Badgingarra Wind Farm
Badgingarra Wind Farm is a wind farm in the locality of Hill River northwest of the town of Badgingarra in Western Australia, about 200 kilometres (120 mi) north of Perth. It is owned by APA Group and located immediately north of the older Emu Downs Wind Farm which has the same owner.[1]
Badgingarra Wind Farm | |
---|---|
Country | Australia |
Location | Hill River, WA |
Coordinates | 30°24′36″S 115°19′12″E |
Status | Operational |
Construction began | November 2017 |
Commission date | 2 May 2019 |
Construction cost | A$315m |
Owner(s) | APA Group |
Wind farm | |
Type | |
Hub height |
|
Rotor diameter |
|
Rated wind speed |
|
Power generation | |
Units operational | 37 × 3.6 MW |
Make and model | Siemens SWT-3.6-130 |
Nameplate capacity | 133.2 MW |
Capacity factor | 44.10% (average 2019, 2020) |
Annual net output | 514.5 GWh (average 2019, 2020) |
External links | |
Website | www |
Construction of Badgingarra Wind Farm began in November 2017 and it was completed in early 2019. It consists of 37 Siemens wind turbine generators, each generating 3.6 MW of electricity. The turbine hubs are 85 metres (279 ft) above the ground, and the rotor tips reach 150 metres (490 ft).[2] APA Group is also constructing the Badgingarra Solar Farm adjacent to the wind farm to provide 17.5 MW of solar photovoltaic generation.[1]
Badgingarra Wind Farm was officially opened by the Western Australian Energy Minister, Bill Johnston on 2 May 2019. It is connected to the Western Power network North Country region.[3] The output is contracted to Alinta Energy until the end of 2035.[2] The wind farm is expected to generate 500–550 GWh of energy per annum.[4]
Operations
AEMO records begin in January 2019 for the wind farm. The generation table uses AEMO Facility SCADA to obtain generation values for each month. Badgingarra's code is BADGINGARRA_WF1, so that is used as part of a SUMIF operation (shown below) on the table to get the total. Note that each month's values start 8 hours into the respective month and extend 8 hours into the next month.
=SUMIF(E2:E Last Row,"*BADGINGARRA_WF1*",F2:F Last Row)
Year | Total | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2019 | 524,712 | 26,924 | 36,866 | 39,664 | 42,255 | 47,462 | 40,178 | 33,664 | 44,667 | 38,845 | 50,863 | 65,834 | 57,490 |
2020 | 504,247 | 48,033 | 40,042 | 46,298 | 33,568 | 40,476 | 36,935 | 41,461 | 45,954 | 36,512 | 45,639 | 37,050 | 52,279 |
Note: Asterisk indicates power output was limited during the month.
References
- "Western Australia renewables precinct" (PDF). APA Group. Retrieved 3 January 2021.
- "Badgingarra Wind Farm". APA Group. Retrieved 3 January 2021.
- Government of Western Australia (2 May 2019). "WA's 130MW Badgingarra wind farm officially opens" (Press release). RenewEconomy. Retrieved 3 January 2021.
- "First turbine installed at 130-MW Aussie wind farm". Renewablesnow.com. Retrieved 4 January 2021.