Line 2 (Taiyuan Metro)
The Line 2 of Taiyuan is the first line of Taiyuan metro, as well as the first line in Shanxi. The line opened on December 26, 2020.[1]
Line 2 | |
---|---|
Overview | |
Status | Operating |
Service | |
Type | Rapid Transit |
System | Taiyuan Metro |
Daily ridership | 211,000 (2020 Peak)[2] |
History | |
Commenced | 2016 |
Opened | December 26, 2020 |
Technical | |
Line length | 23.647[3] km (14.694 mi) |
Character | Underground |
Stations
Phase 1 of Line 2 extends from Jiancaoping station in the north to Xiqiao station in the south and has 23 stations.[3]
Phase 1 of Line 2 | |||
---|---|---|---|
Name | District | Distance | |
English | Chinese | ||
Jiancaoping | 尖草坪站 | Jiancaoping | |
Jianhe | 涧河站 | ||
Shenglijie | 胜利街站 | Xinghualing | |
Dabeimen | 大北门站 | ||
Jihuying | 缉虎营站 | ||
Fuxijie | 府西街站 | ||
Kaihuasijie | 开化寺街站 | Yingze | |
Dananmen | 大南门站 | ||
Tiyuguan | 体育馆站 | ||
Nanneihuan | 南内环站 | ||
Wangcunnanjie | 王村南街站 | Xiaodian | |
Changfengjie | 长风街站 | ||
Xuefujie | 学府街站 | ||
Nanzhonghuan | 南中环站 | ||
Jinyangjie | 晋阳街站 | ||
Longxingjie | 龙兴街站 | ||
Longchenggongyuan | 龙城公园站 | ||
Jiajie | 嘉节站 | ||
Dianzixijie | 电子西街站 | ||
Kangningjie | 康宁街站 | ||
Tongdajie | 通达街站 | ||
Huazhangxijie | 化章西街站 | ||
Xiqiao | 西桥站 |
Construction
Line 2 began construction on March, 2016, as of July 2020, construction of all 23 stations are complete.[4]
In phase 1, it has a total length of 23.647 km, 23 stations,[3] 2 electrical stations and 1 control centre.
References
- "First phase of Taiyuan Subway Line 2 put into operation - Xinhua | English.news.cn". www.xinhuanet.com. Retrieved 2020-12-27.
- 新华网. "太原地铁开通三天 客运量已超51万人次". 新华山西 (in Chinese).
- "23座站点名等公示".
全长23.647公里,设车站23座
- "Taiyuan Gov".
- "地铁2号线将安装各类摄像头3500个".
- "全自动无人驾驶列车运抵太原地铁2号线".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.