Kier Group
Kier Group plc is a UK construction, services and property group active in building and civil engineering, support services, public and private housebuilding, land development and the Private Finance Initiative.
Type | Public limited company |
---|---|
LSE: KIE | |
Industry | Construction, Civil engineering, Support services, Property management |
Founded | 1928 |
Headquarters | 81 Fountain Street, Manchester[1] |
Key people | Matthew Lester, Chairman Andrew Davies, CEO |
Revenue | £3,475.6 million (2020)[2] |
£(195.6) million (2020)[2] | |
£(273.3) million (2020)[2] | |
Number of employees | 20,064 (2018)[3] |
Website | www.kier.co.uk |
Founded in 1928 in Stoke-on-Trent it initially specialised in concrete engineering before expanding into general contracting and house-building. Kier was listed as a public company on the London Stock Exchange from 1963 until it was acquired by Beazer in 1986. After a period under the ownership of Hanson plc, it was bought out by its management in 1992, expanded its housing interests, and was relisted on the London Stock Exchange in 1996. During the early 21st century, it expanded through acquisitions, and in September 2018 Kier was ranked, by turnover, as the second biggest UK construction contractor, behind Balfour Beatty.[4] It was a constituent of the FTSE 250 Index until its share price plunged following a failed rights issue in late 2018,[5] after which it started a restructuring, cost-cutting and disposals programme.
History
Foundation
The company was founded by Jorgen Lotz and Olaf Kier, Danish engineers, under the name Lotz & Kier in 1928, and it was based in Stoke-on-Trent.[6]
A few years later Lotz withdrew from the company, but Olaf Kier retained a semblance of his identity by including Lotz's initials in the organisation's new name, J.L. Kier & Co Ltd, which remained the company's principal title for over four decades.[7]
Pre-World War II
By the late 1930s Kier had moved its head office to Belgravia in Westminster, and thereby became neighbours to many of Britain's leading construction engineering consultants and contractors, who had formed a substantial coterie in Westminster for professionals and businessmen engaged in civil engineering. Immediate neighbours included Marples Ridgeway (builders of Hammersmith Flyover) and Edmund Nuttall (builders of both Mersey road tunnels).[8]
Concrete engineering
During its first 35 years, Kier became identified with certain civil engineering specialisms, such as contiguous cylindrical reinforced concrete grain silos and cement silos, using continuously sliding formwork; commencing with those at Barking in 1929, followed by grain silos at Northampton, Peterborough, Melksham, Gloucester and Witham; and cement silos at Norwich, Cambridge, Trinidad, and in India.[9]
Such specialist work was part of a pattern that quickly developed in the company's operations during that period, namely the undertaking of innovative, state-of-the-art civil engineering techniques at the forefront of modern technology. Other elements within this pattern were hyperbolic natural draft cooling towers (mostly around 300 ft high),[10] monolithic concrete chimneys (sometimes over 400 ft high),[11] complete power station structures,[12] and coastal works such as tanker berths, docks and harbours.[13]
In the same period, only this time in the building sector, Kier were in the vanguard of new reinforced concrete systems for use as framework for tall buildings. Their most famous contribution in this field was an eight-storey avant-garde development of apartment blocks named Highpoint, located in Highgate Village, north London. They were responsible for the reinforced concrete and general building.[14]
When this project was completed in 1935 it became widely renowned as the finest example of this form of construction for residential purposes. When Le Corbusier himself visited Highpoint in 1935 he said, "This beautiful building .... at Highgate is an achievement of the first rank."[15] And American critic Henry Russell Hitchcock called it, "One of the finest, if not absolutely the finest, middle-class housing projects in the world"[15] (in 1970 both Highpoint blocks were classified Grade I listed buildings).[16]
Kier dynasty
Olaf Kier sought to retain family leaders at the head of the organisation. However, his son by his first marriage was killed in a riding accident in 1945. Then, during the 1950s, Olaf's nephew, Mogens Kier, joined the firm's management structure, but did not progress to a leading position in the company. Olaf died in an accident in 1986, aged 87; and Mogens died in 2003.[17]
Post-World War II
