M-14 motorway (Pakistan)

The Islamabad–Dera Ismail Khan Motorway (اسلام آباد – ڈیره اسماعیل خان موٹروے), also known as the Brahma Bahtar–Yarik Motorway, is a four-lane North-South motorway currently under-construction in Pakistan. The 285-kilometre-long (177 mi) motorway is being developed as part of the Western Alignment of the China–Pakistan Economic Corridor,[2][3] and will offer high speed road connections between the Islamabad-Rawalpindi metropolitan area, and the southern parts of Khyber Pakhtunkhwa province around Dera Ismail Khan. Work at this Motorway is being done at a very slow pace. It has already missed many completion targets. This Motorway was originally planned to open at the end 2018. Now it is said that it will be open for Public in June 2021.

M–14 Motorway
Route information
Maintained by National Highway Authority
Length285 km[1] (177 mi)
Major junctions
North endIslamabad
  N-15 National Highway
South endDera Ismail Khan
Highway system
Roads in Pakistan

Map

Route

Groundbreaking ceremony took place in May 2016. The four-lane controlled access motorway will extend from the Hakla Interchange on the M1 Motorway, near Fateh Jang in Punjab, to Dera Ismail Khan in Khyber Pakhtunkhwa.[4]

From Hakla, Fateh Jang, the motorway will extend in a southwestern direction passing the towns of Pindi Gheb, Tarap, and Mianwali. The route will transverse the Sindh Sagar Doab region, and cross the Indus River near Mianwali before entering into Khyber Pakhtunkhwa. The motorway will continue on wards before terminating near the town of Yarik, just north of Dera Ismail Khan.[5]

At the southern terminus of the new Islamabad-Dera Ismail Khan motorway, the N50 National Highway will also be upgraded between Dera Ismail Khan-Zhob and between Zhob-Quetta.[6]

Specifications

The Motorway includes provision of 11 interchanges, 19 flyovers (6 lanes), 15 bridges (4 lane), 74 underpasses, 259 culverts, and three major bridges (6 lane); one at River Sawan, second at River Indus and third at River Koram. This motorway have a 100 meter wide right of way in order to widen the four lane road to six lanes in future as traffic volume increases.[7]

Construction

Pakistan's executive committee of the National Economic Council approved construction of this section of roadway in April 2016.[8] while construction commenced in May 2016.[9] Construction is expected to be completed by June 2020.[5][10]

Construction is to proceed in five phases:[11]

  • Phase 1: Yarik-Rehmanikhel section (Contract has been awarded to M/s NLC).
  • Phase 2: Rehmanikhel-Kot Belian section (Contract has been awarded to M/s SKB-KNK JV)
  • Phase 3: 55-kilometre (34 mi) Beruli-Tarap section (Contract has been awarded to M/s FWO)
  • Phase 4: 62-kilometre (39 mi) Tarap-Pindi Gheb section (Contract has been awarded to M/s Limak-ZKB JV)
  • Phase 5: 63-kilometre (39 mi) Pindi Gheb-Hakla Interchange section (Contract has been awarded to M/s Limak-ZKB JV)

[12]

See also

References

  1. http://nha.gov.pk/wp-content/themes/nha/images/map-full.jpg
  2. "China to finance 90% of Sukkur-Multan Motorway". Daily Times. 12 May 2016. Retrieved 13 May 2016.
  3. nha.gov.pk/wp-content/uploads/2016/07/Press-Release-30.06.2016.pdf
  4. "PM Nawaz performs groundbreaking of Motorway in D.I Khan". The News. 17 May 2016. Retrieved 19 May 2016.
  5. "China–Pakistan Economic Corridor (CPEC) Western Route: New Four-Lane Highway Facility from Barahma Bahtar to D. I. Khan as Part of Western Route of China–Pakistan Economic Corridor (CPEC) 285 km Approx., Packages: I To V." (PDF). National Highway Authority. National Highway Authority. p. 38. Retrieved 2 February 2016.
  6. "Parliamentary Body Monitoring Progress of CPEC". Business Recorder. 9 January 2016. Retrieved 16 January 2016.
  7. "Ecnec approves motorway from Burhan/Hakla to DI Khan". www.thenews.com.pk.
  8. Haider, Mehtab (24 April 2016). "Ecnec approves motorway from Burhan/Hakla(on M1) to DI Khan". The News. Retrieved 4 May 2016.
  9. "PM Nawaz performs groundbreaking of Motorway in D.I Khan". www.thenews.com.pk.
  10. "CHINA – PAKISTAN ECONOMIC CORRIDOR (CPEC) WESTERN ROUTE: NEW FOUR LANE HIGHWAY FACILITY FROM BARAHMA BAHTAR TO D. I. KHAN AS PART OF WESTERN ROUTE OF CHINA – PAKISTAN ECONOMIC CORRIDOR (CPEC) 285 KM APPROX., PACKAGES: I TO V." (PDF). National Highway Authority. National Highway Authority. p. 38. Retrieved 2 February 2016.
  11. National Highway Authority (Pakistan). (PDF). p. 61 http://pid.gov.pk/NHA.pdf. Retrieved 13 May 2016. Missing or empty |title= (help)
  12. "Hakla-D.I. Khan Expressway To Be Completed Next Year – Pak China News". pakchinanews.pk.
  • nha.gov.pk/wp-content/uploads/2016/07/Press-Release-30.06.2016.pdf
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.