I-ME-WE

I-ME-WE (India-Middle East-Western Europe) is a 13,000-kilometre (8,100 mi)[1] submarine communications cable system between India and France. The design capacity is 3.84 Terabits per second. It has been operational since 2009 with Tripoli, Lebanon being connected in November 2011.[2] Internet Service Providers and Network Operators hope to utilize the additional bandwidth to support high-bandwidth peer-to-peer IP-based broadband services such as multimedia streaming, broadband Internet and voice/video telephony.[3]

I-ME-WE
Owners:
consortium of 9 companies
Landing points
Total length13000 km
Design capacity3.84 Terabits/sec
Date of first use2009
Submarine communication cable linking France and India

The cable system includes a terrestrial link connecting the cities of Alexandria and Suez in Egypt. The I-ME-WE cable system comprises three optical fiber cable pairs and 2 trunk lines. It has cable landing stations at:

The cable system was funded by a consortium of 9 companies from across the world:[4]

The contract for the construction and maintenance of the cable system has been awarded to Alcatel-Lucent. Also, this network system extension is contracted to Mitsubishi Electric.

See also

Other cable systems following a substantially similar route are:

References

  1. "Alcatel-Lucent to build undersea cable". Business Standard. 2008-02-13. Retrieved 2008-02-13.
  2. "Bharti Airtel starts Mideast data services". Business Times Malaysia. 2009-12-29. Retrieved 2010-01-09.
  3. "Imewe Picks Alcatel-Lucent". UnStrung. 2008-02-11. Archived from the original on 2016-05-23. Retrieved 2008-02-13.
  4. Shanbhag, Raju (2008-02-11). "Global Telecom Leaders to Build I-Me-We Cable System". TMCnet. Archived from the original on 2011-07-17. Retrieved 2008-02-13.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.