J.L. Kier & Co Ltd remained a private company until 1963 when it obtained a listing on the London Stock Exchange and became a public company. Its offer for shares was many times oversubscribed. The Kier family retained a significant majority of the holding. In 1973 Kier merged with W. & C. French to form French Kier but within the French division there were heavy losses on fixed-price motorway contracts and land development. A long-serving Kier engineer, John Mott, was appointed chief executive in order to revive the group's fortunes. Following an abortive bid for Abbey in 1985, French Kier itself was the subject of a hotly contested bid by Beazer, which eventually succeeded in January 1986.[18]
Five years later (1991) Hanson plc bought Beazer plc[19] and made an early decision to dispose of the contracting arm, now known simply as Kier. This was the subject of a management buyout in July 1992,[20] with Hanson retaining a 10 per cent stake.[21]
In 1993 Kier decided to re-enter the housing market with the £30m acquisition of Twigden Homes. This was followed by acquisitions of the southern division of Miller Homes in 1996, Bellwinch in 1998, and Allison Homes in 2001. By 2004, Kier housing sales were over 1,000 units a year.[18] Kier was listed on the London Stock Exchange in 1996.[22]
21st century
In 2009, Mivan Kier, Kier's Romanian joint venture with the Northern Irish group Mivan, which invested in real estate projects in Bucharest, requested bankruptcy protection due to debts of €20 million.[23][24]
In 2013, Kier acquired the services firm May Gurney for £221 million,[25] becoming the then fourth largest contracting firm in the UK (behind Balfour Beatty, Carillion and Laing O'Rourke).[26] In June 2015 Kier completed the acquisition of Mouchel, a business which included infrastructure services and business services divisions, for £265 million;[27] Mouchel Infrastructure Services was rebranded as Mouchel Consulting, and sold to WSP Global in October 2016. In July 2017 Kier acquired McNicholas Construction, another UK infrastructure services provider.[28]
2018-2021 financial difficulties
After the liquidation of rival contracting and services provider Carillion in January 2018, Kier took on some Carillion staff and contracts: 150 Carillion workers employed on smart motorway joint ventures with Kier became Kier employees; 51 Carillion employees working on seven HS2 civil engineering packages awarded to the CEK joint venture were allowed to join Kier/Eiffage.[29][30][31] However, because Kier shared characteristics that contributed to Carillion's collapse - problem contracts, rising debts, and use of reverse factoring supply chain finance - City hedge funds began to 'short' Kier's shares; 10.9% were shorted by 30 August 2018,[32] later rising to 18%,[33] though Kier's position was not seen to be as risky as Carillion's.[34] The 2018 results were in line with City expectations - showing a pre-tax profit of £137m from stable revenue of £4.5 billion - with Kier outlining clear debt reduction plans.[35][36] On 15 November 2018, Kier announced the £24m sale of its Australian road assets business KHSA to joint venture partner Downer, saying sale proceeds would help reduce net debt[37] - £624m at 31 October 2018.[38]
However, on 30 November, Kier announced a £264m rights issue, priced at 409p, to pay down net debts;[38] the announcement led to Kier shares dropping almost 33%,[39] cutting Kier's stock market value by £329m to £492m.[40] The slide continued;[41] on 3 December shares were trading around 40% lower than before the rights issue announcement.[42] On 5 December, Kier was demoted from the FTSE 250 Index,[43] and its share price dropped below the rights issue price,[44][45] making it cheaper for investors to buy shares in the open market than in the rights issue, and leaving underwriters (Numis, Peel Hunt, Citigroup, HSBC and Santander) facing losses. Shares were also subject to renewed 'shorting'.[46] On 10 December, shares closed at 376.4p, a 15-year low.[47] Only 38% of the rights issue was taken up, with shares still trading below the rights issue price, at 385p, on 19 December.[48]
Following the rights issue result on 20 December 2018, shares fell by 13% to a 15-year low of 335p, but later recovered.[49][50] They were trading at 529p on 11 January 2019, when some shareholders sought changes in Kier's leadership team.[51] CEO Haydn Mursell subsequently resigned with immediate effect on 22 January (former Wates Group CEO Andrew Davies was announced as his successor on 19 March,[52] taking up the post on 15 April 2019).[53] In a trading statement Kier said the rights issue had helped reduce year-end net debt to £130m compared with £239m at the end of the previous year; average month-end net debt for the six months to 31 December 2018 was £370m, as compared with £410m for the previous six months.[54] On 28 January 2019, Kier shares dropped 4% after reports it would sell its housing maintenance arm to cut debt,[55] and the company was also reducing its waste management activities.[56]
