Double-stack rail transport
Double-stack rail transport is a form of intermodal freight transport in which railroad cars carry two layers of intermodal containers. Invented in the United States in 1984 it is now being used for nearly seventy percent of United States intermodal shipments. Using double stack technology, a freight train of a given length can carry roughly twice as many containers, sharply reducing transport costs per container. On United States railroads special well cars are used for double-stack shipment to reduce the needed vertical clearance and to lower the center of gravity of a loaded car. In addition, the well car design reduces damage in transit and provides greater cargo security by cradling the lower containers so their doors cannot be opened. A succession of larger container sizes have been introduced to further increase shipping productivity in the United States.
Double-stack rail operations are growing in other parts of the world, but are often constrained by clearance and other infrastructure limitations.
History
Southern Pacific Railroad (SP), along with Malcom McLean, devised the double-stack intermodal car in 1977.[1][2] SP then designed the first car with ACF Industries that same year.[3][4] At first it was slow to become an industry standard, then in 1984 American President Lines, started working with the Union Pacific Railroad and that same year, the first all double-stack train left Los Angeles, California for South Kearny, New Jersey, under the name of "Stacktrain" rail service. Along the way the train transferred from the UP to the Chicago and North Western Railway and then to Conrail.
Sizes and clearances
Double-stack cars come in a number of sizes, related to the standard sizes of the containers they are designed to carry. Well lengths of 12.19 m (40.0 ft), 14.63 m (48.0 ft) and 16.15 m (53.0 ft) are most common.[5] Heights range from 2.44 m (8 ft 0 in) to 2.90 m (9 ft 6 in)("high cube").
Double stack requires a higher clearance above the tracks, or structure gauge, than do other forms of rail freight. Double-stack cars are most common in North America where intermodal traffic is heavy and electrification is less widespread; thus overhead clearances are typically more manageable. Nonetheless, North American railroads have invested large sums to raise bridges and tunnel clearances along their routes and remove other obstacles to allow greater use of double stack trains and to give them more direct routes.
CSX lists three clearance heights above top of rail for double stack service:[6]
- Doublestack 1 — 18 ft 2 in (5.54 m)
- Doublestack 2 — 19 ft 2 in (5.84 m)
- Doublestack 3 — 20 ft 2 in (6.15 m)
The last clearance offers the most flexibility, allowing two high cube containers to be stacked.
Stacking containers
Forty-foot containers are the standard unit length and load bearing points are at the ends of such containers. Longer containers, such as 45, 48 and 53 feet long, still have the load bearing points 40 feet apart, with the excess protruding equally outside this length. Therefore, 40-foot containers, or larger, can be stacked on 20-foot containers if there are two 20-foot containers in a row; however, 20-foot containers cannot be stacked on top of 40-foot or longer containers. The possible double-stacking patterns are:
- Two 20 ft in lower and one 40 ft (or longer) in upper stack (allowed in India, China)
- One 40 ft in lower and another 40 ft (or longer) in upper stack (allowed in India)
- Two 20 ft in lower and another set of two 20 ft in upper stack (possible in well-type cars, where ?)
The container coupling holes are all female and double male twistlocks are required to securely mate container stacks together.
Dwarf Containers
China had started to use reduced size containers to be stacked onto normal containers to allow transport under 25 kV electrification. It did not allow for combination with hi-cube containers though.
India has started to build a series of dwarf container for domestic transport to be run under 25 kV electrification. With 6 feet 4 inches (1,930 mm) they are 662 mm shorter but 162 mm wider than ISO shipping containers while still allowing for 67% more capacity.[7] The chosen width is comparable to the American 53-foot containers.
Weights
Containers have weight limits designed to allow their transport by road trucks, which have lower weight limits than trains. Outside the U.S., a common limit for railways is 8 tonnes per metre (8.1 short ton/yd; 7.2 long ton/yd) train length and 22.5 tonnes (22.1 long tons; 24.8 short tons) per axle. A four axle container car can take 90 tonnes (99.2 short tons; 88.6 long tons). Since a container is limited to 30.5 tonnes (33.6 short tons; 30.0 long tons), even including the empty weight of the rail car, single stacking uses only part of the load capacity of the railway. A 20-foot (6.1 m) container is limited to 24 tonnes (26.5 short tons; 23.6 long tons) and two such can fit into a car for a 40-foot (12.2 m) container, or even three if double-stacking, but not four unless very high axle load is permitted. The North American railways permit two 53-foot (16.15 m) or four 20-foot (6.1 m) containers as shown in the images on this page.
