Bedok South MRT station

Bedok South MRT station is a future underground Mass Rapid Transit station on the Thomson–East Coast Line in Bedok planning area, Singapore.[1]

 TE30 
Bedok South
勿洛南
பிடோக் சவுத்
Bedok South
Mass Rapid Transit (MRT) station
Construction site of Bedok South station in November 2020
Coordinates1.316613°N 103.948276°E / 1.316613; 103.948276
Owned byLand Transport Authority
Operated bySMRT Trains (SMRT Corporation)
Line(s)
PlatformsIsland
Tracks2
Construction
Structure typeUnderground
Depth22m
Platform levels2
Disabled accessYes
History
Opening2024 (2024)
Services
Preceding station   Mass Rapid Transit   Following station
Thomson–East Coast Line
Future service
Terminus
Location
Bedok South
Bedok South station in Singapore

The station will be located next to Temasek Secondary School, at the intersection of Upper East Coast Road and Bedok South Road.

History

On 15 August 2014, LTA announced that Bedok South station would be part of the proposed Thomson East-Coast line (TEL). The station will be constructed as part of Phase 5, consisting of 2 stations between Bedok South and Sungei Bedok, and is expected to be completed in 2024.[2][3]

Contract T311 for the design and construction of Bedok South Station and associated tunnels was awarded to China Jingye Engineering Corporation Limited (Singapore Branch) at a sum of S$188 million on April 2016. Construction started in 2016, with completion in 2024.[4]

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.