On 11 March 2019, Kier revised its average net debt for the six months to December 2018 by over £50m from £130m to £180.5m, raising average month-end net debt over the period from £370m to £430m. These revisions followed £10.3m in adjustments to the group's hedging activities, and £40.2m in relation to development assets held for resale. It also warned of £25m of additional costs on its Broadmoor Hospital redevelopment. Shares fell by 12% to 437p.[57][58]
On 20 March 2019, Kier's half-year results showed a pre-tax loss of £35.5m in the second half of 2018 with revenues flat at £2,064m. As well as the Broadmoor provision, Kier lost £26m on a disputed waste collection contract which has been cut short, while integrating the McNicholas business and Kier restructuring added a further £15.4m to costs. Kier also highlighted "volume pressures" in its highways, utilities and housing maintenance markets.[59] In a 3 June 2019 profit warning, Kier said operating profits would be £25m lower than previously expected,[60] causing its share price to fall over 40%[61] - trading at about 150p, less than half the rights issue price, on 6 June.[62] Shares fell by over a third on 14 June, closing at 130.8p, after reports that Kier was looking to sell its housebuilding division.[63] On 17 June, Kier confirmed the housing division sale, and said it would wind down its property business and planned to exit the facilities management and environmental services markets "in due course". CEO Andrew Davies's business review included 1,200 job cuts.[64] Kier's share price fell 17% to 108p, a level not seen since the company's 1996 flotation,[65] and its shares were subject to renewed 'shorting' with one analyst saying "the consensus in the market is that Kier will go bust";[66][67] on 15 July 2019, Kier shares were the most 'shorted' on the London Stock Exchange, with shares falling 12.7% to 72.95p.[68] Amid concerns about Kier's future, the company was dropped from two major development schemes, in Leeds and London.[69]
In a trading update on 1 August 2019, Kier said average month-end net debt for the 2019 financial year was £422 million, with revenues £100m lower, and, after significant interest in its housing division, said it had started the sale process[70] (Guy Hands' Terra Firma Capital Partners was later reported to be among the bidders to acquire Kier Living).[71] It also announced the appointment of a new CFO, Simon Kesterton (adept at "the disposal of non-core assets, the reduction of overheads and cost control"), with effect from 19 September 2019.[70][72]
On 19 September 2019, Kier announced a £245m pre-tax loss on revenues of £4.5bn for the year to 30 June 2019, resulting from £341m in impairment costs and write-downs related to preparing businesses for sale, restructuring and loss-making contracts. The continuing restructuring had resulted in over 751 lay-offs, with a further 450 roles set to be axed.[73] The group also confirmed chairman Philip Cox would step down once a successor had been appointed[74] (in December 2019, it was confirmed former Royal Mail FD Matthew Lester would succeed Cox with effect from 1 January 2020).[75] In October 2019, Kier announced it was selling its Tempsford Hall headquarters in Bedfordshire to raise cash from its property assets.[76] At the group's AGM in November 2019, shareholders objected to CEO Andrew Davies's £2.6m annual remuneration package and an associated long-term incentive scheme.[77]
Half-year results announced on 5 March 2020 showed Kier made a pre-tax loss of £41.2m in the final six months of 2019 (marginally better than 2018's restated £45.3m loss); revenues were down 9% to £1,866m (2018: £2,053m). The cost-cutting process begun in 2018 had cut 1,200 jobs with another 50 set to leave by 30 June 2020. The sale of Kier Living was in progress, as was the process of closing Kier's Tempsford Hall head office,[78] set to complete in June 2020.[79] On 24 March 2020, as the financial impacts of the COVID-19 pandemic became clear, Kier's board of directors took a three-month 20% pay cut to mitigate the financial impact of the crisis, and warned employees' salaries might also be cut.[80] On 30 March, Kier announced all 6,500 Kier employees would have their base salary reduced by between 7.5% and 25% for three months from 1 April; it stepped up its cost reduction programme, bringing forward the closure of Tempsford Hall to 30 April[81] (head office functions were transferred to Manchester in mid April),[1] and paused the sale of its housebuilding business, Kier Living[82] (though Terra Firma revived talks about buying Kier Living in December 2020).[83] Kier also closed its Reading office with the loss of up to 40 jobs.[84]
