Bunagana–Rutshuru–Goma Road
Bunagana–Rutshuru–Goma Road, is a road in Uganda and the Democratic Republic of the Congo, connecting the towns of Bunagana in Uganda with Bunagana in DRCongo. In addition the road connects these two towns to Bugani, Rutshuru, Rumangabo, Buhumba and Goma, all in DRCongo.[1][2]
Bunagana–Rutshuru–Goma Road | |
---|---|
Route information | |
Length | 55 mi (89 km) |
Major junctions | |
East end | Bunagana |
Bugani Rutshuru Rumangabo Buhumba | |
West end | Goma |
Location | |
Countries | Democratic Republic of the Congo, Uganda |
Highway system | |
Trans-African Highway network |
Location
The eastern end of this road is in Bunagana, Uganda, at the international border with DRCongo. The road travels in a general north-westerly direction, through the towns of Bunagana, DRCongo, Bugani to Rutshuru. At Rutshuru, the road turns southwestwards and passes through Rumangabo and Buhumba, to end at Goma, a total distance of approximately 90 kilometres (56 mi).[1][3]
Overview
This road is an important transport corridor between Uganda and the Democratic Republics of the Congo. It is expected to boost Uganda's trade with DRC, in agricultural and manufactured products, including refined petroleum products, as Uganda enters the oil-production phase.[4]
Upgrades and reconstruction
Before 2019, the road was gravel surfaced, in various stages of disrepair. In November 2019, Yoweri Museveni of Uganda and Félix Tshisekedi of the Democratic Republic of the Congo signed agreements in Entebbe, Uganda, to upgrade this road to bituminous surface, within twenty-four months, after the relevant ministers have agreed on implementation details.[1][2]
In October 2020, the Cabinet of Uganda resolved to participate in the upgrading and paving up to 223 kilometres (139 mi) of roads in the DRC to the tune of 20 percent of the cost. The government of the DRC would be responsible for the remaining 80 percent of the cost. The two roads involved are: 1. the 134 kilometres (83 mi) Kasindi–Beni–Butembo Road and 2. the 90 kilometres (56 mi) Bunagana–Rutshuru–Goma Road.[5]
Uganda's Minister of Works and Transport revealed that Uganda would contribute US$65.9 million (USh246 billion) as its investment towards the improvements to the two roads, measuring 223 kilometres (139 mi). The total cost of renovation and improvement is budgeted at US$334.3 million (UShs1.2 trillion). It is expected that after the road improvement, Uganda's exports to DR Congo will double, from the current $532 million (USh1.9 trillion) annually to $1.064 billion (USh3.8 trillion).[6][7]
References
- Paul Ampurire (10 November 2019). "Museveni, Tshisekedi Hold Talks; Uganda And DRC To Jointly Develop Road Infrastructure". Kampala: SoftPower Uganda. Retrieved 13 November 2019.
- Halima Athumani (10 November 2019). "Uganda and DRC to Improve Infrastructure to Ease Business". Washington, DC: VOA News. Retrieved 13 November 2019.
- Google (4 October 2020). "Road Distance Between Bunagana And Goma" (Map). Google Maps. Google. Retrieved 4 October 2020.
- Rodney Muhumuza (29 September 2020). "Uganda to help build roads inside Congo, citing trade goals" (Quoting the Associated Press). The Washington Post. Retrieved 4 October 2020.
- Kenneth Kazibwe (30 September 2020). "Uganda to build 223km road network inside DRC". Kampala: Nile Post Uganda. Retrieved 4 October 2020.
- Arthur Arnold Wadero (7 October 2020). "Govt explains Shs240b for DR Congo road projects". Daily Monitor. Kampala. Retrieved 8 October 2020.
- Jonathan Kamoga and Patrick Ilunga (22 October 2020). "Uganda, DR Congo decide to make roads, not war". The EastAfrican. Nairobi. Retrieved 22 October 2020.
External links
- Uganda and DR Congo to build cross-border roads As of 11 November 2019.