Orchard Boulevard MRT station
Orchard Boulevard MRT station is a future underground Mass Rapid Transit station on the Thomson–East Coast line situated at the boundary of River Valley and Orchard planning areas, Singapore. It will be located on the corner of Orchard Boulevard (hence the name) and Grange Road, near Camden Medical Centre, Singapore Tourism Board headquarters in Singapore Tourism Court and Traders Hotel.[1] Expected to open in 2021, it will be located between the stations of Napier and Orchard. The station will have 2 platforms, located in an island platform arrangement. Like all underground stations on the Singapore MRT, it will have full-height platform screen doors to contain air conditioning, and for safety purposes. These will be manufactured by GE Transportation, like all doors on the Thomson–East Coast line. There will be a mezzanine area of the station, where ticket machines, faregates, an information booth, and toilets will be located. Of the two exits this station will have, one will be built along Orchard Boulevard, with another on Grange Road next to the Tourism Court.
TE13
Orchard Boulevard 乌节林荫道 ஆர்ச்சர்ட் பொலிவார்ட் Orchard Boulevard | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | |||||||||||
Entrance to the station along Orchard Boulevard under construction | |||||||||||
Location | 20 Orchard Boulevard Singapore 248654 | ||||||||||
Coordinates | 1°18′09″N 103°49′30″E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Operated by | SMRT Trains Ltd (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opening | 2022 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Orchard Boulevard Orchard Boulevard station in Singapore |
History
This station was first announced on 29 August 2012.[2]
On 15 August 2014, LTA announced that Orchard Boulevard station would be part of the proposed Thomson East-Coast line (TEL). The station will be constructed as part of Phase 3, consisting of 13 stations between Mount Pleasant and Gardens by the Bay, and is expected to be completed in 2021.[3][4]
Contract T218 for the design and construction of Orchard Boulevard Station was awarded to KTC Civil Engineering & Construction Pte Ltd at a sum of S$143 million in May 2014. Construction started in 2014, with completion in 2021.[5]
References
- "TSL System Map & Station Footprints".
- "Speech by Mr Lui Tuck Yew, Minister for Transport, at the Inspection of Downtown Line 1 Station and Announcement of Thomson Line alignment, 29 August 2012, 10.00am at Telok Ayer Station". Ministry of Transport. 29 August 2012. Archived from the original on 8 September 2012. Retrieved August 29, 2012.
- "Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links in the East | Press Room | Land Transport Authority". 2014-08-19. Archived from the original on 2014-08-19. Retrieved 2020-02-13.
- "LTA | Upcoming Projects | Rail Expansion | Thomson-East Coast Line". 2020-02-13. Archived from the original on 2020-02-13. Retrieved 2020-02-13.
- "LTA | News Room | News Releases | LTA Awards Four Contracts for Thomson Line's Orchard Boulevard, Great World, Outram Park and Shenton Way Stations". 2020-02-13. Archived from the original on 2020-02-13. Retrieved 2020-02-13.