On 1 July 2020, Kier announced it was considering a further rights issue to raise cash as average net debt had risen due to the impacts of the COVID-19 pandemic; average month-end net debt was up from £395m in December 2019 to £440m, and could rise to £485m.[85] Further job cuts were also likely.[86]
On 17 September 2020, Kier announced a £225.5m loss on the year to 30 June 2020, on revenues down 15% to £3,476m. The fall was partly due to COVID-19 impacts as well as 'challenging' market conditions throughout the year. Group headcount had been reduced by 1,700.[87] In a January 2021 trading update, Kier said average monthly net debt remained around £436m level; progress with the sale of Kier Living (which had suffered a pre-tax loss of over £89m in 2020) continued, with Kier hoping to receive around £100m for the business to help reduce debt; and Kier was aiming to make at least £105m in cost savings by the end of the financial year.[88]
Operations
The company has four divisions: Kier Construction, Kier Services, Kier Residential and Kier Property. These are further split into smaller companies.[89]
Major projects
Projects involving the company have included Highpoint I completed in 1935,[90] the North Terminal at Gatwick Airport completed in 1988,[91] the Lesotho Highlands Water Project completed in 1998,[92] Hairmyres Hospital completed in 2001,[93] High Speed 1 completed in 2007,[94] the Castlepoint shopping centre in Bournemouth in 2003,[95] the UK Supreme Court in London completed in 2009[96] and Snowhill Phase 2 in Birmingham completed in 2009.[97]
Kier Group is also involved in HS2 lots C2 and C3, working as part of a joint venture with Eiffage, due to complete in 2031.[98]
Controversies
Kier was revealed as a subscriber to the UK's Consulting Association, exposed in 2009 for operating an illegal construction industry blacklist, and was among 14 issued with enforcement notices by the UK Information Commissioner's Office.[99] Subsequently, Kier was among eight businesses involved in the 2014 launch of the Construction Workers Compensation Scheme,[100] condemned as a "PR stunt" by the GMB union, and described by the Scottish Affairs Select Committee as "an act of bad faith".[101] In December 2017, Unite announced it had issued high court proceedings against four former chairmen of the Consulting Association, included Danny O'Sullivan of Kier, alleging breach of privacy, defamation and Data Protection Act offences.[102] Unite also said it was taking action against 12 major contractors including Kier.[103]
Following a devastating fire in the Glasgow School of Art's Mackintosh Building on 15 June 2018, the school terminated its £25 million restoration contract with Kier on 29 June 2018.[104]
Kier was the main contractor in the failed DG One leisure centre in Dumfries.[105]
In October 2018, Kier was named as a 'poor payer' at a Parliamentary inquiry into small businesses, failing to pay 48% of invoices due within their agreed terms, leading some suppliers to refuse to work for the company.[106] In November 2019, Kier and subsidiary McNicholas Construction Services were suspended from the Prompt Payment Code for failing to pay 95% of all supplier invoices within 60 days.[107] Kier Construction was reinstated in December 2019;[108] Kier Highways and Kier Infrastructure & Overseas were reinstated in June 2020;[109] Kier Integrated Services was reinstated in August 2020,[110] but McNicholas Construction Services remained suspended until December 2020.[111]
References
- "Kier moves north". The Construction Index. 18 April 2020. Retrieved 20 April 2020.
- "Preliminary Results 2020". Kier Group. Retrieved 17 September 2020.
- "Annual Report 2018" (PDF). Kier Group. Retrieved 12 October 2018.
- Menary, Steve (22 September 2018). "TCI Top 100 Construction Companies 2018". The Construction Index. Retrieved 24 September 2018.
- "Kier rights issue fails to attract investors". Investors Chronicle. 24 December 2018. Retrieved 21 October 2019.
- Jones, Peter H.; Jones, Peter; Peter Jones, PH D.; Arup, Ove Nyquist (2006). Ove Arup, Masterbuilder of the 20th Century by Peter Jones, Page 54. ISBN 0300112963. Retrieved 2 December 2008.
- "J. L. Kier and Co". Grace's Guide. Retrieved 18 September 2018.
- "Obituary: Sir Nicholas Nuttall". Liverpool Daily Post. 9 August 2007. Archived from the original on 23 November 2008. Retrieved 18 September 2018.
- pps 28 & 29, Kier Corporate Blue Book, 1955 Edtn
- pps 17-19, Kier Corporate Blue Book, 1955 Edtn
- p 16, Kier Corporate Blue Book, 1955 Edtn
- pps 11-14, Kier Corporate Blue Book, 1955 Edtn
- pps 3-7, Kier Corporate Blue Book, 1955 Edtn
- pps 44 & 45, Kier Corporate Blue Book, 1955 Edtn
- "Highpoint One". OpenLearn. Retrieved 22 March 2015.
