Line 3 (Suzhou Rail Transit)
Line 3 is an east-west line of Suzhou Rail Transit. The line is 45.272 kilometers long.[2] The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.
Line 3 | |
---|---|
3 | |
Map of Line 3 | |
Overview | |
Status | In operation |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | Suzhou Xinqu Railway Station Weiting |
Stations | 37 |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
History | |
Opened | 25 December 2019[1] |
Technical | |
Line length | 45.272 km[2] |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Line 3 started trial operations from December 6 to December 10, 2019.[3] Official operation started on December 25, 2019.[1]
Stations
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Suzhou Xinqu Railway Station | 苏州新区火车站 | 6 ITH | 0.00 | 0.00 | Huqiu | |
Huichanglu | 惠昌路 | |||||
Wenchanglu | 文昌路 | |||||
Changting | 长亭 | |||||
Tongdun | 铜墩 | |||||
Mayunlu | 马运路 | |||||
Xijinqiao | 西津桥 | 8 | ||||
Heshan | 何山 | |||||
Shizishan | 狮子山 | 1 | ||||
Shishanlu | 狮山路 | |||||
Shajinqiao | 沙金桥 | |||||
Suoshanqiao West | 索山桥西 | 5 | ||||
Hengshan | 横山 | |||||
Hengtang | 横塘 | |||||
Shihu North | 石湖北 | |||||
Xinguo | 新郭 | Gusu | ||||
Panlilu | 盘蠡路 | 2 | Wuzhong | |||
Baodailu | 宝带路 | 4 | ||||
Yingchunlu | 迎春路 | |||||
Beiganglu | 北港路 | SIP | ||||
Tongyuanlu South | 通园路南 | 7 | ||||
Shupulu North | 墅浦路北 | |||||
Dongzhenlu | 东振路 | |||||
Jinsheqiao | 金厍桥 | 5 | ||||
Ligongdi West | 李公堤西 | 6 | ||||
Dongfangzhimen | 东方之门 | 1 | ||||
Yanyuqiao | 烟雨桥 | |||||
Nibang | 泥浜 | |||||
Tangzhuang | 唐庄 | 8 | ||||
Kuatang | 跨塘 | |||||
Suzhou Yuanqu Railway Station | 苏州园区火车站 | 8 KAH | ||||
Fangwanjie | 方湾街 | |||||
Fenghelu | 丰和路 | |||||
Shuangmajie | 双马街 | |||||
Fengtingdadao | 葑亭大道 | 5 | ||||
Gexiangjie | 戈巷街 | |||||
Weiting | 唯亭 | S1 | ||||
Map
Future Development
Line 3 can interchange with Line S1 of Suzhou Rail Transit in 2023. Line S1 of Suzhou Rail Transit (opening in 2023) will serve Kunshan city and interchange with Shanghai Metro (Line 11).[4]
Gallery
- An image of Exit 6b of Ligongdi West Station, under construction, taken a few weeks before the opening.
- An image of Exit 2 of Ligongdi West Station, under construction, taken a few weeks before the opening.
References
- "苏州轨道交通3号线明日(12月25日)11点30分开通". 2019-12-24.
- "轨交3号线铺轨,预计2019年底试运营". 2018-01-10.
- "轨交3号线试乘首日迎来众多市民"打卡"". 2019-12-07.
此次“万人试乘”活动时间为12月6日至10日,为期5天。每天试乘时限为7:00至19:00
- "上海11号线、17号线有望接轨苏州S1线、4号线". sh.sina.com.cn. Retrieved 2016-08-26.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.