The 30 megawatt Cullerin Range Wind Farm is located in the localities of Cullerin and Breadalbane in the Upper Lachlan Shire, New South Wales, Australia. The wind farm was completed in 2009 and cost around $90 million.[1] The owner, Origin Energy, sold the business to Energy Developments, a subsidiary of Duet.[2]

Cullerin Range Wind Farm from Cullerin

Cullerin Range Wind Farm
Cullerin Range Wind Farm from the eastern side of the Cullerin Range
Location of Cullerin Range Wind Farm in New South Wales
CountryAustralia
Location
Coordinates34.814°S 149.396°E / -34.814; 149.396
StatusOperational
Construction began
  • 2007
Commission date
  • 2009
Construction costA$90 million
Owner(s)Energy Developments
Wind farm
Typeonshore
Hub height
  • 80 m (260 ft)
Power generation
Units operational8 × 2 MW
7 × 2.05 MW
Make and modelSenvion Senvion MM82 (8)
Senvion Senvion MM92 (7)
Nameplate capacity30 MW
External links
Websiteedlenergy.com/project/cullerin-range/

See also

References

  1. Alan Copeland. Electricity Generation Major Development Projects -- October 2009 Listing Archived 7 July 2011 at the Wayback Machine, ABARE, November 2009, p. 6.
  2. Conroy, John (17 June 2016). "Origin sells Cullerin Range wind farm for $72m". www.theaustralian.com.au. The Australian. Archived from the original on 15 May 2017. Retrieved 16 May 2017.