- "Buildings of Historic or Architectural Interest". millbanksystems.com. Retrieved 22 March 2015.
- Kierlink Archived 22 July 2011 at the Wayback Machine
- Wellings, Fred: Dictionary of British Housebuilders (2006) Troubador. ISBN 978-0-9552965-0-5
- Jonathan P. Hicks (17 September 1991). "COMPANY NEWS; Hanson to Buy Beazer In $609 Million Deal". The New York Times. Retrieved 18 August 2008.
- Connon, Heather (7 July 1992). "Hanson sells contract firms". Independent. Retrieved 18 September 2018.
- "Buy out, yes. Sell out, no". Contract Journal. 7 April 1994. Retrieved 18 August 2008.
- Kier Group London Stock Exchange
- "Mivan Kier JV declares insolvency", Bucharest Business Review, 9 August 2009
- "Vând avans de locuinţă", Evenimentul Zilei, 8 September 2009
- Kier completes £221m deal for May Gurney The Courier
- May Gurney joins Kier Group Construction Index, 8 July 2013
- Paton, Elizabeth (28 April 2015). "Kier confirms Mouchel takeover". Financial Times. ISSN 0307-1766. Retrieved 25 November 2015.
- "Kier buys £180m-turnover McNicholas". Construction News. 13 July 2017. Retrieved 13 March 2018.
- "Kier takes on Carillion JV staff". The Construction Index. 22 January 2018. Retrieved 22 January 2018.
- Morby, Aaron (22 January 2018). "Kier saves 200 Carillion staff jobs to complete JVs". Construction Enquirer. Retrieved 22 January 2018.
- Rhiannon Curry (22 January 2018). "Kier takes on Carillion staff for HS2 and motorways work". Telegraph.co.uk. Retrieved 7 July 2018.
- GCR staff (5 September 2018). "Carillion short sellers now targeting Kier". Global Construction Review. Retrieved 18 September 2018.
- Sheldon, Edward (18 September 2018). "Remember Carillion's collapse? Could this Neil Woodford-owned stock be next?". Motley Fool. Retrieved 19 September 2018.
- "Kier vs. Carillion - what can we learn?". Tussell. Retrieved 19 September 2018.
- Morby, Aaron (20 September 2018). "Kier targets £50m disposals to cut £375m debt". Construction Enquirer. Retrieved 20 September 2018.
- Vincent, Matthew (20 September 2018). "Opening Quote: Kier determined not to be the next Carillion". Financial Times. Retrieved 20 September 2018.
- Morby, Aaron (15 November 2018). "Kier raises £24m from Australian road business sell-off". Construction Enquirer. Retrieved 15 November 2018.
- Prior, Grant (30 November 2018). "Rising debts force Kier to launch £264m rights issue". Construction Enquirer. Retrieved 30 November 2018.
- "London Market Close: FTSE 100 Ends Week In Red As G20 Summit Kicks Off". Morning Star. 30 November 2018. Retrieved 30 November 2018.
- Davies, Rob (30 November 2018). "Kier construction shares lose 30% on plan to raise cash". Guardian. Retrieved 2 December 2018.
- Bow, Michael (3 December 2018). "Market report: Kier still on the ropes after shares suffer second knockdown". Evening Standard. Retrieved 3 December 2018.
- Champ, Hamish (4 December 2018). "Kier's shares plummet further in wake of rights issue". Building. Retrieved 4 December 2018.
- Bhunjun, Arvind (5 December 2018). "Top News: Hiscox and Spirax-Sarco Engineering Promoted to FTSE 100". LSE Alliance News. Retrieved 5 December 2018.
- Donnellan, Aimee (5 December 2018). "Tough Rump". Reuters. Retrieved 6 December 2018.
- Morby, Aaron (6 December 2018). "Kier drops out of FTSE 250 as share price dives". Construction Enquirer. Retrieved 6 December 2018.
- Wilson, Harry (7 December 2018). "Kier shares sink below price set for rights issue". Times. Retrieved 9 December 2018.
- Ralph, Alex (11 December 2018). "Falling share price piles pressure on ailing Kier". Times. Retrieved 11 December 2018.
