Llandudno Junction railway station

Llandudno Junction railway station (Welsh: Cyffordd Llandudno) is on the Crewe to Holyhead North Wales Coast Line. The station is managed by Transport for Wales, although Avanti West Coast also serves it.

Llandudno Junction

Welsh: Cyffordd Llandudno
Llandudno Junction railway station (March 2018)
LocationLlandudno Junction, Conwy County Borough
Wales
Coordinates53.284°N 3.809°W / 53.284; -3.809
Grid referenceSH794778
Managed byTransport for Wales
Platforms4
Other information
Station codeLLJ
ClassificationDfT category C2
History
Original companyChester and Holyhead Railway
Pre-groupingLondon and North Western Railway
Post-groupingLondon Midland and Scottish Railway
Key dates
1 October 1858 (1858-10-01)First station opened
16 June 1863Conwy Valley Line opened
1 October 1897Present station opened
Passengers
2015/16 0.331 million
 Interchange  81,372
2016/17 0.320 million
 Interchange  72,643
2017/18 0.317 million
 Interchange  95,023
2018/19 0.322 million
 Interchange  83,058
2019/20 0.301 million
 Interchange  117,672
Notes
Passenger statistics from the Office of Rail and Road

It is a junction for trains to Llandudno and the Conwy Valley Line, and is the busiest station in North Wales, in both frequency of services and passenger numbers.

History

The original station (located to the west of the current station) was opened on 1 October 1858[1] and served the branch line to Llandudno. Built by the St. George's Harbour and Railway Company in 1858, this branch line heads north through Deganwy before terminating in the town. Before the completion of the junction station, the branch line trains from Llandudno ran through to Conwy.

This was followed by the opening of a second branch line in 1863 – the Conwy Valley Line – which headed south and was built by the Conway and Llanrwst Railway, and became part of the LNWR in 1867. It follows the valley of the River Conwy to Llanrwst (where it originally terminated) and Betws-y-Coed (a later terminus in 1869), then follows the Lledr Valley and a two mile long tunnel to terminate at Blaenau Ffestiniog, where passengers can join the Ffestiniog Railway.

Initially the Conwy Valley line ran into a separate platform on the south side of the station, and a refreshment room was built in 1864. But more space was needed to cope with both main line and branch-line traffic, and on 1 October 1897 the present station was opened[1] on a much larger site, the two island platforms offering six through lines with two bays at each end (a total of four through platforms and four bay platforms). The opening of the new station allowed the demolition of the former station, but also entailed a diverting of the Conwy Valley branch, which now joined the main line some half a mile further east. The old formation was used to store locomotives.

Three of the platforms on the southern side (both bays and the down loop) were taken out of use in 1968 when the easternmost of the two signal boxes was closed and the track layout altered. In 1983 the branch junction was again moved slightly eastwards to allow a new freight terminal (now disused) to be built to replace the original goods yard and another at nearby Colwyn Bay that had been closed before the start of the A55 road widening scheme the previous year.

The 1985-built Llandudno Junction signal box

The station was also remodelled once more and resignalled at this time, and in 1985 a new power signal box was commissioned at the western end,[2] which now controls the station area and junctions along with the main line between Colwyn Bay and Conwy and the northern end of the Conwy Valley branch (using the electric token system). The token machine for the branch is located at the station rather than in the signal box for operational convenience, allowing drivers to collect or return their token (with the cooperation of the signaller) whilst station work is undertaken, rather than having to make an additional stop at the box to make the exchange.

The station was also formerly the site of a motive power depot (which closed in 1966). It was given the code 7A by the London, Midland and Scottish Railway, which was altered to 6G by British Railways in March 1952.[3] This had been located just south east of the station, and its site, together with the former adjoining goods yard, now have been redeveloped, but the new flyover road across the site bears the name 6G.

Layout

Llandudno Junction and branches
to Chester
to Blaenau Ffestiniog
Llandudno Junction
Branch
to Deganwy and Llandudno
to Holyhead
Station entrance and car park

The station currently has four operational platforms:

  • Platform 1 is used by eastbound trains to Chester, Crewe, Birmingham New Street, Cardiff Central, London Euston and Blaenau Ffestiniog. It is also signalled for use by trains to Llandudno.
  • Platform 2 is a bay platform used by the hourly shuttle service to Llandudno. It is also used for stabling trains overnight.
  • Platform 3 is a bidirectional platform which can be used by all services. It is mainly used for westbound trains, but at busy periods can be used for eastbound trains as well.
  • Platform 4 is used by services to Bangor, Holyhead and Llandudno. It is also signalled for trains to Blaenau Ffestiniog (the first branch train of the day often leaves from here).

A bus shelter in the station car park is numbered as platform 5, and is used for local bus services as well as rail replacement services when the railway is closed for engineering work.

Facilities

The station is staffed throughout the day, with the ticket office on platforms 1 and 3. Self-service ticket machines are also available and for collecting pre-paid/advance purchase tickets. Other facilities on offer (all on platforms 1–3) include a waiting room, toilets, a cafe and public telephone. Platform 4 has a canopy and customer help point only. Train running information is provided by poster boards, digital information screens and automated announcements. Step-free access is available from the station entrance to all platforms via lifts integrated into the main footbridge that links them.[4]

Services

A Virgin Trains Class 221 Super Voyager at platform 3, bound for Holyhead.
175112 on a North Wales Coast Line service passes 150264 operating a Conwy Valley Line service, both headed to Llandudno.

On Sundays services run hourly to Holyhead and Crewe (limited service to Cardiff Central and Birmingham International) on the main line, along with a half-hourly shuttle to Llandudno and there are four trains to London. There are also four trains each way on the Blaenau Ffestiniog branch (these run all year since the winter 2019 timetable change).

Preceding station   National Rail   Following station
Transport for Wales
Transport for Wales
Transport for Wales
North Wales Coast Line
Avanti West Coast
London Euston-Holyhead

References

  1. Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. p. 145. ISBN 1-85260-508-1. R508.CS1 maint: ref=harv (link)
  2. Signalling Around The Junction www.6g.nwrail.org.uk; Retrieved 2010-06-09
  3. Walford, John (2012). A Detailed History of British Railways Standard Steam Locomotives - Volume Five: The End of an Era. Maidenhead: RCTS. p. 17. ISBN 978-0901115-973.CS1 maint: ref=harv (link)
  4. Llandudno Junction station facilities National Rail Enquiries; Retrieved 13 January 2017
  5. GB eNRT December 2019 Edition, Table 81 (Network Rail)
  6. GB eNRT December 2019 Edition, Table 102 (Network Rail)
  7. Table 65 National Rail timetable, December 2019 (Network Rail)

Further reading

  • Mitchell, Vic; Smith, Keith (2010). Bala to Llandudno. West Sussex: Middleton Press. figs. 101-109. ISBN 9781906008871. OCLC 668198724.
  • Mitchell, Vic; Smith, Keith (2012). Rhyl to Bangor. West Sussex: Middleton Press. figs. 41-57. ISBN 9781908174154. OCLC 859594415.CS1 maint: ref=harv (link)
  • Rear, W.G. (1991). The Conwy Valley Line. Foxline Publishing.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.