Another consideration is the maximum weight of a train. A maximum length train in Europe, 750 m (2,461 ft) long can have 50 container cars with a total weight of 2,250 tonnes (2,480 short tons; 2,210 long tons), and more if 20 ft containers are included. This is not far from the limit using standard European couplers.
Operations
North America
Intermodal containers shipped by rail within North America are primarily 53 feet (16.15 m) long, with trailer-on-flat-car (TOFC) units used as well. The 53-foot length reflects a common maximum length for highway semi-trailers, which varies by state.[8] Major domestic intermodal carriers include:
- JB Hunt
- Swift
- Schneider National
- Hub Group
Containers shipped between North America and other continents consist of mostly 40-foot (12.19 m) and some 45-foot (13.72 m) and 20-foot (6.10 m) containers. Container ships only take 40's, 20's and also 45's above deck. 90% of the containers that these ships carry are 40-footers and 90% of the world's freight moves on container ships; so 81% of the world's freight moves by 40-foot containers. Most of these 40-foot containers are owned by non-U.S. companies like Maersk, MSC, and CMA CGM. The only U.S. 40-foot container companies are leasing companies like Textainer, Triton International,[9] and CAI Leasing.[10]
Low bridges and narrow tunnels in various locations prevent the operation of double-stack trains until costly upgrades are made. Some Class I railroad companies in the U.S., often in partnership with government agencies, have implemented improvement programs to remove obstructions to double-stack trains. Double-stack projects include:
- Heartland Corridor (Norfolk Southern Railway) — $320 million[11]
- Norfolk Southern Crescent Corridor — $2.5 billion (estimate)
- National Gateway (CSX Transportation) — $700 million [12]
- Commonwealth Railway — $69 million[13]
- Chicago Region Environmental and Transportation Efficiency Program — $3 billion (estimate)
- Cross-Harbor Rail Tunnel proposed to connect rail freight lines in New Jersey with Long Island, New York. — $10–14 billion (estimate)
- Continental Rail Gateway (Canadian Pacific Railway), proposed tunnel between Detroit, Michigan and Windsor, Ontario to replace the existing Michigan Central Railway Tunnel. — $400 million[14]
Outside North America
On the vast majority of its network, Europe has more restricted loading gauge and train weight limits as well as axle load limits. In other words, many bridges and tunnels are too low for double-stacking. In addition, since European electrification standards generally predated double stacking overhead catenary in Europe is too low to accommodate double stacking and rebuilding for double-stack operation is far too expensive. Only a few newly built routes make accommodation for possible double stacking in the future such as the Betuweroute in the Netherlands which however links to no other railway line allowing double stacking.
Standard gauge railways in North America and China must use special well wagons to lower the center of gravity,[15] reduce the loading gauge and in China allow double stack trains to run under specially heightened overhead lines. 1,676 mm (5 ft 6 in) broad gauge used in India allows for trains can carry standard shipping containers double-stacked on standard flat wagons. Flat wagons, in addition to being much less expensive than well wagons, can carry more containers in a given length of train.[16][17] Indian Railways is able to carry containers double-stacked on standard flat wagons at 100 km/h (62 mph). Experiments with triple-stacked operation using lower, 1,981 mm (6.5 ft) containers, were done unsuccessfully in 2006.[18] Experiments in India for double stacking using flatcars under 25 kV AC overhead lines set 7.45 m (24.4 ft) above rail have begun with funds given by Japan.[19][20][21]
- Australia - double-stacked trains operate between Perth, Adelaide, Darwin and Parkes, New South Wales[22] 6.5 m (21 ft) clearances.[23] The Inland Railway between Melbourne and Brisbane will be built for the operation of double stacked trains.[24]
- Brazil - Double Stacked trains in Brazil already operates between the intermodal terminal of Sumaré-SP and Rondonópolis-MT (around 1000 km). The operation started in June 2019 by Brado Logística. Besides that, a brand new railroad called "Ferrovia Norte - Sul" will also operate with Double Stack container trains. The operation will start in 2021.[25][26]
- China - Since 2018, China Railway is using double-stacked containers in well-wagons haulled by electric locomotives under 25 kV AC overhead lines on several select lines.[16][27][28][29]
- India - Mundra Port and Pipavav Port operate double-stacked diesel and electric trains on 1,676 mm (5 ft 6 in) gauge using flat wagons.[16] It is one of only three countries to commercially double stack 9 ft 6 in (2,896 mm) tall (high cube) containers on a train.[30] India is building the Dedicated Freight Corridor, an economical and environmental friendly electrical traction based double-stack freight railway network which can transport international standard containers.[31]
- Kenya - The Mombasa-Nairobi standard gauge railway has been built for the operation of double-stacked trains,[32] the first such trains being launched on October 1, 2018.[33] All future extensions will be built to similar standards.