- Morby, Aaron (20 December 2018). "Underwriters hit as Kier £250m rights issue flops". Construction Enquirer. Retrieved 20 December 2018.
- Hodgson, Camilla (20 December 2018). "Less than 40% of shareholders take up Kier rights issue". Financial Times. Retrieved 20 December 2018.
- Davies, Rob (20 December 2018). "Kier investors shun efforts to raise £264m in funds". Guardian.
- Prior, Grant (14 January 2019). "Shareholders pushing for Kier chiefs to be ousted". Construction Enquirer. Retrieved 14 January 2019.
- Kleinman, Mark (18 March 2019). "Embattled Kier picks chief left stranded by Carillion collapse". Sky News. Retrieved 18 March 2019.
- Maatouk, Michele (19 March 2019). "Kier appoints Andrew Davies as new CEO". Sharecast. Retrieved 23 March 2019.
- Morby, Aaron (22 January 2019). "Kier chief Haydn Mursell exits". Construction Enquirer. Retrieved 22 January 2019.
- Daniel, Alex (28 January 2019). "Kier shares fall again as investors react to reports it will sell housing maintenance arm to cut debt". City AM. Retrieved 31 January 2019.
- Morby, Aaron (28 January 2019). "Kier in talks to sell housing maintenance arm". Construction Enquirer. Retrieved 31 January 2019.
- Morby, Aaron (11 March 2019). "Kier in shock debt restatement". Construction Enquirer. Retrieved 11 March 2019.
- "Kier admits to higher debts and Broadmoor losses". The Construction Index. 11 March 2019. Retrieved 11 March 2019.
- Prior, Grant (20 March 2019). "Kier slumps to £35.5m loss as problem contracts continue". Construction Enquirer. Retrieved 20 March 2019.
- Prior, Grant (3 June 2019). "Kier in profit warning as problems spread to building division". Construction Enquirer. Retrieved 3 June 2019.
- Karunaratne, Nilushi (5 June 2019). "Kier woes point to restructuring". Investors Chronicle. Retrieved 6 June 2019.
- Head, Roland (6 June 2019). "Investors are taking a gamble on the Kier share price: here's what I'd do". Motley Fool. Retrieved 6 June 2019.
- Hickey, Shane (14 June 2019). "Kier shares plunge on report it wants to sell housing division". Guardian. Retrieved 16 June 2019.
- Prior, Grant (17 June 2019). "Kier cutting 1,200 jobs and selling housing arm". Construction Enquirer. Retrieved 18 June 2019.
- Kollewe, Julia; Davies, Rob (17 June 2019). "Kier Group to cut 1,200 jobs in attempt to avoid collapse". Guardian. Retrieved 18 June 2019.
- Ing, Will (21 June 2019). "Asset managers up bets against Kier share price". Building. Retrieved 21 June 2019.
- Loomes, Karl (25 June 2019). "Could Kier Group go bust?". Motley Fool. Retrieved 26 June 2019.
- Daniel, Alex (15 July 2019). "Short sellers circle Kier Group as contractor's turmoil continues". City AM. Retrieved 19 July 2019.
- Morby, Aaron (24 July 2019). "Kier dropped from major Leeds and London schemes". Construction Enquirer. Retrieved 24 July 2019.
- Prior, Grant (1 August 2019). "Kier close to selling housing division". Construction Enquirer. Retrieved 1 August 2019.
- Kleinman, Mark (9 December 2020). "Tycoon Hands wants to build new home with ailing Kier". Sky News. Retrieved 7 January 2020.
- "Kier Group plc: Appointment of Chief Financial Officer". London Stock Exchange. Retrieved 1 August 2019.
- Morby, Aaron (19 September 2019). "Kier plunges to £245m loss". Construction Enquirer. Retrieved 20 September 2019.
- Kollewe, Julia (19 September 2019). "Kier warns of Brexit fallout after £245m loss". Guardian. Retrieved 20 September 2019.
- Morby, Aaron (16 December 2019). "Kier names new chairman". Construction Enquirer. Retrieved 16 December 2019.
- Morby, Aaron (25 October 2019). "Kier to sell historic country HQ to pay down debt". Construction Enquirer. Retrieved 15 November 2019.
- Morby, Aaron (16 November 2019). "Kier suffers shareholder revolt over chief's pay". Construction Enquirer. Retrieved 18 November 2019.
- "Kier still losing money". The Construction Index. 5 March 2020. Retrieved 5 March 2020.
