2025 in rail transport
This article lists events related to rail transport that are currently scheduled to occur in 2025. Please be aware that the actual dates on which these events occur may differ substantially from what is shown here.
Years in rail transport |
Events
February
- – Estimated start of South Shore Line service along the West Lake Corridor.[1]
April
- – Delhi–Alwar Regional Rapid Transit System to be completed, allowing speeds up to 160 km/h.[2]
Unknown date
- – Metro Tunnel is planned to open, connecting north and south railway lines in Melbourne.[3]
- – Vienna U-Bahn line U5 opening.
- – O-Train Confederation Line (Ottawa) Stage 2 West extension earliest completion date.
- – Valley Line (Edmonton) extension earliest completion date.
- – China Railway High-speed network to reach 37607 km length.
- – Shenzhen Metro is claimed to exceed 1000 km length.
- – Shanghai Metro is claimed to exceed 1000 km length.
- – Greater Copenhagen Light Rail opening.
- – Paris Métro Line 13 automation start (end in 2027).
- – Expected completion of Stuttgart 21 railway.[4]
- – Delhi Metro network to exceed 450 km.
- – Tehran Metro network to exceed 430 km.
- – claimed opening of high-speed Drammen–Tønsberg line and Dovre Line sections.
- – Makati Intra-city Subway opening.[5]
- – Circle MRT line final extension to make closed full loop.
- – Several short high-speed lines upgrading to 250 km/h.
- – Wanda–Zhonghe–Shulin line opening.
- – Northern HSR Phase 1 opening.
- – Northeastern HSR Phase 2 opening.
- – Los Angeles Purple Line Extension Phase 2 expected to be complete.[6]
- – Planned completion of Los Angeles Metro Rail Gold Line Foothill Extension to Pomona, California.[7]
- – Planned completion of the complete Honolulu Rail Transit to Ala Moana,[8][9] though delays are possible.[10]
- – Estimated completion of VTA light rail extension to Eastridge Transit Center in San Jose.[11]
- – Estimated restoration of rail service along the Lackawanna Cut-Off, with New Jersey Transit starting commuter service to Andover Township.[12]
References
- Mills, Wes (27 October 2020). "Ceremony to Break Ground on West Lake Corridor Project". Grow INdiana Media Ventures. Inside Indiana Business. Retrieved 1 November 2020.
- Stateholders' Workshop for Delhi-Gurgaon-Rewar-Alwar RRTS Corridor (PDF) (Report). Archived from the original (PDF) on 20 September 2017. Retrieved 2017-09-20.
- "Frequently asked questions". Metro Tunnel. Victorian Government. Retrieved 13 June 2020.
- "Projektstatus" (in German). Bahnprojekt Stuttgart-Ulm. October 28, 2019.
- "Makati City, IRC consortium likely to break ground for subway project by year-end". GMA News Online. Retrieved September 19, 2018.
- Los Angeles Metro. "Purple Line Extension". Retrieved 2018-05-02.
- "Major Construction Begins on Foothill Gold Line Extension Project". NBC Los Angeles. 10 July 2020. Retrieved 18 August 2020.
- Honolulu Authority for Rapid Transit. "Rail Facts". Retrieved 2016-11-26. See question "When will the train start operating?"
- "Nā Inoa" (PDF). honolulu.gov. April 15, 2019. Retrieved December 3, 2019.
- Daysog, Rick (23 September 2020). "More obstacles threaten to delay completion of rail project by up to 4 years". Hawaii News Now. Retrieved 8 October 2020.
- Deruy, Emily (6 June 2019). "San Jose: VTA greenlights Eastridge light rail extension". The Mercury News. Retrieved 9 June 2019.
- Krawczeniuk, Borys (March 2, 2020). "New study drops cost of passenger train comeback". The Citizens' Voice. Retrieved May 3, 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.