- Netherlands - The Betuweroute, a freight rail between Rotterdam to the German border built 2007 is prepared for double-stacking insofar that tunnels are being built to accommodate double stack trains to reduce the cost and time of any future upgrade to the network.[34] The current catenary wire is too low for double stack rail transport and the upgrade is dependent on the German section of the railway connection.
- Panama - The rebuilt Panama Canal Railway operates double-stack container trains 47.6 miles (76.6 km) across the Isthmus of Panama from Colón on the Atlantic Ocean, to Balboa on the Pacific, near Panama City.
- Saudi Arabia - Saudi Railways Organization line to Dammam.[35]
References
- Cudahy, Brian J. (September–October 2006). "The Containership Revolution: Malcom McLean's 1956 Innovation Goes Global" (PDF). TR News. National Academy of Sciences (246).
- "Chronological History". Union Pacific Railroad Company. Archived from the original on 2006-08-10. Retrieved 2010-09-17.
- Kaminski, Edward S. (1999). American Car & Foundry Company: A Centennial History, 1899–1999. Wilton, California: Signature Press. ISBN 0963379100.
- "A new fleet shapes up. (High-Tech Railroading)". Railway Age. September 1, 1990 – via HighBeam Research.
- "Guide to Railcars". Archived from the original on March 8, 2011.
- "CSX System Clearance Map— Doublestack Routes". Retrieved July 26, 2019.
- Vishwas Kothari (2018-07-10). "Indian railways introduces first double stack dwarf containers". Times of India.
- "Table 3-6: Semitrailer Length Limitations on National Truck Network by State". U.S. Department of Transportation, Federal Highway Administration.
- Triton
- CAI
- "Norfolk Southern opens Heartland Corridor". Railway Gazette International. September 9, 2010.
- "CSX Announces National Gateway to Improve Flow of Freight". CSX. May 1, 2008.
- "New Commonwealth Railway line set to open". Trains Magazine. December 16, 2010.(subscription required)
- Battagello, Dave (November 1, 2011). "Rail tunnel awaiting government funds". Windsor Star.
- "Low center of gravity". Archived from the original on March 21, 2011.
- Das, Mamuni (October 15, 2007). "Spotlight on double-stack container movement". The Hindu Business Line. Retrieved February 25, 2009.
- Das, Mamuni (October 29, 2007). "Green signal for triple-stacks on diesel routes". The Hindu Business Line. Retrieved March 15, 2009.
- Rao, Raghvendra (October 10, 2006). "Rlys to operate triple-stack container trains". Indian Express.
- "Photo Gallery: IRJ". IRFCA. Archived from the original on October 7, 2008.
- Dayal, Raghu (May 2009). "Preparing to handle double-stack containers". Railway Gazette International: 46.
- "Reaching up". Railway Gazette International. August 2009. p. 17.
- "Double stacked to Perth". Parkes Champion Post. July 28, 2008. Archived from the original on 2008-07-29. Retrieved 2010-09-17.
- "2008-2024 Interstate and Hunter Valley Rail Infrastructure Strategy" (PDF). ARTC. June 30, 2008.
- "Service offering | Inland Rail". inlandrail.artc.com.au. Retrieved 2019-02-09.
- "Brado anuncia investimentos de R$30 milhões em vagões double stack na Intermodal South America".(in portuguese)
- "Rumo vence trecho de 1,5 mil quilômetros da Ferrovia Norte-Sul".(in portuguese)
- "非人狂想屋 | 你的火车发源地 » HXD1B牵引双层集装箱列车" (in Chinese). Retrieved 2020-07-01.
- "(PDF) Aerodynamic Effects Caused by Trains Entering Tunnels". ResearchGate. Retrieved 2020-07-01.
- "运能提高38%,国内首趟双层集装箱海铁联运班列舟山港首发". weibo.com. Retrieved 2020-07-01.
- "Double-decker container train arrives at Mundra". April 18, 2009. Archived from the original on January 10, 2013.
- "Salient features". Dedicated Freight Corridor Corporation of India Ltd. Archived from the original on February 26, 2014. Retrieved April 5, 2014.
- "Mombasa-Nairobi Standard Gauge Railway Project". Railway Technology. Retrieved 2019-02-09.
- Sanga, Benard. "SGR launches double-stack freight trains". The Standard. Retrieved 2019-02-09.
- "The Betuweroute solution". April 1, 2004. Archived from the original on 2011-10-05. Retrieved July 22, 2011.
- "Video: Saudi Arabian Railways Dammam Bound Double Stack Container Freight Train". YouTube.