GO 59 Floating dock

GO 59 is a Floating dry dock of the Marina Militare.[4]

History
Italy
Name: GO 59
Builder: Cantiere Navale Giacalone di Mazara del Vallo (Trapani)
Cost: 7 million[1]
Laid down: 2013
Launched: 2014
Acquired: 2011
Commissioned: march 2014
In service: 1
Homeport: Brindisi[2]
General characteristics
Type: Floating dry dock
Length:
  • - 70.00 m (229 ft 8 in) LOA[3]
  • - working length = 60.00 m (196 ft 10 in)
Beam:
  • - 19.0 m (62 ft 4 in)
  • - working beam = 14.0 m (45 ft 11 in)
Draught: 8.0 m (26 ft 3 in) (max)
Draft: 9.5 m (31 ft 2 in) (max)
Propulsion:
Notes: lifting capability 1.000 t (0.984 long tons)

History

Delivered to Arsenale Militare Marittimo di Augusta on 26 March 2014,[5][6] it was transferred to Stazione Navale di Brindisi on 24 February 2016.[7]
These are the technical specifications of MM for its realization.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.