- Rogers, Dave (9 March 2020). "Kier to leave historic home this June". Building. Retrieved 9 March 2020.
- Morby, Aaron (24 March 2020). "Kier board takes 20% pay cut for three months". Construction Enquirer. Retrieved 24 March 2020.
- "Kier cuts salaries by up to 25%". The Construction Index. 30 March 2020. Retrieved 30 March 2020.
- Price, David (30 March 2020). "Kier pauses sale of housebuilding arm and cuts salaries". Construction News. Retrieved 30 March 2020.
- Kleinman, Mark (2 December 2020). "Hands up for fresh effort to build future with Kier Living". Sky News. Retrieved 3 December 2020.
- Morby, Aaron (1 April 2020). "Kier closes Reading office with over 40 job losses". Construction Enquirer. Retrieved 1 April 2020.
- Morby, Aaron (1 July 2020). "Kier eyes rights issue as debt rises to £440m". Construction Enquirer. Retrieved 1 July 2020.
- Price, David (1 July 2020). "Kier cuts more jobs as net debt spikes". Construction News. Retrieved 1 July 2020.
- "Kier posts £225m loss". The Construction Index. 17 September 2020. Retrieved 17 September 2020.
- Morby, Aaron (19 January 2021). "Kier continues to battle with high debts". Construction Enquirer. Retrieved 19 January 2021.
- "Organisational Structure". Kier Group plc. Archived from the original on 30 December 2012. Retrieved 27 January 2015.
- "Highpoint I". Engineering Timelines. Archived from the original on 28 September 2011.
- "Gatwick Airport North Terminal Development" (PDF). Entech. Archived from the original (PDF) on 6 October 2011.
- Nicholas Hildyard (10 July 2002). "The Lesotho Highland Water Development Project - What Went Wrong? - The Companies". The Corner House. Retrieved 18 August 2008.
- "PFI Data Sheet - Hairmyres Hospital" (PDF). Government of Scotland. Retrieved 18 August 2008.
- "CTRL Contract 103". World Tunnelling. 1 May 2001.
- "Castelpoint: Who will pay?". Daily Echo. 25 August 2006. Retrieved 22 August 2012.
- "Kier given go-ahead on Supreme Court". Contract Journal. 4 April 2007.
- "Snowhill builder holding steady despite the crunch". Birmingham Post. 16 May 2008. Retrieved 18 August 2008.
- "HS2 contracts worth £6.6bn awarded by UK government". the Guardian. 17 July 2017. Retrieved 13 October 2017.
- "Construction blacklist". ICO. ICO. Retrieved 7 September 2015.
- "Construction blacklist compensation scheme opens". BBC News: Business. BBC. 4 July 2014. Retrieved 7 September 2015.
- "Scottish Affairs - Seventh Report Blacklisting in Employment: Final Report". www.parliament.uk. Scottish Affairs Select Committee. Retrieved 7 September 2015.
- "Union sues blacklist ringleaders". The Construction Index. 4 December 2017. Retrieved 4 December 2017.
- Prior, Grant (4 December 2017). "Unite launches new round of blacklisting legal action". Construction Enquirer. Retrieved 4 December 2017.
- Marc Horne (31 December 2017). "Glasgow fires as devastating as IRA bomb in Manchester, says MP | Scotland". The Times. Retrieved 2 July 2018.
- "DG One build inquiry - Dumfries and Galloway Council". www.dumgal.gov.uk. Retrieved 24 June 2019.
- Marshall, Jordan (9 October 2018). "Kier outed as 'poor payer' at parliamentary inqury into small businesses". Building. Retrieved 9 October 2018.
- "Late-paying Kier suspended from Prompt Payment Code". The Construction Index. 4 November 2019. Retrieved 4 November 2019.
- Morby, Aaron (20 December 2019). "Kier Construction reinstated to Prompt Payment Code". Construction Enquirer. Retrieved 23 December 2019.
- "Kier Highways and Seddon readmitted to Prompt Payment Code". The Construction Index. 3 June 2020. Retrieved 3 June 2020.
- Garner-Purkis, Zak (13 August 2020). "Prompt payment redemption for Kier Integrated Services and FM Conway". Construction News. Retrieved 13 August 2020.
- "Kier fully reinstated to Prompt Payment Code". The Construction Index. 17 December 2020. Retrieved 17 December 2020.