Beam: 37.5 ft
Draft: 12.5
Ice class: 30 inch continuous, 6 feet back/ramming
Installed power: Diesel Electric
Propulsion: Two Fairbanks-Morse diesel engines
Speed: 14.7 knots (27 km/h) max
Crew: 17

In addition to ice breaking, Penobscot Bay is heavily involved in providing waterside security for the port of New York/New Jersey, the busiest port on the East Coast. Penobscot Bay is also responsible for monitoring vessel traffic, enforcing boating regulations for recreational and commercial vessels, and acting as lead security for high-profile events in the port.

Penobscot Bay is crewed by 17 personnel, consisting of 14 enlisted members and 3 officers. She was built by Bay City Marine in Tacoma, WA, keel was laid on 1 July 1983, launched on 30 July 1984, and commissioned on 4 January 1985. Her overall length is 140 feet with a beam of 37 feet, displacing 662 tons.[1][2][3][4]

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.