Line 1 (Shijiazhuang Metro)

Line 1 of the Shijiazhuang Metro (Chinese: 石家庄地铁一号线; pinyin: Shíjiāzhuāng Dìtiě Yī Hào Xiàn) is a rapid transit line in Shijiazhuang, Hebei province, China. Currently it is 34.3 km (21.3 mi) long with 26 stations. The line opened on 26 June 2017.

Line 1
 1 
Overview
StatusOperational
OwnerShijiazhuang
LocaleShijiazhuang, Hebei, China
TerminiXiwang - Fuze (current)
Huai'anlu - Dongyang (future)
Stations26 (current)
30 (future)
Service
TypeRapid transit
SystemShijiazhuang Metro
Services1
Operator(s)Shijiazhuang Metro Corporation
History
Opened26 June 2017 (2017-06-26)
Technical
Line length34.3 km (21.3 mi) (current)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8 12 in)
Route map

Zhangying Depot
Xiwang
Shiguangjie
Changchengqiao
Hepingyiyuan
Minxin River
Lieshilingyuan
Xinbaiguangchang  3 
Jiefangguangchang
Ping'andajie
Beiguoshangcheng  2 
Bowuyuan
Tiyuchang
Beisong
Tangu
Zhaohuiqiao
Baifo
Liucun
Huojuguangchang
Shijiazhuangdongzhan
Nancun
Xiaohedadao
Xizhaotong Depot
Xizhuang
Dongzhuang
Huizhanzhongxin
Shangwuzhongxin
Yuanboyuan
Fuze
Phase II North section
Dongshangze
Dongyang

History

Phase 1

Phase 1 of the line began construction on 1 July 2013 and began service on 26 June 2017, completed at a cost of ¥18.892 billion.[1]

Phase 2 initial section

The Phase II of Line 1 is 13.495 km (8.4 mi)[2] with 8 stations.[3] Only 6 stations from Xiaohedadao to Fuze (10.4 km[4]) opened on 26 June 2019.

Phase 2 North section

Two more stations, Dongshangze and Dongyang will open later. The tunnel from Fuze to Dongshangze is completed on 25 August 2020.[5]

Phase 3 (Southwest extension)

The Phase 3 will add two more stations (Huai'anlu and Shangzhuang) in Southwest of the line. The extension is under planning.

Opening timeline

SegmentCommencementLengthStation(s)Name
Xiwang — Xiaohedadao 26 June 2017 23.9 km (14.9 mi)[6] 20 Phase 1
Xiaohedadao — Fuze 26 June 2019 10.4 km (6.5 mi)[7] 6 Phase 2 (initial section)

Stations

Phase Station name Connections Distance
km
Location
English Chinese
Phase 3 Huai'anlu 槐安路
Shangzhuang 上庄
Phase 1 Xiwang 西王 Qiaoxi
Shiguangjie 时光街
Changchengqiao 长城桥
Hepingyiyuan 和平医院
Lieshilingyuan 烈士陵园
Xinbaiguangchang 新百广场  3 
Jiefangguangchang 解放广场
Ping'andajie 平安大街
Beiguoshangcheng 北国商城  2  Chang'an
Bowuyuan 博物院
Tiyuchang 体育场
Beisong 北宋
Tangu 谈固
Zhaohuiqiao 朝晖桥
Baifo 白佛 Yuhua
Liucun 留村
Huojuguangchang 火炬广场
Shijiazhuangdongzhan 石家庄东站 SXP
Nancun 南村 Chang'an
Xiaohedadao 洨河大道
Phase 2 Xizhuang 西庄
Dongzhuang 东庄
Huizhanzhongxin 会展中心 Zhengding
Shangwuzhongxin 商务中心
Yuanboyuan 园博园
Fuze 福泽
Dongshangze 东上泽
Dongyang 东洋

Rolling stock

Services are provided by CRRC Tangshan Type A rolling stock, which are operated in six-car sets that hold up to 2520 passengers each.[8]

References

  1. "石家庄地铁1号线建成通车 "高颜值"地铁首次驶进石家庄". china.com (in Chinese). 26 June 2017. Retrieved 28 December 2017.
  2. http://build.workercn.cn/33129/201905/22/190522150556817.shtml
  3. "石家庄地铁1号3号线二期最新规划 2019年通车". soku.com (in Chinese). 30 August 2017. Retrieved 28 December 2017.
  4. http://hebei.hebnews.cn/2019-06/09/content_7415427.htm
  5. "e周关注(2020.8.23-8.29)". 2020-08-30. 8月25日,四公司石家庄地铁一号线二期03标福东区间右线隧道顺利贯通 (The tunnel from Fuze to Dongshangze is completed on August 25, 2020.)
  6. http://www.cnr.cn/hebei/jrhb/20170627/t20170627_523821373.shtml
  7. http://hebei.hebnews.cn/2019-06/09/content_7415427.htm
  8. "石家庄地铁开通 河北正式迈入"地铁时代"". 2017-06-27.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.